Forwards Pages Previously Omitted from Insp Rept 50-270/73-10 on 730807-09
ML19317D330
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 09/12/1973
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Thornburg H
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML19317D327 List:
References
NUDOCS 7911270555
Download: ML19317D330 (3)


See also: IR 05000270/1973010

Text

-

.

4

  1. ,%d

UNITED STATES

-

r

'i

' ~~

C

ATOMIC ENERGY COMMISSION

} ' , e'Q '

1

DIRECTORATE OF REGULATCRY OPERATICUS

+

.

aEGioN o - suit E sie

$

54

y

230 PE ACHf R E E ST R EET. NCRT HwEST

IP

4

,

,, , ,,,,, ,,, y ,,

4rgg C

ATLANTA. GEORGIA N 303

September 12, 1973

H. D. Thornburg, Chief, Field Support and Enforcement Branch

Directorate of Regulatory Operations, Headquarters

PAGE INSERTICH - DUKE POrrR COMPANY (CCONEE 2) , LI N SE NO. CPPR-34

REPORT NO. 50-270/73-10

The enclosed pages were inadvertently cmitted from the subject report

distributed to you on August 29, 1973.

Please insert these pages into your copy of the report.

l

Z4/.yy

C. E. Murph', Chief

Facilities Test and Startup

RO:II:CEM

Branch

Enclosures

Page Nos. 4 and I-2

cc w/encls:

RO:HQ (5)

3-

1 Central Files

Regulatory Standards (3)

Directorate of Licensing (13)

cc encls. only:

  • PDR

'

'NSIC

  • State
  • To be dispatched at a later date.

.

.

C

7911270

t

_

i

n

.

,

l

.

,

..

!

.

-4-

~.i

-

~

!

10 Rpt. No. 50-270/73-10

'

j

.-

C.

Personnel Changes

The following personnel changes were announced August 2,1973:

,

1.

M. D. McIntosh was promoted to Assistant Plant Superintendent

j

at DPC's McGuire Station.

l

2.

L. E. Schmid was promoted to Operating Engineer at the

Oconee Station.

i

3.

T. L. McConnell was promoted to Assistant Operating Engineer

'

at the Oconee Station.

4.

C. Tongue was promoted to Assistant Health Physics Supervisor -

(new position).

VII. Management Interview

A management interview was held on August 17, 1973, with the

following in attendance:

Duke Power Company (DPC)

J. E. Smith - Plant Superintendent

,

,

J. W. Cox - Assistant Plant Engineer

T. L. Cotton - Junior Engineer

The following items were discussed:

A.

Review of Administrative Procedures

The inspector stated that he had reviewed the administra-

tive procedures currently in effect with those described

in Regulatory Guide 1.33; there are three procedures lacking.

The licensee's representative stated that these would be pre-

'

pared by September 20, 1973.

(Details I, paragraph 3)

B.

Previously Reported Unresolved Items

..

The status of previously reported unresolved items, as described

in Section IV of the Summary of Findings, was discussed.

(Details

I, parsgraphs 4 and 5)

)

,

i

C.

High Energy System Interim Measures

The inspector stated that he had reviewed the status of.the

,'

interim measures for Oconee 2, presented in MDS Report OS-73.2,

'

i

" Analysis of Effects Resulting Frem Postulated Piping Breaks

[

Outside Containment," dated April 25, 1973, and Supplement 1,

'd

-

l

- . -

-

. _ .

--

-

._ _

.. _ .. - .

!

l

--

l

. _

-

..

-

.

-

.}

s

.

.

.' '.

-

_1.

RO kpt . No . 50-270/73-10

I-2

-

-

.

ff'S

il(/

2.

Witnessing Hot Functional Tests

I

l

The inspector witnessed performance of the following hot functional

tests (HFT):

,

1'

a.

IP 330/3A, " Control Rod Drive - Rod Droptime Test"

,

b.

TP 200/12A, "RC Pump Flow Test (HFT)"

c.

TP 200/36, " Loose Parts Monitoring Functional Test"

There were no questions or deficiencies noted on IP 330/3A and

TP 200/12A. The acceptance criteria on these tests were satisfied.

A deficiency was no" d by the inspector during the performance of

TP 200/36.

The test was run with four of the eleven sensors in a

location different from that specified in the test procedure.

The

table below shows the sensor location as found and as specified in

the test procedure:

Sensor Location

Sensor No.

Actual

As Specified by TP

~'

1

Incore Guide Tube 41

Incore Guide Tube 41

,

2

Incore Guide Tube 48

Incore Guide Tube 48

3

Incore Guide Tube 1

Incore Guide Tube 1

4

CRD 67

Incore Guide Tube 34

5

CRD 63

Incore Guide 'ube 52

6

SG 2A Hand Hole

SG 2A Hand Hole

7

SG 2A Tube Sheet Vent

SG 2A Tube Sheet Vent

8

CRD 69

SG 2A Pulse Line

9

SG 2B Band Hole

SG 2B Band Hole

10

SG 2B Tube Sheet Vent

SG 2B Tube Sheet Vent

11

CRD 65

SG 2B Pulse Line

The location of four sensors had been changed about a week prior to

performing the test, and after the initial verification of the sensor

'

location by the test coordinator, to monitor a condition on selected

control rod drives (CRD).

The inspector stated that relocation of sensors without the test

coordinator being aware of the change appeared to be in violation

,

of Criterion XI, " Test Control," of Appendix B to 10 CFR 50.

.