O DUKE POWER COMPANY OCONEE NUCLEAR STATION OPERATIONAL QUALITY ASSURANCE PROGRAM Supplementary Information At the present time, a corporate structured quality assurance program is being instituted within Duke Power Company.

The operational quality as-surance program for Oconee Nuclear Station is being revised to reflect this corporate quality assurance organization and full implementation should occur no later than January 1, 1974.

The description of the Oconee Nuclear Station operational quality assurance program, as transmitted by Mr. A. C. Thies' letter of April 27, 1973, to Mr. R. C. DeYeung, is accurate for the program 1

which presently exists.

However, when the Oconec program is fully revised to reflect the corporate quality assurance organization, Item I of the above-mentioned description should be revised to read as follows:

I.

ORGANIZATION I

The organizational structure for Oconee Nuclear Station operational quality assurance is shown diagrammatically in Figures 1, 2, and 3.

The Executive Vice President and General Manager has overall responsi-bility for planning, design, construction and operation of Duke Power Company's generation and transmission facilities.

Reporting to the Executive Vice President and General Manager are the Senior Vice Presi-dent, Production and Trancmission, who is responsible for directing the operation of the company's generation and transmission facilities, and the Senior Vice President, Engineering and Construction, who is re-sponsible for directing the design and construction of the company's generation and transmission facilities.

The Executive Vice President and General Manager has established a Corporate Quality Assurance Manager, reporting to the Senior Vice President, Engineering and Con-struction, to have functional responsibility for the company's quality assurance program.

The executive Vice President and General Manager have also appointed a Nuclear Safety Review Committee to serve as an independent nuclear safety review and audit backup to the normal operating organization.

I Operational quality assurance for Oconee Nuclear Station is the direct line responsibility of the Steam Production Department, directed bylthe Assistant Vice President, Steam Production. Within the Steam Production Department, the operational quality assurance program is directed and administered by the Manager, Quality Assurance, Steam Production.

The Manager, Quality Assurance, Steam Production, reports functionally to the Corporate Quality Assurance Manager and administratively to the Assistant Vice President, Steam Production through the Manager, Operations and Maintenance and the Manager, Steam Production.

The Manager, Quality y

Assurance, Steam Production, is assisted by the Steam Production Quality Assurance Staff.

W l

2911 slo Q V

E33k5, S-1

The Station Superinten, dent has the responsibility for directing station operation and administration, and reports to the Assistant Vice Presi-dent, Steam Production through the Ms,ager, Steam Production.

The Station Superintendent is assisted by the general station staff and the Station Review Connittee.

The Corporate Qualirr Assurance Managet has the final responsibility for assuring that the station complies with all applicable requirements of the operational quality assurance program. He is assisted by the Manager, Quality Assurance, Steam Production, whc.in turn is assisted by the Oconce Nucler-Station Quality Assurance Engineer.

The Oconee Nuclear Station Quaits Assurance Engineer has a staff to assist him, and reports functionally to the Manager, Quality Assurance, Steam Production, and administrative 1y to the Station Superintendent.

The responsibilities of the various individuals and organizations con-cerned with Oconce Nuclear Station operational quality assurance are clearly delineated in written charters, in the station's Technical Specifications and in the Steam Production Department " Administrative Policy Manual for Operational Quality Assurance of Nuc1 car Stations."

Each of these individuals and organizations has the authority necessary to adequately discharge their responsibilities.

Those indivieluals and organizations which are responsible for checking, auditing, 1aspecting or otherwise verifying that an activity has been correctly performed are independent of the individual or organization directly responsible for performing the specific activity.

1 G

S-2

OPERATIONAL QUALITY ASSURANCE MANAGEMENT ORGANIZATION Executive Vice President

~~

and General Manager Senior Vice President Nuclear Safety Production and Transmission Review Committee i'

Assistant Vice President Steam Production Station Superintendent Station Review Committee i

l Figure 1 s.

d OPERATIONAL QUALITY ASSURANCE STEAM PRODUCTION DEPARn!ENT ORGANIZATION Assistant Vice President Corporate Steam Production Quality Assurance Manager Manager Steam Production Manager Manager Manager Mana8er n8Ser Manager Technical &

Chemical &

Office m

Fuel Computers 6 Employee Operation &

N Utilization Proj ects Development Nuclear Environmental Manager Maintenance c

Services Services a

i N

e Manager Quality issurance Quality Assurance Staff Fuel Computers E Employee Technical &

Chemical &

Operation &

Utilization Projects Development Nuclear Environmental Clerical Maintenance Staff Staff -

- Staff Services Services Staff Staff Staff Staff Station Superintendents l

5

B OPERATIONAL QUALITY ASSURANCE NUCLEAR STATION ORGANIZATION i

Station Manager Superintendent.

