ML19312C443
| ML19312C443 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 10/31/1977 |
| From: | Schwencer A Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML19312C442 | List: |
| References | |
| NUDOCS 7912130969 | |
| Download: ML19312C443 (9) | |
Text
UNITE 3 STATES M
'e NvCLEAR REGULATO",Y COMMIS$10N W ASHINGTON, D. C. 20686 DUKE POWER COMPANY 00CKET NO. 50-269 OCONEE NUCLEAR STATION, UNIT NO. l_
AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 49 License No. DPR-38 1.
The Nuclear Regulatory Comission (the Comission) has found that:
A.
The application for amendment by Duke Power Company (the licensee) dated October 26, 1977, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this smendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
. 2.
Accordingly, the license is anended by' changes to the Technical Specifications as indicated in the attachment to this license amendr. ant and paragraph 3.B of Facility License No. OPR-38 is hereby amanded to read as follows:
3.8 Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.49, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of the date of issuance.
FOR THE NUCLEAR REGULATORY CCWi!SSION
)
i ktogW/6L/
A. Schwencer, Chief Operating Reactors Branch #1 j
Divis :on of Operating Reactors 4
Attachmant:
Changes to the Technical Specifications l
Date of Issuance:
October 31, 1977 i
i i
(
l
" " % e, UNITED STATES f
S.
NUCLEAR REGULATORY COMMISSION
{
-(
i w AswINGToN, c. c. 2osas c
'%.... [..~
DUKE POWER COMPANY DOCKET NO. 50 270 OCONEE NUCLEAR STATION, UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 49 License No. DPR 47 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The acclication for amendment by Duke Power Con.pany (the licensee) dated October 26, 1977, complies with the standards and recuirements of the Atomi: Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; 5.
The facility will operate in conformity with the aoplication, the previsions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendnent can be cenducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in ccmpliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements nave been satisfied.
l
M
~
/
2-2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and caragraph 3.B of Facility License No. OPR-47 is hereby amended tc read as follows:
3.S Technical Scecifications The Technical Specifications contained in A;oendices A and B, as revised through Amendrent No.49 are hereby incorporated in the license.
The licensee shall operate the facility in accordance with the Techn* cal Specifications.
3.
This license amenc eat is effective as of the date o# issuance.
1 FOP THE NUC. LEAR REGULATORY COMMISSION I
1
/
lhaQ?Mdt_
A. Schwencer, Chief '
0:erating-Reactors B-anch el Division of Operating Reactors
Attachment:
Changes tc the Technical Spe ci fi cati ons Date of Issuance: October 31, 1977 i
i
.g3 4%g UNITE 3 STATES 4
9 NUCLEAR REGULATO3Y COMMISSION g
WASHINGTON, D. C. 20586 s,,
DUKE POWER COMPANY DOCKET NO. 50 287 OCONEE NUCLEAR STATION, UNIT NO. 3 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 46 License No. DPR-55 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The apolication for amendment by Duke Power Company (the licensee) dated October 26, 1977, complies with the standards and requiraments of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable recuirements have been satisfied.
_2 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 3.B of Fa:ility License No. DPR-55 is hereby amended to read as follows:
3.B Technical Soecifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 46. are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of the date of issuance..
FOR THE NUCLEAD. REGULATORY COMMISSION A. Schwencer, Chief Operating Reactors Branch #1 Division of Operating Reactors
Attachment:
Changes to the Technical Specifications Date of Issuance: October 31, 1977
ATTACHMENT TO LICENSE AENDENTS AMENDMENT NO.49 TO DPR-38 AMENDMENT NO.49 TODPR-H AMENDMENT NO.46 TO DPR-55 DOCKET NOS. 50-269, 50-270 AND 50-287 Revise Appendix A as follows:
Remove the following page >.ad replace with identically numbered page.
3.5-9 Add the following new page.
3.5-24a I
pump cpera:1.
- Also, excepi! g physics tes-or exercising control rods,-:he axial power shaping c.ntro. rod insertion /
withdrawal lini:s are specific 3 on figures 3.5.2-4A1, 3.5.2-4A2 and 3.5.2-;A3 (Uni: 1): 3.5.2-45.1, 3.5.2-422, and 3.5.2-433 (Unit 2).
If the control red position limits are exceedcd,
[333p corrective censures shall be taken immediately to achieve an xc46' acceptable con:rcl rod pcsition.
An acceptable con:rc! rod ewa s
- Q3f position shall then be attained within two hours.
