ML19317D301
| ML19317D301 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 10/14/1971 |
| From: | Thies A DUKE POWER CO. |
| To: | Jennifer Davis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML19317D299 | List: |
| References | |
| NUDOCS 7911270429 | |
| Download: ML19317D301 (1) | |
Text
..
j D:;nz Powra CoxPm Powza Sc :. :xe, 422 sor: r Caraca sint :. Curnt.or r,N. C. 2eaos October 14, 1971 A. c..mn e o.rox we u
- 4.. a
.u u..
..c. o.c......... c.
3!r. John G. Davis, Director U.S. Atomic Energy Commission Divn of Compliance Region I! - Suite 818 230 Peachtree Street,. Northwest Atlanta, Georgia 30303
Dear LIr. Davis:
In answer to your letter of Sep; ember 10, 1971, specifically enc'.osu"e Dcchet Nos. 50-270, 287, relating to certain items that appeared to be in noncompliance with 10 CFR Part 50, Appendix 3
" Quality Assurance Criteria for Nuclear Pcwer Plants" - your statemen: ' hat we proceeded with the installation of the feedwater headers on steam =menerator 23 in Uni: 2 at Oconee without a written approved J
procedure is correct. However, Criterion V states that activities affecting quality shall be prescribed by docume nied instructions, procedures, or drawings.
We did have approved E&W drav.ings which were used as installation instructicns before we began installation cf the feedwat.er headers. These drawings are B&W 129323E Revision 9, B&W 129302E Revision 12, and B&W 129322E Revision 9.
B&W site representatives were also no:ified before we began installing me header, since the warehousing of B&T equipmen: for the nuclear steam supply system is centrolled by B&W.
The feedwater header did have some gouges en the support lugs, bu::here were no are strikes anywhere en the steam genera:or upon inspection by our NDT personnel in an effort to tighten up cn our centrol of te activities affec:ing qualny, we h::.ve re-instruc:ed our craf: people as to de imper:ance of all areas reic. ting to de nuc'. ear s: carn supply system and 21: in all cases, a Duke c.ualitv, co n:rci represen:a:ive and a B&W site represen:anve must be no:ified before instalia:icn of B&W equipment. In this specific case, a procedure for Se repair of de feedwater neader support plates and the re-installa:ica of me feedwater header was wrinen b.v Duke and an. oroved b.y B&W, and the remaininz work was accomplished under o
2is precedure. It is our inten:icn :o supplemen: approved ins::11ation drawines a
with wrinen procedures en future instalia icn of equipment.
If you have any further questions, please advise.
Since rely, d.
H.V
. N.M'D C D. 7 :U. 5.
= ^
ACT!hr A. C. Thie s m v.
cc:
Alr. C. E. Watkins
.A. ;. ",
.?
A!r. E. D. Powell & 11. W. H. Cwen
,. <., a :.
t
...c h
A