QA Steam Production Clerical Assistant Station Station Review Staff Superir.;endent n

Cortmittee

[

Operating Technical Support Maintenance Engineer Staff QA e

Enginere Engineer (or Supervisor)

Engineer Engineer a

to Operating Technical Support Maintenance Staff QA Personnel

-Personnel Personnel Personnel Personnel 9

l 1

i l

Dmus Pownn GourAwy Powen Duni. nmo 4ea Sourn Cuuncu Srazer, CuAntoT7z,N.C.anson i

D.D.PAnnr.n t.eev : *,.cs Petsionat F.o. Box esto a castw Ma=aatn J.

I December 29,1972 i

+

i I

Mr W S Lee, Sr Vice President, Engineering & Construction t

Mr R L Dick, Vice President, Construction Mr W H Owen, Vice President, Design Engineering Mr E D Powell, Assistant Vice President, Steam Production Mr T J Garrett, Director of Purchases & President, Mill-Power Supply Company Re: Nuclear Generating Station Quality Assurance Program The attached Organizat ion For Quali ty Assurance will become effective January 1,1973, for all safety related activitics associated with the design, construction and operation of the Company's nuclear generating stations.

Responsibility for the Company's quality Assurance Program is assigned to the Senior Vice President, Engineering and Construction.

The Corporate Quali ty Assurance Manager is assigned responsibility to verify and ensure implementation of the Quality Assurance Program.

For administrative purposes, other quality assurance managers and engineers may report to responsibic members of management in their respective departments, but shall bc responsibic to the Corporate Quality Assurance flanager for verifying and assuring impicmentation of the Quality Assurance Program in their areas of responsibility.

As responsible officers and department heads of the Company, you will see to it that an effective quality assurance program for nucicar generating statyns is impicmented and continually updated in accordance with your approved written organizational procedurcs.

The Design Engineering Department is assigned responsibility for impicmentation of the quality assurance program in the areas of des 8;n, procurement and manufacturing; the Construction Department in the areas of crection and fiel.d. purchased materials; the Steam Production Department in the areas of pre-operationci ' testing, operation and maintenance; and the Purchasing Department in the area of purchasing administration.

In cach of the above areas, the responsible department is to preparc a written quality Assurance Plan, furnishing the other departments and the Corporate Quality Assurance Manager a copy and any subscquent revisions thereto.

Execution of each plan is to be in accordance with appropriate written procedures.

As a guide to the preparation of plans and procedures, and to all those involved in quality assurance functions, the requirements of Appendix B,10CFR50, " Quality Assurance Cri teria f'or Nuclear Power. Plants," and of ANSI N45.2-1971

" quality Assurcnce Program Requirements for Nuclear Power Plants," should be applied.

B B Parker A C Thies, $r Vice President, Production and Transmission cc:

OUKE POWER COMPANY ORGANIZATlDN CHART FOR QUAll.TY ASSURANCE.

EXECUTIVE VICE-PRESIDENT

" GENERAL i

MANAGER B. B. Parker i

I i

I DIRECTOR OF PURCHASES SENIOR l

SENIOR (PRESIDEili MILL POWER VICE-PRESIDENT (

VICE-PRESIDENT SUPPLT ENGINEERING l

PR000Cil0N &

COMP ANT)

& CONSTRUCTION TRANSHISSION T. J. Garrett W. S. Lee.

l A. C, ihles l

f l

MANAGER OF l

ASSISTAfiT VICE-PRESIDENT PURCHASES VICE-PRESIDENT CORPORATE VICE-PRESIDENT STEAN PLANT CONSTRUCT 10f4 0*A*

OESIGN PRODUCTION CONSTRUCTl0H MAN AG ER EtiG itlEE R I N G E. D. Panell f

R. F. Smith H.

L. Olck W. S. Lee f

W. H. Owen j

s MANAGEP STEAM PRDOUCTION PROJECT MANAGERS CHIEF EliQlhEERS W. O. Parker, Jr.[

l HAHACER OPERATION f.

MAINTENANCE H. B. Tucker s

b s

l l

\\

fb

_h p

3 0 A' Q.A.

0.A.

4 0.A.

l H AN ACER MANAGER MAllAGER el AtiA GER PURCHASES CollSTRUCil0N DESIGH STEAM gg p

k__J.R. Wells l

l E. C. Fiss p

R. F. Smith

J. O. Barbour Jr.

Q.A. AUTHORITY ADMINISTRATIVE AUTHORITY O

l DUlm Powzn Goxrxsv t.

Powna Burtorso. Box 2170. Guintorru.N. G. asson t

,u.*

s.ts.

