Discusses Insp Rept 50-270/73-10 on 730807-09.Noncompliance Noted Re Improperly Located Sensors Required for Loose Parts Monitoring Functional Test in Coolant Piping Sys
ML19317D334
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 08/23/1973
From: Moseley N
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Thies A
DUKE POWER CO.
Shared Package
ML19317D327 List:
References
730829, NUDOCS 7911270557
Download: ML19317D334 (4)


See also: IR 05000270/1973010

Text

. _ . - -

.-

..

-

. . . - -

- .- -

-

sy

,

,#

%

UNITED STATES

g

Y$

ATOMI'C ENERGY COMMISSION

,

'

!.

DIRECTORATE OF REG'JLATCRY CPERATIONS

-

w

,s'

J

aEciou n - su TE sta

I

/

,

230 A E ACHT R E E ST R E ET, NomT wwEST

,

,

,,g,

g

A T L. A re T A. G E C RG I A 30333

In Reply Refer To:

AUG 29 N

RO:II:FJ

50-270/73-10

.

Duke Power Company

Attn.

Mr. A. C. Thies, Senior Vice President

Production and Transmission

Power Building

422 South Church Street

Charlotte, North Carolina

28201

Gentlemen:

This refers to the inspection conducted by Mr. F. Jape of this

office on August 7-9 and August 13-17, 1973, of activities

authorized by AEC Construction Permit No. CPPR-34 for the

Oconee 2 facility, and to the discussion of our findings held

by Mr. Jape with Mr. J. E. Smith at the conclusion of the inspection.

I

Areas examined during this inspection are as described in the

j

enclosed inspection report. Within these areas, the inspection

consisted of selective examinations of procedures and representative

records , interviews with personnel and observations by the inspector.

During the inspection, it was found that certain activities under your

license appear to be in violation of Appendix B to 10 CFR 50 of the

AEC Regulations, " Quality Assurance Criteria for Nuclear Power Plants."

The violation and reference to the pertinent requirements are identi-

fled in Section I of the sumary of the enclosed report.

This notice is sent to you pursuant to the provis' ions of Section 2.201

of the AEC's " Rules of Practice," Part 2, Title 10, code of Federal

.

Regulations.

Section 2.201 requires you to submit to this office,

within 20 days of your receipt of this notice, a written statement

or explanation in reply including:

(1) corrective steps which have

been taken by you, and the results achieved; (2) corrective steps

which will be taken to avoid further violations; and ,(3) the date

when full compliance will be achieved.

In accordance with Section 2.790 of the AEC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter

and the enclosed inspection report will be placed in the AEC's Public

_

Dccur. eat Roon.

If tb b rgort centains any in.fc=atica that you believe

o te :roprietary, it is necessary that you subnit a written applicatica

,

_

_ . _

- 181127o ST7

k.

.

- - -

-.

E

~

.

.

.

,

! -

.

Duke Power Company

-2-

g gg g

a

to this office requesting that such information be withheld from public

disclosure.

If no proprietary information is identified, a written

.

statement to that effect should be submitted. If an application is

submitted, it must fully identify the bases for which information is

claimed to be proprietary. The application should be prepared so that

information sought to be withheld is incorporated in a separate paper

and referenced in the application since the application will be placed

in the Public Document Room. Your application, or written statement,

should be submitted to us within 20 days.

If we are not contacted as

specified, the enclosed report and this letter may then be placed in the

Public Document Room.

Should you have any questions concerning this letter, we will be glad

to discuss them with you.

Very truly yours,

i

-

'

-

-

,,

,

~

fc '.'c

l

3,,rrym

.,

.

..

j

Norman C. Moseley

-s

Director

i

j

Enclosure:

RO Inspection Rpt. No.

50-27D/73-10

.

%

1

h

.

(

. ._.

.

.

-

--.

--

.

-

..

-

-

-

.

.

_.. .-

-

-

.

.

,.

1

, .

,

,

A

-

.

%,

Ltr to Duke Power Company

"

      • AUG 291973

,

I

,

l

l

j

DISTRIBUTION:

H. D. Thornburg, R0

RO:HQ (4)

Directorate of Licensing (h)

. M R Central Files

  1. PDR

!

  • NSIC

!

i

l

  • State
  • To be dispatched at a later date.

j

8

.

i

!

.

o

1

L-

1

.

i

1

i-

!-

.

.

I

.

!

1

i

4

.

A

'

'

.

=

k.

.

-

4

e

1

4

.

-

.

-

..

,

,,

. _

_

.

___ _.._ _

_

s

p'

w-,

v-

wv

v

3

4

--.e

4y--

r

-

m

.-.

,

.

.

.

.

,

l

.

-

.

..

!

.

p

Duke Power Company

gyg gg g

.-

Oconee 2

'

RO Inspection Report No. 50-270/73-10

.

ec w/ encl:

H. D. Thornburg, R0

RO:HQ (5)

_'" * * *4 R Central Files

,

Regulatory Standards (3)

Directorate of Licensing (13)

-

1

cc encl. only:

"PDR

' Local PDR

1

'NSIC

  1. DTIE, OR
  • State

'To be dispatched at a later date.

-

s.

<#

W

i

j

i

-

i

I

,

l

~

i

,

.

.

.

1

4

~'

t

l

.-

-

,-

_

-., . -

.__

_ _ _ _ _

_

w

y

-

-

,

w

- -

p