Forwards IE Insp Repts 50-413/80-01 & 50-414/80-01 on 800123-25.No Noncompliance Noted
ML19312D140
Person / Time
Site: Catawba  
Issue date: 02/04/1980
From: Bryant J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML19312D139 List:
References
NUDOCS 8003210256
Download: ML19312D140 (2)


See also: IR 05000413/1980001

Text

77 _

--

-

-

-

y[ . -

s .

-

,

-

/

9,j

.

.

. UNITED STATES

8-

NUCLEAR REGULATORY COMMISSION -

.

yp

o

REGION il i

-

.;

p

8,

j

.101 MARIETTA ST., N.W SulTE 3100

t

_

.%*..**** [.

ATLANTA. GEORGIA 30303

FEB .41980 -

,

In Reply Refer'.To:-

.

RII:JRH

50-413/80-01'

<

50-414/80-01

-suke Power Company

..

ATTN: . V.iO. Parker, Jr.

.

Vice President, S. team Production

.

P.-O. Box 2178

1 Charlotte, N C: 28242

3

Gentlemen:

,

LThis refers to the inspection conducted by J. R. Harris of this office on.

January 23-25, 1980, of activities authorized by NRC Construction Permit Nos.

CPPR-116 and'CPPR-117 for the Catawba facility, and to the discussion of our

.

findings held with D. Beam at the conclusion of the inspection.

!

. Areas examined during the inspection and our findings ~are' discussed in the

enclosed inspection report. 'Within these' areas, the inspection consisted of

selective examinations of procedures and representative. records, interviews with

. personnel,:and observations by the inspector.

.Within the scope of this inspection, no items of noncompliance were

disclosed.~

.

'In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of FederalzRegulations, a. copy of this letter and the enclosed

i '

-inspection report will be placed in the NRC's Public Document Room.

If this

k

' report contains'any information that you-(or-.your contractor) believe to be

proprietary, it is necessary.that.you make a written. application within 20 days

Lto.this-office to withhold such information from public disclosure. Any such

application must include a full statement 'of the' reasons on the ~ basis of which

-

Lit is claimed'that the information is proprietary, and should'be prepared so

.that proprietary _information identified in the application is contained in a

7

~

separate part of'the document. If we do not hear from you in this regard within

i

.the specified period,.the-report will be placed in the'Public Document Room.

1

,

'

I

i

r-

'

-

.

.

e

q

-

v

-

.

lg

s

k :-

J

i .

-

j

'

}

I

8003210Z%

.

_

6

,

.

_

.

.

-

- --- -

. = _ _ ,

, _

'

,

R.* 1

_

.,-

,

.

_

.

.

,

c* , .

_.Duka P:w2r. Comp:ny:

-2-

..

.

FEB - 4 E0

..

-

,

g

.q

V

.: Should you have any questions concerning this letter, we will be glad to discuss

. . . .

..

.

'them with you'.

.

y

.s

Sincerely,

,

.

Qu

i ..

J. C..Br

nt, Acting Chief

Reactor Construction and Engineering

Support Branch ~

.

Enclosure

- Inspection Report No. 50-413/80-01

_

and 50-414/80-01

' cc w/ encl:.

'J. W... Hampton, Station Manager

P. O.-Box 392

Clover,'S C 29710

,

'D.-G. Beam, Project Manager