....m........

................ ~...

l 4

I e

l 3

May 17,1973 i

t Ii Mr J 0 Barbour, Manager, quali ty Assurance, S team Producti on Department '

Mr E C Fiss, Manager, quality Assurance, Design Engineering Department Mr R F Smi th, Manager, quality Assurance, Mill-Power Supply Company 1

Mr J R Vells, Manager, quality Assurance, Construction Department By his letter of December 29, 1972, Mr B B Parker assigned me as Corporate quality Assurance Manager.

His letter with its accompanying organizational char,t directed that each of you, as quality assurance managers of your respective departments, shall report f unctionally to me in quali ty assurance matters.

Implementation and di rection of the Company's quality assurance program are the

-responsibility "of the line organization in each department.

Your responsibility i s to assure that the program is, in fact, being followed.

In fulfilling this assignment, you have the authority as well as the responsibility to identify qual i ty problems, to initiate, recommend, provide, or review solutions and verify implementation of solutions.

Where the required quality standards are not being you have the authority and responsibility to stop work in your department

met, 6

i f i ts continuation could result in a compromise of nuclear safety.

You are further authorized to delegate appropriate authority and responsibility to others performing quality assurance functions-in your respective departments.

J' YLb.O

  • G W S Lee Corporate quality Assurance Manager WSL/s cc Mr R L Dick Mr T J Garrett Mr W H Owen Mr E D Powell Mr A C Thics

I

.I l

JOB CLASSIFICATION e

CORPORATE QUALITY ASSURANCE MANAGER I

I A.

Qualifications I

Must meet the Company's general requirements and in addition:

l 8

Have a Bachelor's degree in engineering or the equivalent inl 1.

practical experience.

2.

Must have developed a high level of competence in the ~?uid of quality assurance or related technical areas associated with nuclear power plants.

3.

Must be innovative and have the ability to plan an effective overall quality assurance program for the Company.

4.

Must have the ability to effectively coordinate the implementation, monitoring and modification of quality, assurance programs among the several departments of the Company.

5 Must exhibit qualities of leadership and communications ability, both oral and written.

i 8.

Responsibilities Under the general direction o? tne Senior Vice President, Engineering and i

Construction,. the Corporate quality Assurance Manager is responsible for the overall direction of the Company's quality absurance program including technical supervision of quality assurance mhnagers in the several depart-ments. More specific responsibilities include:

1.

Development and maintenance of overall quality assurance policy complying with the requirements of the Company and regulatory authorities.

e

i l'

2.

Coordinating the implementation among the several departments of quality Assurance programs, with particular attention to interf aces.

3.

Planning the training and development of quality assurance personnel in the company.

i 4.

Monitoring and surveillance of the effectiveness of quality assurance i

efforts in the company, including periodic reporting to the Senior Vice President.

i 5.

Representing Company management at high level quality assurance meetings with regulatory agencies and industry groups.

6.

Maintaining a current file of quality assurance plans, programs and procedures in effect.

7 Reviewing the results of departmental audits through the reaudit stage 4

and prepa' ring a summary report for the Senior Vice President.

8.

Directing such special audits as may be required from time to time.

i l

i O

I

o g

2.

Various sections of the Steam Production Department " Administrative Policy Manual for Operational Quality Assurance of Nuclear Stations" respond to the eighteen criteria of 10CFR50 Appendix B.

A tabulation of the more typical sections of this manual, together with the scope of each, is presented in Table 2-1.

l

Adminstrative Policy Manual for Operational Quality Assurance of Nuclear Stations

..esponse to 10 CFR 50 Appendix B 10 CFR 50 Appendix B Section Criteria Reference Scope 1.4 Organization for Operational I, II, XVI, XVIII Describes the Duke Power Company organiza-Quality Assurance tion applicable to Opera?.ional quality assurance.

1.5 Administration of the Manual I, II, V, VI Addresses the authority, implementation and revision of the " Administrative Policy Manual for Operational Quality Assurance of Nuclear Stations."

g 2.1 Document Control II, 7, VI, XVII Estab11shes requirements for the handling cr and distribution of incoming docu=ents, out-5 going documents, Duke Power Company drawings, y

vendor documents, station directives, proce-dures, ccpies of the FSAR andcopies of the w

" Administrative Policy Manual for Operational Quality Assurance of Nuclear Stations."

2.2 Station Records Management II, V, VII, XVII Addresses the contents of the station's files and the record retention and e-nagement requirements for these files.

2.3 Control of Measuring and II, V, XII, XIII, Describes the requirements for the control, Test Equipment XVII identification, calibration, storage, shipment and issue of measuring and test equipment.

