DUKE P C'!/E R C O.'.i ? A N T CONSTRUOT10's OEPART:/.ENT OCONEE NUCLEA?. STATIO;J PROCF.D'Jn2 FOP, D?&'ING CC:.~IRUL
=
m
%..o
/
.f.
r c
t.2 PROVED SY OATE J S EV;0:0N PREPARED SY DATE CHE0KED DY OATC
%,(i.ff/ :;4 l y. t!.,~ 0
_ (,,, ; L, s' I",ji7.'.(
[1(
. ' ". \\~
~. ?. '.m l
t
^
/
u l
,']
,,i
~
G3M I l
l a
- _. m 5911 3'u " '
I
=
^ ~ ~ ~ ~ ~ ~ '
d
./
i i
a
[
1..
DUKE POWER COMPANY l
OCONEE NUCLEAR STATION 4
j PROCEDURE FOR DRAWISC CONTROL
'1.
SCOPE:
This document shall govern the procedure to be followed for control of drawings by the Construc~ tion Department during the construct-
.I i
ion of Oconce Nucicar Station.
2 PURPOSE:
I 2.1 To provide a system of control of design and canufacturers' drawings
'3 during construction.
2.2 To ptovide control of drawing revisions for construction use.
3.
PROCEDURE:
31 The Construction Department receives all approved drawings from the t
Engineering Department. Drauings roccived from any other source vill i
I i
(_
- he considered as information only and will not be used for construction.
Duplicate copics of the Iceters of transmittal which are for the vice-r I
g president, Engineering are stamped duplicate and cent separately to the field.
This serves as.a check on drawings to assure they are not i
j lost in the processing from the Engineering Department to the ficid.
If drawings listed on this duplicate trans=ittal are not received in one i
l veck the appropriate section head is notified.
1
\\
3.2 The Field T.ngineering Office has responsibility for receiving, logging
~
i i
k and distributing drauings to the Superintendent, Layout Engineer and
)
Inspectors.
The Superintendent and/or his Cencral Foremen are responsibic for getting the new drawingn to the foremen and either destroying the t
i old drawings or ;arking them superceded.
In the case of inspectors, t
this in the duty of the supervising technicians.
(? )
i e
s
+
i w
v
- ~-
s sv-----
v
['
i 3O
^
l 3.3 Prior to the distribution of any drawings, the Field Engineering Office a
vill review the drauings and transmittal letter to determine if the
(
i drawing is released for construction. Any ' drawing not released will be i
stamped "PRELI!!II'ARY." Drawings which are released for certain parts I
l only will be marked " PARTIALLY RELEASED."
3.4 Each week an appropriate Field Engineer or his designated representative will inspect cach foreman, inspector and layout party to assure that no i
l superceded drawings are being used. A record of this inspection will be I
made. It is the responsibility of the Field Engineer Office to naintain I
the records of thosc-inspections and notify the apprcpriate Field Engineer i
if it has not been made.