ML19312E683
| ML19312E683 | |
| Person / Time | |
|---|---|
| Site: | Washington Public Power Supply System |
| Issue date: | 05/30/1980 |
| From: | Spencer G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Strand N WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML19312E684 | List: |
| References | |
| NUDOCS 8006090402 | |
| Download: ML19312E683 (1) | |
See also: IR 05000460/1980004
Text
'
c?ta
,'O,
- s.
n
UNITED STATES
..
[.
,
y,
g
NUCLEAR REGULATORY COMMISSION
.
L
.j
REGION V
0,
g
1990 N. CALIFORNI A BOULEVARD
%,
,d*
SulTE 202, WALNUT CREEK PLAZA
- ,*
WALNUT CREEK, CALIFORNIA 94596
'
0W
Docket ilos. 50-460
50-513
Washington Public Power Supply System
P. O. Box 968
Richland, Washington 99352
Attention: Mr. fl. 0. Strand
Managing Director
Gentlemen:
Thank you for your letter dated May 15, 1980 informing us of the steps you have
taken to correct the item which we brought to your attention in our letter
dated April 15, 1980. Your corrective actions will be verified during
future
inspection.
Your cooperation with us is appreciated.
Sincerely,
$
l'
G. S. Spencer, Chief
Reactor Construction and
Engineering Support Branch
N_
80 06090 V01
g
. -
.
.