Forwards IE Insp Rept 50-369/80-06 on 800423-25.No Noncompliance Noted
ML19312E959
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 05/08/1980
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML19312E956 List:
References
NUDOCS 8006180240
Download: ML19312E959 (2)


See also: IR 05000369/1980006

Text

.

/

'o,,

UNITED STATES

'

8

NUCLEAR REGULATORY COMMISSION

C^ g

,,

a

REGION ll

b[

101 MARIETTA ST., N.W.. SUITE 3100

y

o,

o

ATLANTA, GEORGIA 30303

  • ess*

MAY 0 81930

In Reply Refer To:

RII:TJD

50-369/80-06

Duke Power Company

ATTN:

W. O. Parker, Jr.

Vice President, Steam Production

P. O. Box 2178

Charlotte, NC 28242

Gentlemen:

This refers to the inspection conducted by Thomas J. Donat of this office on

April 23-25, 1980 of activities authorized by NRC Construction Permit No. CPPR-83

for the McGuire Nuclear Station facility, and to the discussion of our findings

held with M. D. McIntosh at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

Within the scope of this inspection, no items of noncompliance were disclosed.

.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

'

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any io % mation that you (or your contractor) believe to be

proprietary, it is nccessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the applicatien is contained in a

separate part of the document.

If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

.

Sincerely,

f..C.

C.

ewis, Acting Chief

Reactor Operations and Nuclear

Support Branch

Enclosure:

Inspection Report No. 50-369/80-06

cc w/ encl:

(See Page 2)

8006180 pg

. .-..

-

-

. --.

. - - .

--

-.

. . - --

.

.

. . . - . . . . ..

. . - . -.._

.

- -

- -

-

,.

1

.

MAY 0 81980

Duke Power Company

-2-

g,

i

!

cc w/ enc 1:

.

M. D. McIntosh, Plant Manager

j

P. O. Box 488

Cornelius, NC 28031

!

J. C. Rogers, Project Manager