Forwards IE Insp Repts 50-269/77-02,50-270/77-02 & 50-287/77-02 on 770201-04,16-18 & 22.Noncompliance Noted
ML19316A278
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 03/18/1977
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML19316A270 List:
References
NUDOCS 7912050849
Download: ML19316A278 (2)


See also: IR 05000269/1977002

Text

_ _ _ _ _

t

gf t " "!%g%

-

h

UNITED STATES;

NUCLEAR REGULATORY COMMISSION

r',

?

' . g,

o

REGION 11

'

2

$

230 PEACHTREE STREET, N.W. SUlrE 818

f

o

ATLANTA, GEORGI A 30303

h .'

MAR 181977

In Repfy.. Refer To:

IE:II:CEA

50-269/77-2

50-270/77-2

50-287/77-2

Duke Power Company

Attn:

Mr. William O. Parker, Jr.

Vice President, Steam Production

P. O. Box 2178

422 South Church Street

Charlotte, North Carolina

28242

Gentlemen:

This refers to the inspection conducted by Messrs. W. W. Peery,

C. E. Alderson and G. T. Gibson of this office on February 1-4,

February 16-18, and February 22, 1977, respectively of activities

authorized by NRC Operating License Nos. DPR-38, DPR-47 and DPR-55

for the Oconee facilities, and to the discussion of our findings

held with Mr. J. E. Smith at the conclusion of the inspections on

February 4, 18 and 22, 1977.

Areas examined during the inspection and our findings are discussed in

the enclosed inspection report. Within these areas, the inspection

consisted of selective examination of procedures and representative

records, interviews with personnel, and observations by the inspector.

We have examined actions you have taken with regard to previously

reported unresolved items. These are identified in Section IV of the

summary of the enclosed report.

Two new unresolved items resulted from this inspection and are identi-

fled in Section III of the sumary of the enclosed report.

These items

will be examined during subsequent inspections.

During the inspection, it was found that certain activities under your

license appear to be in noncompliance with NRC requirements.

This ite=

and references to pertinent requirements are listed in Section I of the

summary of the enclosed report.

\\

mzoso899

.

.

i

, .

Duks Powar Comptny

-2-

!

( !

This notice is sent to you pursuant to the provisions of Section 2.201

.

of the NRC's " Rules of Practice," Part 2 Title 10, Code of Federal

Regulations.

Section 2.201 requires you to submit to this office,

within 20 days of your receipt of this notice, a written statement

or explanation in reply including:

(1) corrective steps which have

been takea by you, and the results achieved; (2) corrective steps

which will be taken to avoid further noncompliance; and (3) the date

when full compliance will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and

the enclosed inspection report will be placed in the NRC's Public

Document Room. If this report contains any information that you believe

to be proprietary, it is necessary that you submit a written application

to this office requesting that such information be withheld from public

disclosure.

If no proprietary infcrmation is identified, a written

statement to that effect should be submitted.

If an application is

submitted, it must fully identify the bases for which information is

claimed to be proprietary. The application should be prepared so that

1

information sought to be withheld is incorporated in a separate paper

and referenced in the application since the application will be placed

in the Public Document Room. Your application, or written statement,

should be submitted to us within 20 days.

If we are not contacted as

specified, the enclosed report and this letter may then be placed in the

s

Public Document Room.

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Very truly yours,

s cWf

.

F. J. Long, Chief

Reactor Operations and Nuclear

Support Branch

i

Enclosure:

IE Inspection Report Nos.

50-269/77-2, 50-270/77-2

and 50-287/77-2

,