Text
.
Q
g
d
j
.
,
,
UNITED STATES
EA KICug
t
,(p
NUCLEAR REGULATORY COMMISSION
0,
,
REGION ll
{
{
, v. ( ; g
230 PE ACHTREE STREET. N.W. SUITE 1217
/, [a
'
- -
ATLANTA, GEORGI A 30303
o,g..v...f
In Reply Refer To:
RII-
JUL 2 61978
50-287/78-13
-
Duke Power Company
Atta:
Mr. William O. Parker, Jr.
Vice President, Steam Production
P. O. Box 2178
422 South Church Street
Charlotte, North Carolina
28242
Gentlemen:
This refers to the inspection conducted by Mr. W. W. Peery of this
office on June 12-15, 1978, of activities authorized by NRC License Nos.
DPR-38, DPR-47, DPR-55 for the Oconee Nuclear Station facilities, and to
the discussion of our findings held with Mr. R. M. Koehler at the
conclusion of the inspection.
Areas examined during this inspection included the radiological environ-
mental monitoring program and implementation thereof.
Within these
areas, the inspection consisted of selective examinations of procedures
{
and representative records, interviews with personnel, and observations
by the inspector.
We have examined actions you have taken with regard to previously
identified enforcement matters.
These are discussed in the enclosed
inspection report.
During the inspection it was found that certain activities under your
license appear to be in noncompliance with NRC requirements.
This item
and references to pertinent requirements are listed in the Notice of
Violation enclosed herewith as Appendix A.
Corrective actions to
,
prevent recurrence were completed prior to the conclusion of this
J
inspection; therefore, a reply is not requested.
In accordance with Section 2.790 of the NRC's " Rules of Practice,"
.
Part 2, Title 10, Code of Federal Regulations, a copy of this letter and.!
the enclosed inspection report will be placed in the NRC's Public Document
Room.
If this report contains any information that you (or your contractor)
/
believe to be proprietary, it is necessary that you make a written
A (,f s
,
application within 20 days to this office to withhold such information
l /-
,
from public disclosure.
Any such application must include a full statement'
_ _.
__
7911280b%
.
a
.
JUL 2 61978
-
,
')
-)
.
.
,
Duk2 Powar Comp:ny
-2-
.
.
)
.
i
of the reasons on the basis of which it is claimed that the information
is proprietary, and should be prepared so that proprietary information
identified in the application is contained in a separate part of the
document.
If we do not hear from you in this regard within the specified
period, the report will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
A
'
J. T. Sutherland, Chief
Fuel Facility and Materials
Safety Branch
Enclosures:
Appendix A, Notice of Violation
.
2.
Inspection Report Nos. 50-269/78-14,
50-270/78-13 and 50-287/78-13
cc w/ encl:
Mr. J. E. Smith, Station Manager
Oconee Nuclear Plant
P. O. Box 1175
Seneca, South Carolina 29678
'
.. .
'
,
!
-1
-
-- ---
-
.-
- _ _ . . _
_
,
_,_
---