Forwards IE Bulletin 80-12, Decay Heat Removal Sys Operability. No Written Response Required.Ie Info Notice 80-20, Loss of Decay Heat Removal Capability at Davis-Besse Unit 1 While in Refueling Mode Encl
ML19312E344
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 05/09/1980
From: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Ferguson J
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
References
NUDOCS 8006040261
Download: ML19312E344 (2)


Text

- _ - _ - - _ _

L

'o UNITED STATES 8

k NUCLEAR REGULATORY COMMISSION g

,a REGION 11 o,

101 MARIETTA ST., N.W., SUITE 3100 ATLANTA, GEORGIA 30303 MAY 9 1980 In Reply Refer To:

RII:JPO.

-502404, 50-405 h_0-339 Virginia Electric and Power Company

. Attn:

J. H. Ferguson Executive Vice President-Power P. O. Box 26666 Richmond, Virginia 23261 Gentlemen:

The enclosed Bulletin 80-12 is forwarded to you for information. No written response is required. If you desire additional information regarding this matter, please contact this office.

Sincerely, AB "Q '%J James P. O' Reil Director

Enclosures:

1.

IE Bulletin No. 80-12 2.

List of Recently Issued IE Bulletins 1

-i:;

i i

,l j

ii

. c. w - a : -

L e

a I

s upo 4M61_.

. - O

f NY 9 1980 Virginia Electric and Power Company !

cc w/ encl:

i W. R. Cartwright, Station Manager Post Office Box 402 Mineral, Virginia 23117 P. G. Perry Senior Resident Engineer Post Office Box 38 i

Mineral, Virginia 23117 1

a 2

d i

4 S

I r

4 i'

O e

l o

l e

""M desse ese e-*

4.-

.e e.m.

UNITED STATES SSINS No.:

6820 j

NUCLEAR REGULATORY COMMISSION Accession No.:

OFFICE OF INSPECTION AND ENFORCEMENT 8005050053 WASHINGTON, D.C. 20555 1

May 9, 1980 IE Bulletin No. 80-12 DECAY HEAT REMOVAL SYSTEM OPERABILIT(

==

Introduction:==

i The intent of this Bulletin ir to improve nuclear power plant safety by reducing the likelihood of losing decay heat removal (DHR) capability in operating pressurized water reactors (PWRs).

PWRs are most susceptible to losing DHR capability when their steam generators or other diverse means of removing decay heat are not readily available. Such conditions often occur when the plants are in a refueling or cold shutdown mode, and during which time concurrent maintenance activities are being perforn.ed.

There is a need to assure that all reasonable means have been taken to provide redundant or diverse means of DHR during all modes of operation.

(Note: A redundant means could be provided by Saving DHR Train A AND Train B operable; a diverse mean:, could be provided by having either DHR Train A OR Train B operable AND a steam generator available for DHR purposes.) There is also need to assure that all reasonable means have been taken to preclude the loss of DHR capability due to common mode failures during all modes of operation.

Background:

On several occasions, operating PWRs have experienced losses of DHR capability.

In each instance, except that of the Davis-Besst. ~ :t 1 incident of April 19, 1980, DHR capability was restored prior to exceu

> the specified RCS temper-ature limit for the specific mode of operation. henetheless, the risk and frequency associated with such events dictate that positive actions be taken to preclude their occurrence or at least ameliorate their effects.

The most noteworthy example of total loss of DHR capability occurred at Davis-Besse Unit 1 on April 19, 1980.

(See IE Information Notice No. 80-20, attached hereto as Enclosure 1).

Two factors identified as major contributors to the Davis-Besse event in the Information Notice are:

(1) extensive maintenance activities which led to a loss of redundancy in the DHR capability, and (2) inadequate procedures and/or administrative controls which, if corrected, could have preclu::cd the event or at least ameliorated its effects.

ACTIONS TO BE TAKEN BY LICENSEES OF PWR FACILITIFS:

1.

Review the circumstances and seq cribed in Enclosure 1.

2.

Review your facility (ies) for al DUPLICATE DOCUMENT especially for events similar to Entire document previously entered into system under:

ANO b

No. of Pages:

Y W

SSINS No.: 6870 UNITED STATES Accession No.:

NUCLEAR REGULATORY COMMISSION 8002280671 0FFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D. C. 20555 May 8, 1980 IE Information Notice 80-20

~-

LOSS 0F' DECAY HEAT REMOVAI CAP 1BIIITY AT DAVIS;BESSEWT ~1 WHILE IN A

~

~

~

REFUELING MODE Description of Circumstances:

On April 19, 1980, decay heat removal capability was lost at Davis-Besse Unit I for approximately two and one-half hours. At the time of the event, the unit was in a refueling mode (e.g., RCS temperature was 90F; decay heat was being removed by Decay Heat Loop No. 2; the vessel head was detensioned with bolts in place; the reactor coolant level was slightly below the vessel head flanges; and the manway covers on top of the once through steam generators were removed).

(See Enclosure A, Status of Davis-Besse 1 Prior to Loss of Power to Busses E-2 and F-2 for additional details regarding this event.)

Since the plant was in a refueling mode, many systems or components were out of service for maintenance or testing purposes.

In addition, other systems and components were deactivated to preclude their inadvertent actuation while in a refueling mode. Systems and components that were not in service or deactivated included:

Containment Spray System, High Pressure Injection System; Source Range Channel 2; Decay Heat Loop No. 1; Station Battery IP and IN; Emergency Diesel-Generator No.1; 4.16 KV Essential Switchgear Bus C1; and 13.8 KV Switchgear Bus A (this bus was energized but not aligned).

In brief, the event was due to the tripping of a non-safeguards feeder breaker in 13.8 KV Switchgear Bus B. Because of the extensive maintenance and testing activities being conducted at the time, Channels 1 and 3 of the Reactor Protec-tion System (RPS) and Safety Features Actuation System (SFAS) were being ener-gized from only one source, the source emanating from the tripped breaker.

Since the SFAS logic used at Davis-Besse is a two-out-of-four input scheme in which the loss (or actuation) of any two input signals results in the actuation of all four output channels (i.e., Channels 1 and 3, and Channels 2 and 4), the loss of power to Channels 1 and 3 bistables also resulted in actuation of SFAS

  • ~

Channels 2 and 4.

The actuation of SFAS Channels 2 and in Decay Heat Loop No. 2, the operating ' ~

Since the initiating event was a los were actuated (i.e., Level 1 - High DUPLICATE DOCUMENT tion; Level 3 - Low Pressure Injecti Entire document Previously entered into system under.

nNo T o o D B % G 7 I No. of pages:

.