2.4 Control of Materials, Parts II, IV, V, VII, VIII, Addresses the procurement, receipt, inspection, and Components XIII, XV, XVII storage and issue of materials, parts and components, and the handling of nonconforcing items.

2.5 Qualifications and Training II, V, XVII Establishes requirements for the qualifications of Personnel of certain station personnel, the training of

10 CFR 50 Appendix B Section Criteria Reference Scope 2.5 -(Cont'd) personnel to be licensed by the AEC and the training of personnel not requiring AEC licenses; and addresses retraining and replacement training requirements.

2.6 Review and Audit I, II, V, XVI, XVII, Describes the responsibilities for review XVIII and audit of the Nuclear Safety Review Committee, the Steam Production Quality Assurance Staff, the Station Review Cocmi-ttee and the Station Quality Assurance Staff and the conduct of audits.

3.1 Operations II, V, XVII Addresses the responsibilities and conduct g

of the operating organization, the content g.

of OperatingProcedures, the content of Emer-g' gency Procedures, the content of the alarm response manual and the content of necessary g

4 operating records, lh 3.2 Station Testing II, V, XI, XVI, Establishes the responsibilities of test e

XVII personnel, the content of the test procedures, the scheduling of testing and the performance s-of testing for both preoperational and periodic testing.

--~

3.3 Maintenance

~

II, V, X, XIV, Addresses the maintenance organization and XVI, XVII personnel qualifications, the perforcance of maintenance, the scheduling of preventive maintenance, the investigation of equipment failures, the evaluation of replacement parts, the scheduling of maintenance and the content of maintenance procedures for electrical, mechanical and instrument maintenance.

3.4 Station Modifications II, III, V, VIII, Establishes requirements for the initiation IX, XVII of a modification request, the review and approval of modification requests, the imple-

10 CFR 50 Appendix B

~

~

Section Criteria Reference Scope 3.4 (Cont'd) mentation of modifications and the test or inspection of completed modifications.

3.5 Inspections I, II, V, X, XIV, Describ'es the responsibility of personnel XVII for inspections, the qualifications of inspection personnel, the requirements for inservice inspections, the requirements for cleanliness inspections, the criteria for cleanliness inspections and the requirecents for procedure compliance inspections.

3.6 Control of Special II, V, IX, XVII Addresses the responsibilities of personnel Processes for the control of special processes, the

$g '

qualifications of personnel performing Ef special processes and the requirements for y

procedures for special processes.

E 17 8"

P O

3.

Vendor evaluation is performed for the Steam Production Department in accordance with policies contained in the Design Engineering Department Quality Assurance Manual, consistent with the degree of quality required.

Approved vendors are placed on a current qualified vendor list. The Purchasing Department places orders with these vendors in accordance with policies contained in their Quality Assurance Manual.

To assure that material and equipment fabrication is being performed in accordance with procurement requirements, vendor surveillance and review of vendor activities is performed by Duke personnel or others for Steam Production as required. This arrangement provides for witnessing of significant tests and fabrication checkpoints and evaluation of overall v-:ndor performance. Vendor audits and surveillances are performed in accordance with policies contained in the Design Engineering Department Quality Assurance Manual.

i l

4.

The organizational structure, administrative requirements, responsi-bilities and authorities specific to the Nuclear Safety Review Committee are detailed in a written charter and in the Technical Specifications.

The Nuclear Safety Review Committee has the following general responsi-bilities:

(a) Revicw proposed tests and experiments, and results thereof, when these involve an unreviewed safety question.

(b) Review proposed station modifications which involve an unreviewed satety question.

(c) Review requests to the AEC/ DOL for changes in the station's Technical Specifications, or license, that involve an unreviewed safety question.

(d) Re

- abnormal occurrences, unusual events and violations of the station's Technical Specifications, and make recommendations to prevent recurrence.

(e) Periodically review the functioning of the Steam Production Depart-ment operational quality assurance program.

(f) Conduct special reviews and investigations as requested by management.

The Station Review Committee is appointed by the Station Superintendent and serves as an independent review body reporting to the Station Super-intendent.

The organizational structure, administrative requirements, responsibilities and authorities of the Station Review Committee are as specified in the Technical Specifications.

The Station Review Com-mittee has the following general responsibilities, as directed by the Station Superintendent.

(a) Review safety-related procedures and significant changes to approved safety-related procedures.

(b) Review proposed safety-related station modifications.

(c) Review proposed changes to the station's Technical Specifications.

(d) Review abnormaJ occurrences, unusual events and violations of the station's Technical Specifications.

(c) Review safety-related station operations.

(f) lbke recommendations concerning station safety to the Station Super-intendent.

