Forwards IE Insp Rept 50-269/78-13,50-270/78-12 & 50-287/78-12 on 780613-16 & Notice of Violation
ML19316A140
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 07/07/1978
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML19316A138 List:
References
NUDOCS 7911280676
Download: ML19316A140 (2)


See also: IR 05000269/1978013

Text

GMOVLeEM3uto

j

g nah 'o

NUCLEAR REGULATORY COMMISSION ]

8

n,.

j

>

u

!

  • g

REGloN li

.

o

  • O{.'e

$

230 PL ACHTREE s1REET. N.W. sulTE 1217

,

/'

(

8

ATLANTA, GEORGIA 30303

o y

8

gv

,e

'

  • s,<<

-

JUL 7

E78

.

In Reply Refer To:

RII:FJ-

N

,.50d269/.78-13

s

- 50-270/78-12

50-287/78-12

Duke Power Company

Attn:

Mr. William O. Parker, Jr.

Vice President, Steam Production

P. O. 2c-2 2178

Chat Ltte, North Carolina

28242

Gentlemen:

This refers to the inspection conducted by Mr. F. Jape of this office on

June u-16, 1978, of activities authorized by NRC Operating License Nos.

DPR-3F. DPR-47 and DPR-55 for the Oconee 1, 2 and 3 facilities, and to

the diccussion of our findings held with Mr. R. M. Koehler at the

conclusica of the inspection.

Aren ..::ined during the inspection and our findings are discussed in

the er.dr. sed inspection report. Within these areas, the inspection

consisted of selective examinations of procedures and representative

recoris. interviews with personnel, and observations by the inspectors.

Two ne- unresolved items resulted from this inspection and are discussed

in tue enclosed report. These items will be examined during subsequent

inspections.

During tae inspection, it was found that certain activities under your

license appear to be in noncompliance with NRC requirements. This item

and references to pertinent requirements are listed in the Notice of

Violation enclosed herewith as Appendix A.

This notice is sent to you

pursuant to the provisions of Section 2.201 of the NRC's " Rules of

Practice," Part 2, Title 10, Code of Federal Regulations.

Section 2.201

requires you to submit to this office, within 20 days of your receipt of

this notice, a written statement or explanation in reply including:

(1)

corrective steps which have been taken by you, and the results achieved;

(2) corrective steps which will be taken to avoid further noncompliance;

and (3) the date when full co=pliance will be achieved.

i

O

s

.

~

- -.

- . . .

} {

- -__ _ -

-

\\j

. . - - .

- - - - . . - - --

-

-

. .

. , - . .

.

!

)

,

.m

t

,

-

Duke Power Company

-2-

JUL 7

3 73

!

1

In accordance with Section 2.790 of the NRC's " Rules of Practice",

i

Part 2, Title 10, Code of Federal Regulations, a copy of this letter

4

and the enclosed inspection report will be placed in the NRC's Public

Document Room.

If this report contains any information that you (or

your contractor) believe to be proprietary, it is necessary that you

make a written application within 20 days to this office to withhold

such information from public disclosure.

Any such application must

inclu'e a full statement of the reasons on the basis of which it is

clo;a.ed that the information is proprietary, and should be prepared so

'

tha. . oprietary information identified in the application is contained

in . r?parate part of the document.

If we do not hear from you in this

regard within the specified period, the report will be placed in the

Pu'1'c Document Room.

you have any questions concerning this letter, we will be glad to

Shn" d

d:s.'uer them with you.

'

Sincerely,

_

%

.

--

\\

F.

ong, Chi

.

Reactor Operationr, and Nuclear

Support Branch

Enclesures:

1.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-269/78-13,

l

50-270/78-12 and 50-287/78-12

l

cc w/ encl:

Mr. J. E. Smith, Station Manager

Oconee Nuclear Plant

P. O. Box 1175

Seneca, South Carolina 29678

l

1

,i

f

_.

. _ _ _ . .

.

_ _ _ _ . _ _ _ . , . . _ . _ .

. _ _ _

-

4