Oconee Unit 2 UNIT DATE 50-270 DOCRET NO.
WERATING STATUS 1.
REPORTING PERIOD.
November 1, 1974 TilROUGH November 30. 1974 HOURS IN REPORTING PERIOD:
720 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWthe 2568 MAL DEPENDAllLE cal'ACITY (Mwe NET, 871 None 3.
LOWEST POWER LEVEL TO WHICH SPECIFICALL) RESTRICTED (It ANY)(MWc. NET):
4.
REASONS FOR RESTRICTION (IF ANYl:
THIS CL*MULATIVE R IPORTING PI RIOD YR TO DATE TO DATE 720.0 1389.0 1389.0 l
S.
HOURS REACTOR WAS CRITICAL.
6.
REACTOR RESERVE SHUTDOWN HOURS 0
0 0
1 7.
HOURS GENERATOR ON LINE....
720.0 1343.9 1343.9 0
0 0
l E.
WIT RESERVE SHUTDOWN HOURS..
l 9.
GROSS THERM AL ENERGY 1714810 3052649 3052649 i
GENERATED (MWri:
10.
GROSS ELECTRICAL E NERGY 589324 1045320 1045320 GENERATED (MWHp 11.
NET ELECTRICAL ENERGY GENERATED W 7CA onAoAo 986969 OfwH) 100.0 69.7 69.7 12.
REACTOR AVAILABILITY F ACTOR (1).........
100.0 67.4 67.I.
13.
UNIT AVAILABILITY F ACTOR (2) 89.6 56.9 56.9 34.
UNITCAPACITY F ACTOR (3) 0 32.3 32.3 15.
UNIT FORCED OUTAGE RATE (4)........
16.
SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE.DATE. AND DUR ATION OF EACH):
17.
IF 5 HUT DOWN AT END OF REPORT PERIOD. ESTIM ATED DATE 01 STARTUP:
18.
UNITS IN TE5T STATUS (PRIOR TO COMMERCI AL OPERATION) RLPORT THE FOLLO%ING:
DATE LAST DkTE FORECAST ACH'IEVED INITIALCRITICALITY INITIAL ELECTRICAL POWER GENER ATION COMMERCIAL OPERATION HOURS Rl: ACTOR WAS CRITICAL (1) REACTOR AVAILABILITY FACTOR HOURS th REPORTING P! RIOD HOURS Gl:NER ATOR ON LINE Q) UNIT AVAILABILITY F ACTOR HOURS IN RLPORTING Pi klOD
=
NFT ELITTRIC AL POWF R t*F NE R ATFD Q) UNITCArACITY FACTOR
=
FORCED OL'TAGE HOL'RS l
(4) UNIT FORCED G JTAGl: RATE
=
HOURS GENERATOR ON LINE + 1 ORCH D OUTAGE HOURS 7912060 h 7 e
m,
l
~
50-270 DOCKET NO.
I Oconee Unit 2 ggg7 DATE 12/5/74
)
AVERAGE DAILY UNIT POWER LEVEL MOffTH November, 197t.
AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe net)
DAY (MWe-net)
I 833 748 17 1
566 432 33 2
717
'625
$g 3
748 793 4
g 837 825 21 5
840 826 22 g
'849 828 23 7
651 828 24 3
821 826 25 g
839
~ 578 26 10 845 832 27 11 845 839 28 12 842 839 29 13 840 838 30 gg 839 33 15 832 gg DAILY UNfr POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in MWe-net for each day in the reporting month.
Cornpute to the nearest whole megawatt.
'Ihese figures will se used to plot a graph for each reporting month. Note that by usinti maximum dependable capacity for the net electrical rating of the unit. there may be occasions when the dai sverage power level exceeds the 1007o line (or the restricted power level line). In such cases, the sverage daily unit power output sheet should be footnoted to explain the apparent anomaly.
a ww e**w,
DdCKET NO.
50-270 f
UNIT SHUTDOWNS Oc nee Unit 2 UNIT NAME DATE
' 'S 4
REPORT MONTH November,1974 TYPE METHOD 0F F-FORCED DURATION SHUTTING DOWN NO.
DATE S-SCHEDULED (HOURS)
REASON H)
THE REACTOR (2)
CORRECTIVE ACTIONS / COMMENTS -
No st utdowns during the annth of Ikr ' ember, 1974 (I) REASON (2) METilOD.
A--EQUIPMENT F ALLURE (EXPLAIN) 1-MANUAL B-MAINT.OR TEST.
2-MANUAL C-REI'UL LING SCRAM D-REGULATORY RESTRICTION 3-AUTOMATIC E-OPERATOR TRAINING AND t ACRAM LirENSE EXAMINATION F-ADMINISTRATIVE G-UPER ATIONAL ERROR (EXPLAIN)
H-OTHER V.XPLAIN)
SulIAMARY1
...... _ _