The Station Review Committee does not interact, directly, with the Quality Assurance Staffs.

The activities of the Station Review Committee r however, audited by the departmcatal Quality Assurance Staff.

are i

5.

The Steam Production Department " Administrative Policy Manual for Op-erational Quality Assurance of Nuclear Stations' requires that on-site inspections be performed for safety-related structures, systems and components to:

(a) Observe for signs of wear, deterioration or loss of efficiency.

(b) Verify compliance with cleanliness requirements.

(c) Verify compliance with certain station procedures for operation and maintenance.

These inspections are performed in accordance with written procedures, checklists or criteria. Personnel assigned as inspectors are responsible and qualified individuals who are independent of the activity being in-spected.

Off-site inspections of vendor facilities, for vendor evaluation or for surveillance of the fabrication of purchased materials, parts and com-ponents, are performed for the Steam Production Department by the Design Engineering Department in accordance with the policies of the Design Engineering Department quality assurance program.

A copy of the Steam Production Department Quality Assurance Staff audit plan is given in Figure 5-1.

A copy of the Oconee Nuclear Station Quality Assurance Staff audit plan is presented in Figure 5-2.

Figures 5-3 and 5-4, respectively, contain job descriptions for the Manager, Quality Assurance, Steam Production and for the Station Quality Assurance Engineer.

STEAM PRODUCTION DEPARTMENT QUALITY ASSURANCE STAFF AUDIT PLAN 1.0 Conduct of Audits The Steam Production Department Quality Assurance Staff shall assure that audits of nuclear station activities are carried out in compliance with Section 2.6.2.3 of the Duke Power Company Steam Production Depart-ment " Administrative Policy Manual for Operational Quality Assurance of Nuclear Stations" and Criterion 18 of 10CFR50, Appendix B.

2.0 Audit Objective The objective of these audits shall be verification that station safety-related activities are in compliance with established requirements.

3.0 Audit Frequency Routine audits shall be conducted as necessary and no less frequently than as delineated in Enclosure 8.1.

All aspects of each listed activity will not necessarily be covered in the same audit.

4.0 Special Audits Special audits, defined as audits other than those listed in Enclosure 8.1, shall be conducted at ti:ie request of the Corporate Quality Assurance Manager; the Assistant Vice President, Steam Production; or the Manager, Steam Production.

5.0 Exit Interviews The auditor (s) shall discuss audit findings with the applicable Station Superintendent at the conclusion of an audit.

6.0 Audit Reports The results of each audit shall be summarized in an audit report, with documentation attached.

These reportp and supporting documentation shall be retained for a minimum of six (6) years.

Copics of the audit reports shall be submitted to the Corporate Quality Assurance Manager; the Asciarant Vice President, Steam Pkoduction; the chairman of the Nuclear Safety Review Committee; the Station Superintendent and others as appropriate.

7.0 Deficiencies Deficiencies discovered during an audit shall be identified and cor-rective action recommended, as appropriate. When any significant deficiency is found, that item should be reaudited.

If corrective action is recommended, implementation should be verified by additional audit.

Figure 5-1 n

9 8.0 Enclosurer, 8.1 Routine Audit Frequency l

l Figure 5-1 (Cont'd)

ENCLOSURE 8.1 ROUTINE AUDIT FREQUENCY Minimum Audit Frequency Item to be Audited At Each Station (Months)

Document Control 1.

Controlled copics of the Administrative Policy Manual for Operational Quality Assurance of Nuc1 car Stations 6

2.

Letter files 24 3.

Drawing Master File 12 4.

Drawing Working Files 12 5.

Drawing index 12 6.

Vendor document index 24 7.

Procedure Master File 12 8.

FSAR index and copies 6

j Station Records Management 12 Control of Measuring and Tast Equipment 1.

Identifying designations 24 2.

Calibration tags 12 3.

Calibration expiration 12 l

4.

Storage 24 5.

Issue control 24 6.

Equipment histories 12 Control of thterials, Parts and Components 1.

Requisition and Purchase Orders 12 2.

Segregation of "uninspected," " accepted,"

" nonconforming," and " hold" items 6'

3.

Receiving Inspection Reports 6

4.

Identifying designations on acceptable items 12 5.

Special r orage requirements 24 6.

Issue rt safety-related materials, parts, and components 6

7.

Tagginr,of received materials, parts and components 6

8.

" Report of Nonconformance" files if 9.

" Report of Return of Nonconforming item" files 12 Qualifications and Training of Personnel 24 Operations 1.

Operating Procedures 6

2.

Emergency Procedures 6

3.

Personnel 12 4.

Alarm response manual 18 5.

