ML19317D706
| ML19317D706 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 11/30/1974 |
| From: | DUKE POWER CO. |
| To: | |
| Shared Package | |
| ML19317D702 | List: |
| References | |
| NUDOCS 7912060925 | |
| Download: ML19317D706 (1) | |
Text
.
ocene. Unit 3 y,,,
. DATE 12/5/74 W
DOCKET NO MTING STATUS
~
l 1.
REPORTING PERIOD:
November 1, 1974 Tl! ROUGH November 30. 1974 l
HOURS IN REPORTING PERIOD:
720 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWthi 2568 MAX. DEPENDABLE CAPACITY (MWe. NET, 3.
IDWESTPOWER LEVELTO WHICH SPECIFICALL) RESTRICTED (IF ANY (MWc NET): None l
_4._. REASONS FOR RESTRICTION (IF ANYl:
Unit not in Commercial operation.
l THIS Ct'MULATIVE
(
REPORTING PI RIOD YR TO DATE TO DATE 5.
HOURS REACTOR WAS CRITICAL.
6.
REACTOR RESERVE SHUTDOWN HOURS M/A 7.
HOURS GENERATOR ON LINE.......
N/A B.
UNIT RESERVE SHUTDOWN HOURS...........
N/A I
9.
GROSS THERMAL ENERGY GENERATED (MWH)
N/A 10 GROSS ELECTRICAL ENERGY CENERATED (MWH)
N/A 11.
NET ELECTRICAL ENERGY GENERATED (MWH)
N/A 12'.
REACTOR AVAILABILITY F ACTOR (1).........
N/A 13.
UNIT AVAILABILITY F ACTOR (2)
N/A 14 UNIT CAPICITY FACTOR (3)
W/A 15.
UNIT FORCED OUTAGE RATE (4)............
N/A 16.
SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTiiS (STATE TYPE.DATE. AND DUR ATION OF EACH):
.17.
IF SHUT DOWN AT END OF REPORT PERIOD. ESTIMATED DATE 01 STARTUP:
IL UNITS IN TEST STATUS (PRIOR TO COMMERCI AL OPERATION) RE PORT THE FOLLOWING:
DATE LAST DkTE l
FORECAST ACleEVED INITIAL CRITICALITY 9/5/74 INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION 12/31/74 1
^
^
(1) REACTOR AVAILABILITY FACTOR =
X 100 HOURS th REPORTING P1 RIOD HOURS Gl:NER ATOR ON LINE (2)
UNIT AVAILABILITY FACTOR
=
HOURS IN REPORTING P1 RIOD
=
NET ELITTRICAL POWPR GF NE R ATFD N)
UNIT CAPACITY FACTOR
=
MAX.DLPENDABLI.t'APACITT IMWe htT) X HOURhlN RtPORflNU PtKlOD FORCED OUTAGE ilOL*RS (4) UNIT FORCED OUTAGl: RATE
=
HOURS GCNERATOR ON LINE + FORCED OUTAGE HOURS
~
.g e n o e u f25 '
_ _. --.-