Text
_
_ _ _ _ - _ _ _ _ _ _
- - - - - _ 7--
- - --
-
_
_
_
_
'(
-
!$
%
n
&
UNITED STATES
Cy
3.
NUCLEAR REGULATORY COMMISSION
6
,e
REGION il
k
'*
/
101 MARIETTA ST
N.W., SUITE 3100
5
ATLANTA, GEORGIA 3o3o3
ga....f
,
.
MAR 311980
In Reply Refer To:
RII:RCS
50-321/80-6
50-366/80-6
,
Georgia Power Company
ATfN:
J. H. Miller, Jr.
,
Zxecutive Vice President
270 Peachtree Street
Atlanta, GA 30303
Gentlemen:
This refers to the inspection conducted by R. C. Sauer of this office on
February 19-22, 1980 of activities authorized by NRC License Nos. DPR-57 and
NPF-5 for the Hatch facility, and to the discussion of our findings held with
,
M. Manry at the conclusion of the inspection.
..
Areas examined during the inspection and our findings are discussed in the
enclosed inspec'
a report. Within these areas, the inspection consisted of
'
selective examin cions of procedures and representative records, interviews with
personnel, and observations by the inspectors.
Within the scope of this inspection, no itere.s of noncompliance were disclosed.
During the inspection it was found that certain activities under your license
appear to deviate from generally accepted industry practices and have safety
significance. This item is identified in the Notice of Deviation enclosed
herewith as Appendix A.
Please provide us in writing within 20 days of your
'
receipt of this letter your comments including a description of corrective
actions that have been or will be taken, corrective actions which will be taken
to avoid furthe. deviations, and the date corrective actions were or will be
completed.
In accordance with bection 2.790 of the NRC's " Rules of Practice," Part 2,
- j
Title 10, Code of Federal Regulations, a copy-of this letter and the enclosed
5
inspection report will be placed in the NRC's Public Document Room. If this
report contains any,information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold such information from public disclosure. Any such
application must include a full statement of the reasons on the basis of which
it is claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained in a
,
separate part of the document. If we do not hear from you in this regard within
,
i
the sIecified period, the report will be placed in the Public Document Room.
t
t
f
o
i
L
u
8006090 M
-
k
l
__ ___
_ _ _ _ .
--
--
__
_
_ - - -____
. . . . - - ..
. . . . . - - .
- - - - - - - - -
-- -
- '
, e
i
-
MAR 311980
Georgia Power Company
-2-
.
,
'?
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
.
Sincerely,
E.c
R. C.
wis, Acting Chief
Reactor Operations and Nuclear
Support Branch
a
Enclosures:
1.
Appendix A, Notice of Deviation
2.
Inspection Report Nos. 50-321/80-6 and
.
50-366/80-6
cc w/ encl:
M. Manry, Plant Manager
P. O. Box 442
Baxley, GA 31513
C. E. Belflower
Site QA Supervisor
P. O. Box 442
Baxley, GA 31513
W. A. Widner
Vice President and General Manager
Nuclear Generation
Georgia Power Company
.
Post Office Box 4545
Atlanta, GA 30303
,
.
.