Switchboard records 12 Figure 5-1 (Cont'd) i

Minimum Audit Frequency Item to be Audited At Each Station (Monthn) 6.

Reactor Operations Logbook 12 7.

Shift Supervisor Logbook 12 Station Testing 1.

Comprehensive test schedule impicmentation 24 2.

Preoperational Tests (TP's) 6*

3.

Periodic Tests (PT's) 12 4.

Instrument Procedures (IP's) 12 5.

Tagout log, as applicable 6

6.

Test personnel 24 7.

Documentation 12 Maintenance 1.

Maintenance Procedures (MP's) 12 2.

Scope of maintenance activitics covered by procedures 24 3.

Station job order fi?cs (Plant Work Order File) 12 4.

Tagout logs, as applicable 6

5.

thintenance personnel 24 Station Modifications 1.

Master list of Station Modification Forms 12 2.

Departmental lists of Station Modification Forms 12 j

3.

Station Modification Packages 6

4.

Implementation of Station Modification Packages 6

5.

Follow-up on verbally approved station modifications 6

6.

Inspection or testing of implemented station r

I modifications 6

l i

Inspections I

1.

Inservice Inspections 24 2.

Cl(anliness Inspections 24 3.

Procedure Compliance Inspections 24 l

4.

Taggut logs, as applicable 6

Controltof Special Processes i

1.

Procedure qualifications 12 2.

Personnel qualifications 12 3.

Station job orders (Plant Work Orders) 12 l

  • During the preoperational testing period only.

Figure 5-1 (Cont'd)

Minimum Audit Frequency item to be Audited At Each Station (Months) i Station Security _

1.

Security hardware 12 2.

Cuard logs 12 i

3.

Security badges 12 4.

Procedures 12 I

5.

Visitor records 12 6.

Security systems tests and maintenance 12 7.

Security threat notification lists 12 8.

Personnel IIcalth Physics 1.

Personnel dose records 12 2.

Survey and monitoring records 12 3.

Environmental monitoring records 12 4.

Radiation vaste disposal records 12 5.

Radioactive source inventory records Special Nuclear Materials Safeguards 1.

Reports on reccipt inspection and storage of nuclear materials 6

2.

AEC 741 forms (shipping form) 24 3.

AEC 742 forms (semi-annual inventory form) 24 4.

Computer printout of fuel assembly locations 12 5.

License requirement compliance for location 18 6.

Fuel assembly log 12 Unusual Event and Abnormal Occurrence Reports 1.

Notification of AEC and Nuclear Safety Review Committee 12 2.

Investigations 12 3.

Evaluations 12 4.

Corrective action 12 5.

Documentation 12 i

6.

Verification of capability of structures, systems and components to perform 12 l

7.

Safety analyses 12 Station Review Committec 24 Station QA Group 1.

Station QA audit summnrics 6

2.

Station QA Audit Plan 24' I

i Figure 5-1 (Cont'd)

OCONEE NUCLEAR STATION QUALlTY ASSURANCE STAFF AUDIT PLAN I

1.

The Quality Assurance Staff of Oconee Nuclear Station shall be responsible for carrying out audits as defined by Section 2.6.2.5 of Duke Power Company's Administrative Policy Manual for Operational Quality Assurance.

2.

The purpose of these audits shall be to verify that the station's activities are in compliance with established requirements.

3.

Audits shall be conducted as necessary and no less frequently than defined in Enclosure 1 of this audit plan.

Special audits shall be conducted at the request of the Manager, Quality Assurance, Steam Pro-duction and the Station Superintendent.

4.

Audits shall be conducted in accordance with written procedures, in-structions, checklists, etc.

During the conduct of an audit, t'ae audit may be expanded to include additional it ems not originally listed.

5.

The areas to be audited on a regular basis are listed in Enclosure 1.

6.

Deficienc'ics discovered during an audit shall be identified and ccrrective action recommended, as appropriate. When any significant deficiency is found, that item should be reaudited and, if corrective action is ree-l l

recommended, steps should be taken to verify implementation.,

]

7.

The results of each audit conducted shall be summarized and a copy of this summary submitted to the Manager, Quality Assurance, Steam Pro-1 duction and the Station Superintendent.

I i

Figure 5-2 a-

ENCLOSURE 1 AUDIT FREQUENCY Minimum Audit i

Item to be Audited Frequency 1.

Preoperational Tests Monthly

  • 2.

Work Orders Monthly 3.

Station Security Quarterly 4.

Shift Supervisor Logbook Quarterly 5.

Reactor Operations Logbook Quarterly 6.

Spare Parts Quarterly 7.

Operating Procedures Quarterly 8.

Maintenance Procedures Quarterly 9.

