Issue date: 05/13/1980
From: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Papay L
SOUTHERN CALIFORNIA EDISON CO.
References
NUDOCS 8005280071
Download: ML19316A930 (1)


Text

-

TKJ

'o UNITED STATES

[%

NUCLEAR REGULATORY COMMISSION g,

E REGION V o

g 1990 N. CALIFORNIA BOULEVARD k

SUITE 202, WALNUT CREEK PLAZA

  1. *,,, e "e WALNUT CREEK, CALIFORNIA 94596 4

May 13, 1980 Docket flos. 50-206, 50-361, 50-362 Southern California Edison Company P. O. Box 800 2244 Walnut Grove Avenue l

Rosemead, California 91770 Attention: Dr. L. T. Papay, Vice President Advanced Engineering Gentlemen:

The enclosed Circular No. 80-11 is forwarded to you for information. No written response is required.

Should you have any questions related to your understanding of the recommendations on this matter, please contact this office.

Sincerely, l

fl s yd.-

R. H. Engelken Director

Enclosures:

1.

IE Circular No. 80-11 2.

List of Recently Issued IE Circulars cc w/ enclosures:

J. M. Curran, SCE R. Dietch, SCE i

8 0 05 a s u o7f f

SSIflS No.: 6830 Accession No.:

UNITED STATES 8002280662 flUCLEAR REGULATORY COMMISSION c,

0FFICE OF INSPECTION AND ENFORCEMEtlT

)D hg WASHINGTON, D.C. 20555 o o J

_,U J May 13, 1980 IE Circular No. 80-11 EMERGENCY DIESEL GEllERATOR LUBE OIL COOLER FAILURES Description of Circumstances:

Within a two week period (August 27 to September 11,1979), the tube sheets failed in the lube oil coolers of both emergency diesel generators for Arkansas Nuclear One (AN0) Unit flo.1. The introduction of water into the diesel lube oil system resulted in trips of both diesels during surveillance testing. The diesels were not considered capable of sustained operation. These events were previously identified to all operating license and construction permit holders by Information Notice 79-23, Emergency Diesel Generator Lube 011 Cooler on tured by the Electro-Motive Division (EMD) generators involved were manufac-September 25, 1979.

The emergency diesel of the General Motors Corporation and the failures occurred on engines 71-Al-1117 and 71-Al-1130. The failed lube oil coolers were manufactured by the Young Radiator Company.

An analysis of the failed coolers performed by EMD resulted in the conclusion that the failures were caused by severe corrosion of the solder which sealed l

the tubes to the-tube sheets. The corrosion inhibitor in use at ANO was Calgon CS, a borate-nitrite type inhibitor. The manufacturer of this type of inhibitor has recommended the use of hard solder in CS treated systems.

EMD does not recommend the use of Calgon CS since the puddle solder used in EMD radiators and oil coolers is considered to be soft solder of a lead-tin composition.

Recommcnded Action for Licensees' Consideration:

Based on the above, it is recommended that licensees:

1.

Verify that the corrosion inhibitor used in cooling water systems of the emergency diesel generators is compatible with all materials wetted by the cooling water and the engine manufacturer's specific recommendations.

Also, by means of the engine maintenance history, verify that the system corrosion inhibitor has been properly monitored and maintained at the recommended concentration.

2.

If Item 1 cannot be successfully performed, the affected components should be inspected in accordance with the manufacturer's recommendations.

No written response to this Circular is required.

If you desire additional information regarding this matter, contact the Director of the appropriate flRC Pegional Office.

e IE Circular No. 80-11 Enclosure May 13, 1980 RECENTLY ISSUED IE CIRCULARS Circular Subject Date of Issued to No.

Issue 80-10 Failure to Maintain 4/29/80 All holders of Reactor Environmental Qualification OLs and cps of Equipment 80-09 Problems With Plant Internal 4/28/80 All holders of a power Communications Systems reactor OL or CP 80-08 BWR Technical Specification 4/18/80 All General Electric Inconsistency - RPS Response BWR's holding a power Time reactor OL 80-07 Problems with HPCI Turbine 4/3/80 All holders of a power Oil System reactor OL or CP 80-06 Control and Accountability 4/14/80 Medical licensees in Systems for Implant Therapy Categories G and G1 Sources 80-05 Emergency Diesel-Generator 4/1/80 All holders of a power Lubricating 011 Addition and reactor OL or CP Onsite Supply 80-04 Securing of Threaded Locking 3/14/80 All holders of a power Devices on Safety-Related reactor OL or CP Equipment 80-03 Protection from Toxic Gas 3/6/80 All holders of a Hazards power reactor OL 80-02 Nuclear Power Plant Staff 2/1/80 All holders of Reactor Work Hours Ols, including research and test reactors, and cps 80-01 Service Advice for GE 1/17/80 All licensees of Induction Disc Relays nuclear power reactor operating facilities and holders of nuclear power reactor cps