The minimum DW shu:dec' z;rcin recuired hv.%ecificatica 3.5.2.1 shall be
~
[nY
-" n t a i n e.' a t all times.
i
.-a
..g
'id d.
Except for physica tests, pcuer shall not be increased above the fCi}g, pcwcr Icvel cutoff as shown en Figures 3.5.2-IA1, 3.5.2-1A2 cnc
<~
6 N
3.5 2-1A3 (Uni: 1), 3.5.2-131, 3.5.2-132, and 3.5.2-in3 (Unit :),
3 N: OO
.5.2-lC1, 3.5.2-1C2, 3.5.2-lC3 (Unit 3), unless the followin;
..m gwy va rec.uirinents are me:.
(1)
The xenon reactivity shall be within 10 perrent of the value for operation a: steady-state rated pcuer.
(2)
The xenon reactivity worth has passed its final maximun er minimum peak during its apprcach to its ecuilibrium valve
=
for operation at the pcwer level cutoff.
3.5.2.6 Reactor powcr imbalance shall be monitored on a f requency not to exceed two hours during power operction above 40 percent rated pcwer.
Except for physics tects, inbclance shall be maintained within be envelcpe defincd by Figures 3.5.2-3A1, 3.5.2-3A2, 3.5.2-3A3, 3.5.3-331, 3.5.2-332, 3.5.2-333, 3.5.2-3C1, 3.5.2-3C2, and 3.5.2-3C3.
If :he in-balance 14 not within the envelope defined by these ft2urcs, corrcctive taken to achieve an acceptahle inbalance.
If an acccp-taeasurt s sh.11
!e table imbalance is not achiavcd tithin :wo hours, reac:ar pcuer shall bc_reduccd until imbalance limits are net.
3.5.2.7 The control red drive patch panels shall be locked a: all times wi:h limited cccess to be authorized by the cana;cr or his designa:ed al:ernata.
3.5.2.3 For Cconee Unit 1, in :he event Specifications 3.5.2.4.a or 3.5.2.5.c are not met, operation shall be restricted as fellcws:
The cerc thermal power shall be limited :o 75 percen-full power.
a.
b.
The nuclear power maximum se: point shall be 54 percent full pcuer.
c.
The quadrant tilt shall not execed 6.03 pe,rcent.
d.
The.re;u12:ing centrol red insertion / withdrawal lini:s are specified an Figure 3.5.2-6Al within tI o hcurs, the reacter lf any of the c';cve provisiens are nct ce:
shall be in the hot shutdown condition within an additional 4 hcurs.
Within 25 EFPD of the date of issuance of this Specification, provide a report and analysis of the quadrant flux tilt observed and projections for the next 25 EFPD.
Operation above 75% is not authorized if flux tilt is above 3.41% unless an amandment request is submitted accompanied
)
by detailed evaluation and justification
~
3.5-9 l
Amendments Nos. 49, 49 & 46 L
, m, N!
O l
[Ni,jk Oh LU
- 3 13,.
(1_,5,
- 0 9 )
(170,102)
CFi*AIID IN THli Af;f 0'i I!
/
/
C' tL L:'.!]
t g
$3
/
[
(250,75)
- r. L i
j d
- y
~
/
g,n
,-r iv.
- c.
?., ::
s'
!.J..e. *.y i
J vg.
'a'"
I. A.. a A....
g_
4 y,
L.
./
RESTRICT 2D RECIC:s
~
i Y
% $c -
/
e*
,*g l.,.3 ]-,-Uj
/
i c_
o A
j
/
(250,40)
.i
.C [-
a D. T 7.
- f.T. C..t.O T L u
a 0
( n..
.u..>
G...,
C t. _._. u, _ p....u
- =...
. '.L)L
/r, 13
/
'/
8 f
i i
i __
i c.3 (30.F; C..0; i:0 ag:
R:: leitz, 5 LIncraen 0
25
$]
75 1:0 g
5 53 73 ig; t
i i
t i
i i
__s GrJug $
Groog 7 0
$3 100 k
f.
f.
_f Gr:ua 6 Roc in::: is ::: ;cr::: tag sus at tne ei:.w a.at at iras: 5.5 39:
,I RCD POSITION LIMITS 0R t
FOUR-FUMP OPERATION FRCM C j
Mb TO 100 (:10) EFF0,'JNIT I i
,:s,~..
(N h), COCNEE NUCLEAR STATICN u.m.t' e,
FIG"12 3.5.2-6Al j
3 3
-a Anandment Nos. 49, 49 & 46 ni i
r-n -
--.r-3
,