Electrical Interlock Bypass Log Quarterly 10.

1:ed Tag Los Quarterly 11.

White Tag Log Quarterly 12.

Periodic Tests Quarterly 13.

Drawings Semi-annually 14.

Instrumentation Charts i

Semi-annually 15.

Measuring and Test Equipment Semi-annually 16.

Nucicar Fuel Records l

Annually 17.

Equipment Maintenance Histories Annually 18.

Radiation Exposure Records Annually l

  • During the preoperational testing period only.

Figure 5-2 (Cont'd)

JOB DESCRIPTION Manager, Quality Assurance Steam Production Department The Manager, Quality Assurance, Steam Production shall have the qualifications and be responsible as described herein, and shall not be assigned duties or responsibilitics which are not related to operational quality assurance.

A.

Qualifications The Manager, Quality Assurance, Steam Production shall have a minimum of five (5) years of responsible power generat. ion experience. A maximum of four (4) years of this experience may be fulfilled by academic training on a one-for-one time basis.

B.

Duties and Responsibilitics The Manager, Quality Assurance, Steam Production shall have the following duties and responsibilities:

1.

The Manager, Quality Assurance, Steam Production shall represent the C'rporate Quality Assurance Manager in the organization and imple-mentation of operational quality assurance activities within the Steam Production Department.

This organizational responsibility should include assessment of the numbers of personnel in the various fields of expertisc that are required to adequately carry out the operational quality assurance program both at the departmental and the station 1cvels.

The Manager, Quality Assurance, Steam Production should advise the departmental management of these requirements in order that suitable personnel can be hired into the quality assurance organization.

The Manager, Quality Assurance, Steam Production should review the qualifications of potential quality assurance personnel to assess their suitability for the Quality Assurance Staff.

The Manager, Quality Assurance, Steam Production shall assure implementation of the operational quality assurance program by in~

clusion of appropriate policies in the Duke Power Company, Steam Production Department " Administrative Policy Manual for Operational QualityAssuranceofNuclearftations."

The Manager, Quality Assurance, Steam Production shall keep the Corporate Quality Assurance Manager informed about the operational quality assurance program by means of copics of audit summaries and other suitable correspondence.

2.

The Manager, Quality Assurance, Steam Production shall process proposed revisions to the " Administrative Policy Manual for Opera-tional Quality Assurance of Nuclear Stations" and shall assure their review by appropriate personnel. Revisions approved by the Assistant Vice President, Steam Production shall be issued by the Manager, Figure 5-3

l l

Quality Asuurance, Steam Production to the holders of controlled copies of the manual.

3.

The Manager, Quality Assurance, Steam Production shall recommend action where appropriate to resolve problems relating to operational l

quality assurance.

Such recommendations shall be documented and a copy furnished to the Corporate Quality Assurance Manager.

4.

The Manager, Quality Assurance, Steam Production shall supervise the maintenance of the Steam Production Department General Office quality assurance document files and shall be responsible for assuring the completeness and adequacy of such documents.

These documents should include purchase documents for safety-related items purchased by Steam Production as well as other documents deemed appropriate by the Manager, Quality Assurance, Steam Production, such as copics of station quality assurance documents.

5.

The Manager, Quality Assurance, Steam Production shall coordinate operational quality assurance activitics wh groups and individuals external to the Steam Production Department.

6.

The 1bnager, Quality Assurance, Steam Production shall consult with the Corporate Quality Assurance Manager, the Manager, Quality As-surance, Design Engineering, the nuclear station superintendents and other appropriate personnel to assure that the requirements of the operational qutlity assurance program are properly interpreted and followed, and to review probicas and determine methods for resolution.

7.

The Manager, Quality Assurance, Steam Production shall review the operational quality assurance program to assure its continued adequacy in light of changes in regulatory requirements, applicable codes and standards, or station systems or equipment.

The program shall be kept adequate by means of suitable revisions to the "Ad-ministrative Policy Manual for Operational Quality Assurance of Nuclear Stations."

8.

The Manager, Quality Assurance, Steam Production shall assure that periodic audits of each nuclear station's activities are conducted in compliance with Criterion 18 of Appendix B to 10CFR50 and to verify the station's compliance with established requirements.

This program of audits is to be in accordance with a long-range schedule developed by the Manager, Quality Assurance, Steam Production prior to the first refueling at cach station and is to include an audit of each safety-related activity on a schedule commensurate with its significance, but no less frequently than biennially. Audits of each station shall be made no less frequently than semi-annually except that they shall be no less frequent than quarterly prior to the first refueling at a station.

9.

