Responds to NRC Re Violation Noted in IE Insp Repts 50-269/78-13,50-270/78-12 & 50-287/78-12.Corrective Actions:Fuel Assembly Storage Location Documented Properly & Fuel Handling Supervisor Signature Added
ML19316A139
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 07/31/1978
From: Parker W
DUKE POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19316A138 List:
References
NUDOCS 7911280674
Download: ML19316A139 (2)


Text

O

)

JUKE POWER COhiPANY Powzn Best.nswo 422 SocTn Cucacu Staetr. Cnant.orTE, N. C. as242 9

..wa= o aa ca.sa.

July 31, 1978 V.cr Pots te.v 7t. g e= c e. t a n t a ? ~. 4

$ ' t a a. A m 0 0 w C t io =.

3?3 4062 Mr. James P. O'Reilly, Director U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 Re:

Rll:FJ 50-269/78-13 50-270/78-12 50-287/78-12

~ tr Mr. O'Reilly:

With regard to Mr. F. J. Long's letter dated July 7, 1978, which transmitted OIE Inspection Report 50-269/78-13, 50-270/78-12, 50-287/78-12, Duke Power Company does not consider this infor=ation to be proprietary.

Please find attached a response to the item of noncompliance identified in the subject inspection report.

Ver. truly yours,

/

'N

/

{

w_ d).

v x.

'a liam O. Parker, J.

RLG:scs Attachment 7911280h J

Duke Power Company Response to OIE Inspection Report 50-269/78-13, 50-270/78-12, 50-287/78-12 ITEM:

Technical Specification 6.4.lb. requires refueling operations to be conducted and maintained in accordance with approved procedures.

Section 4.2.6 of the Administrative Policy Manual requires activities be conducted in accordance with the provisions of the applicable procedure.

Contrary to the above, the receipt inspection and storage of two new fuel assemblies on March 17, 1978, was not documented as required by the new fuel assembly inspection and storage procedure No. OP/0/A/1503/04, in that enclosure 9.3 of the procedure was not documented as having been performed for assembly No. NJ011S and for assembly h'. NJ011T. The assembly storage location was not recorded and the Fuel Handling Supervisor's signature was missing.

This is a deficiency.

3PONSE:

It was verified with the activity supervisor in charge of receiving new fuel that the fuel assemblies in question (NJ0115 and NJ011T) had been inspected and stored per OP/0/A/1503/04.

The applicable enclosures were then completed (assembly storage location and Fuel Handling Supervisor's signature).

This deficiency occurred due to an oversight by the Fuel Handling Supervisor.