ML19317D703

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Nov 1974
ML19317D703
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 12/05/1974
From:
DUKE POWER CO.
To:
Shared Package
ML19317D702 List:
References
NUDOCS 7912060922
Download: ML19317D703 (3)


Text

.

Ocon m Unit I UNIT

@ DATE 12/5/74 50-269 DOCKET NO.

OPERATING STATUS 1.

RE PORTING PERIOD.

November 1, 1974 TilROUGH November 30. 1974 HOURS IN REPORTING PERIOD:

720 2.

CURRENTLY AUTHORIZED POWER LEVEL IMwth: 2568 MAX. DLPENDAllLE cal'ACITY DIWe NET, R71 3.

IDWEST POWER LEVEL TO WNCH SPLCIFICALL) RESTRICTED (IF ANY)(MWc. NET):

None 4.

REASONS FOR RESTRICTION (IF ANY):

THl3 CUMULATIVE REPORTING PI RIOD YR TO DATE TO DATE l

S.

HOURS REACTOR WAS CRITICAL.

0 5446.6 9800.5 6.

REACTOR RESERVE SHUTDOWN HOURS 0

0 0

l 1.

HOURS GENERATOR ON LINE...

0 5265.2 8254.3 8.

UNIT RESERVE SHUTDOWN HOURS...........

0 0

0 9.

GROSS THERMAL ENERGY GENERATED (MWHI 0

12226629 18237510 l

10.

GROSS ELECTRICAL ENERGY GENERATED (MWH) 0 4230112 6318700 11.

NET ELECTRICAL ENERGY GENERATED

-2118 3998488 5957566 l

(MWH) l 12.

REACTOR AVAILABILITY F ACTOR (1).........

0 68.0 81.18 0

65.7 68.4 l

13.

UNIT AVAILABILITY F ACTOR (2)

UNITCAPA' ITY F ACTOR (3) 0 52.3 56.7 14.

C 15.

UNIT FORCEC OUTAGE RATE (4)............

0 7.0 7.7 16.

SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE.DATE. AND DUR ATION OF EACH):

17.

IF SHUT DOWN AT END OF REPORT PERIOD. ESTIMATED DATE O! STARTUP: December 23, 1974 18.

UNITS IN TEST STATUS (PRIOR TO COMMERCI AL OPERATION) R E PORT THE FOLLO% ING:

DATE LAST D4TE FORECAST ACH'IEVED

~

INITIAL CRITICALITY INITIAL ELEGRICAL POWER GENERATION COMMERCIAL OPERATION

^

(1)

REACTOR AVAILABILilY FACTOR =

X 100 HOURS G1:NER ATOR ON LINF (2)

UNIT AVAll 4BILITY FACTOR

=

HOURS IN RLPORTING P1 RIOD NFT ELIT TRICAL PONTR i;t NE R ATF D

('3)

UNIT CAPACITY ACTOR

=

FORCED OUTAGE HOl*RS (4) UNIT FORCED OUTAGl: R ATE

=

HOURS GENERATOR ON LINE + f ORCED OUT AGE HOURS e

7912060p y

. g DOCKET NO. 50-269 Oconee Unit 1 g

12/5/74 DAE AVERAGE DAILY UNIT POWER LEVEL 300 NTH November, 1974 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe net)

DAY (MWe net) 0 O

g 1

o 0

3g 2

0 o

3 gg 0

o 4

u o

0 m

5 0

O g

3 0

0 23 7

O O

S M

0 O

g g

0

~

0 26 10 0

1 O

27 11 0

0 28 12 0

0 gg 13 0

0 30 14 0

0

.yg 15 18 DAILY UNTT POWER LEVEL FORM INSTRUCT 10NS' On this form, list the average dailv unit power level in MWe-net for each day in the reporting month.

Cosapute to the ne : rest whole megawatt.

'Ibese figures will ' e used to plot a graph for each reporting month. Note that by using maximum dependable capaci:j for the net electrical rating of the unit. there may be occasions when the daily average power lewi exceeds the 100'h line (or the restricted power level line). In such cases, the sverage daily unit p )wer output sheet should be footnoted to explain the apparent anomaly.

8

-n

--w.-

~~

D CKET NO.

50-269 Oconee Unit 1 UNIT SHUTDOWNS UNIT NAME DATE 12/5/74 REPORT MONTH November, 1974 i

I TYPE METHOD OF F FORCED DURATION SHUTTING DOWN l

NO.

DATE SSCHEDULED (HOURS)

REASON (1)

THE REACTOR (2)

CORRECTIVE ACTIONS / COMMENTS

~

16 741019 S

720.0 C

1 4

i i

~

2 l

1 (1) REASON (2) METHOD A-EQUIPMENT FA: LURE (EXPtAIN) 1-MANUAL B-MA!!G.OR TESI 2-MANUAL j

C-REFUELING SCRAM i

D-REGULATORY RESTRICTION 3-AUTOMATIC E-OPERATOR TRAINING AND SCRAM i

LICENSE EXAMINATION F-ADMINISTRATIVE G-OPERATIONAL ERROR (EXPLAIN)

H-OTilLR (EXPLAIN) 1 j

SUMMARY

i

.