DUKE P C'!/E R C O.'.i ? A N T CONSTRUOT10's OEPART:/.ENT OCONEE NUCLEA?. STATIO;J PROCF.D'Jn2 FOP, D?&'ING CC:.~IRUL

=

m

%..o

/

.f.

r c

t.2 PROVED SY OATE J S EV;0:0N PREPARED SY DATE CHE0KED DY OATC

%,(i.ff/ :;4 l y. t!.,~ 0

_ (,,, ; L, s' I",ji7.'.(

[1(

. ' ". \\~

~. ?. '.m l

t

^

/

u l

,']

,,i

~

G3M I l

l a

- _. m 5911 3'u " '

I

=

^ ~ ~ ~ ~ ~ ~ '

d

./

i i

a

[

1..

DUKE POWER COMPANY l

OCONEE NUCLEAR STATION 4

j PROCEDURE FOR DRAWISC CONTROL

'1.

SCOPE:

This document shall govern the procedure to be followed for control of drawings by the Construc~ tion Department during the construct-

.I i

ion of Oconce Nucicar Station.

2 PURPOSE:

I 2.1 To provide a system of control of design and canufacturers' drawings

'3 during construction.

2.2 To ptovide control of drawing revisions for construction use.

3.

PROCEDURE:

31 The Construction Department receives all approved drawings from the t

Engineering Department. Drauings roccived from any other source vill i

I i

(_

  • he considered as information only and will not be used for construction.

Duplicate copics of the Iceters of transmittal which are for the vice-r I

g president, Engineering are stamped duplicate and cent separately to the field.

This serves as.a check on drawings to assure they are not i

j lost in the processing from the Engineering Department to the ficid.

If drawings listed on this duplicate trans=ittal are not received in one i

l veck the appropriate section head is notified.

1

\\

3.2 The Field T.ngineering Office has responsibility for receiving, logging

~

i i

k and distributing drauings to the Superintendent, Layout Engineer and

)

Inspectors.

The Superintendent and/or his Cencral Foremen are responsibic for getting the new drawingn to the foremen and either destroying the t

i old drawings or ;arking them superceded.

In the case of inspectors, t

this in the duty of the supervising technicians.

(? )

i e

s

+

i w

v

  • ~-

s sv-----

v

['

i 3O

^

l 3.3 Prior to the distribution of any drawings, the Field Engineering Office a

vill review the drauings and transmittal letter to determine if the

(

i drawing is released for construction. Any ' drawing not released will be i

stamped "PRELI!!II'ARY." Drawings which are released for certain parts I

l only will be marked " PARTIALLY RELEASED."

3.4 Each week an appropriate Field Engineer or his designated representative will inspect cach foreman, inspector and layout party to assure that no i

l superceded drawings are being used. A record of this inspection will be I

made. It is the responsibility of the Field Engineer Office to naintain I

the records of thosc-inspections and notify the apprcpriate Field Engineer i

if it has not been made.

i j,

Q. '

4 i

t L

i I

i i

e n

i i

h 1

I