ML19312E797

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-321/80-06 & 50-366/80-06 on 800219-21 & Notice of Deviation
ML19312E797
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 03/31/1980
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML19312E784 List:
References
NUDOCS 8006090540
Download: ML19312E797 (2)


See also: IR 05000321/1980006

Text

_

_ _ _ _ - _ _ _ _ _ _

- - - - _ 7--

- - --

-

_

_

_

_

'(

-

!$

%

n

&

UNITED STATES

Cy

3.

NUCLEAR REGULATORY COMMISSION

6

,e

REGION il

k

'*

/

101 MARIETTA ST

N.W., SUITE 3100

5

ATLANTA, GEORGIA 3o3o3

ga....f

,

.

MAR 311980

In Reply Refer To:

RII:RCS

50-321/80-6

50-366/80-6

,

Georgia Power Company

ATfN:

J. H. Miller, Jr.

,

Zxecutive Vice President

270 Peachtree Street

Atlanta, GA 30303

Gentlemen:

This refers to the inspection conducted by R. C. Sauer of this office on

February 19-22, 1980 of activities authorized by NRC License Nos. DPR-57 and

NPF-5 for the Hatch facility, and to the discussion of our findings held with

,

M. Manry at the conclusion of the inspection.

..

Areas examined during the inspection and our findings are discussed in the

enclosed inspec'

a report. Within these areas, the inspection consisted of

'

selective examin cions of procedures and representative records, interviews with

personnel, and observations by the inspectors.

Within the scope of this inspection, no itere.s of noncompliance were disclosed.

During the inspection it was found that certain activities under your license

appear to deviate from generally accepted industry practices and have safety

significance. This item is identified in the Notice of Deviation enclosed

herewith as Appendix A.

Please provide us in writing within 20 days of your

'

receipt of this letter your comments including a description of corrective

actions that have been or will be taken, corrective actions which will be taken

to avoid furthe. deviations, and the date corrective actions were or will be

completed.

In accordance with bection 2.790 of the NRC's " Rules of Practice," Part 2,

j

Title 10, Code of Federal Regulations, a copy-of this letter and the enclosed

5

inspection report will be placed in the NRC's Public Document Room. If this

report contains any,information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

,

separate part of the document. If we do not hear from you in this regard within

,

i

the sIecified period, the report will be placed in the Public Document Room.

t

t

f

o

i

L

u

8006090 M

-

k

l

__ ___

_ _ _ _ .

--

--

__

_

_ - - -____

. . . . - - ..

. . . . . - - .

- - - - - - - - -

-- -

'

, e

i

-

MAR 311980

Georgia Power Company

-2-

.

,

'?

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

.

Sincerely,

E.c

R. C.

wis, Acting Chief

Reactor Operations and Nuclear

Support Branch

a

Enclosures:

1.

Appendix A, Notice of Deviation

2.

Inspection Report Nos. 50-321/80-6 and

.

50-366/80-6

cc w/ encl:

M. Manry, Plant Manager

P. O. Box 442

Baxley, GA 31513

C. E. Belflower

Site QA Supervisor

P. O. Box 442

Baxley, GA 31513

W. A. Widner

Vice President and General Manager

Nuclear Generation

Georgia Power Company

.

Post Office Box 4545

Atlanta, GA 30303

,

.

.

e

4*

.t

.

O

i

ei

t.

5

,

'l

.

.-