The Manager, Quality Assurance, Steam Production shall be responsible for establishing a Steam Production Department Quality Assurance Staff to assist in implementing the operational quality assurance program Figure 5-3 (Cont'd)

and shall be responsible for directing this staff.

The staff should include sufficient personnel with suitable training or experience to adequately carry out the operational quality assurance program.

10.

The Manager, Quality Assurance, Steam Production shall establish functional guidelines for the station Quality Assurance Engineers in matters of operational quality assurance.

These guidelines should be in cuch areas as audit coverage, audit frequency, audit report format, number of quality assurance personnel, etc.

i l

1 e

Figure 5.3 (Cont'd)

6.

The enclosure to Mr. A. C. Thies' letter of April 27, 1973 to Mr. R. C.

DeYoung state ', in part, as follows.

"The operational quality airrance program for Oconce Nuclear Station has been compared with thu guidelines expressed in Safety Guide 33,

" Quality Assurance Program Requirements (Operation)," dated November 3, 1972.

It has been detarmined that the content of this program is in agreement with thor-Jelines as expressed in Safety Guide 33."

3 It is Duke Power Company's intention to maintain the content of its operational quality assurance program for nuclear stations in agreement with the guidelines as expressed in Safety Guide 33.

G e

e i

3.

The Quality Assurance Engineer shall maintain that portion of the station's Master File which contains quality assurance records compiled in the design and conntruction of the station, following receipt of such records from the organization (s) responsible for the station design and/or construction.

The Quality Assurance Engineer shall assure that station facilities for these files are suitable for long-term storage.

4.

The Quality Assurance Engineer shall maintain that portion of the station's Master File which contains preoperational test procedures and permanent station procedures and shall assure that station facilities for these files are suitabic for long-term storage.

5.

The Quality Assurance Engineer shall maintain that portion of the station's Master File which contains copics of receipt inspection reports, nonconfctming item reports and returned nonconforming item reports, and shall assure that station facilities for these files are suitable for long-term storage.

6.

The Quality Assurance Engiener shall assure the proper performance of inspections and investigations as deemed appropriate by the Manager, Quality Assurance, Steam Production.

The Q'ality Assurance Engineer shall recommend action to the Manager, 7.

u Quality Assurance, Steam Production or the Station Superintendent, where appropriate, to resolve problems relating to cperational quality assurance.

8.

The Quality Assurance Engineer shall have other duties anu responsibilities relating to operational quality assurance as deemed appropriate by the Manager, Quality Assurance, Steam Production.

9.

The Quality Assurance Engineer shall be responsible for directing the activities of the station Quality Assurance Staff, which shall assist him in implementing the operational quality,3surance program at the station. He should assess the required number of personnel to carry out the station operational quality assurance program and advise the Manager, Quality Assurance, Steam Production so that a sufficient number of personnel can be hired into the Quality Assurance Staff.

I s

l Figure 5-4 (Cont'd)

~

JpB DESCRIPTION Steam Produc 1.on Department Nuclear Station Quality Assurance Engineer The Quality Assurance Engineer shall have the qualifications and be responsible as described herein, and shall not be assigned dut.ies or responsibilities whichh are not related to cperational quality assurance.

A.

Qualifications The Quality Assurance Engineer shall have a minimum of five (5) years of responsible power generation experience.

A maximum of four (4) years of this experience may be fulfilled by academic trailiing on a one-for-one time basis.

B.

Duties and Responsibilities The Quality Assurance Engineer shall have the following duties and responsi-bilities:

1.

The Quality Assurance Engineer shall represent the Manager, Quality Assurance, Steam Production in the organization and implementation of operational quality assurance activities within the station.

This organizational responsibility should include assessment of the numbers of personnel that are required to adequately carry out the operational quality assurance program at the station level.

Assurance Engineer should advise the Manager, Quality Assurance, SteamThe Quality Production of these requirements in order that suitable personnel can be hired into the Quality Assurance Staff.

The Quality Assurance Engineer shall assure duplementation of the operational quality assurance program at the station by carrying out the policies of the Duke Power Company, Steam Poduction Department "Admini-strative Policy Manual for Operational Quality Assurance of Nuclear Stations."

The Quality Assurance Engineer shall keep the Manager, Quality Assurance, Steam Production informed about station quality assurance activities by i

means of copies of audit summaries and other suitable correspondence.

The Quality Assurance Engineer shall assure that periodic audits of the stations activitics are conducted to verify compliance with established requirements.

These audits are to be in accordance with a long-range schedule developed by the Quality Assurance Engineer prior to the first refueling and are to include an audit of each safety-related activity on a schedule commensurate with its significance but no less frequently than biennially.

Station audits shall be conducted by the Quality Assurance Engineer no less frequently than monthly.

Figure 5-4

.