Monthly Operating Rept for Sept 1974
ML19312C110
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 10/10/1974
From:
DUKE POWER CO.
To:
Shared Package
ML19312C102 List:
References
NUDOCS 7912040537
Download: ML19312C110 (1)


Text

_ _

Oconte iJnit 3 t, NIT October 10. 1974

'h.

DATE W87 DOCKET NO.

OPERATING STATUS September 1, 1974 TliROUGH September 30, 1974 1.

REPORTING PERIOD:

720 HOURS IN REPORTING PERIOD:

2568 MAX. DEPENDABLE CAI ACITY (M%e-NET.

2.

CURRENTLY AUTHORIZED POWER LEVEL (MWttu None 3.

LOWEST POWER LEVEL TO WHICH SPECIFIC ALL) RESTRICTED (It ANYl1M%c NET) 4.

REASONS FOR RESTRICTION (IF ANY):

THis CUMULATIVE REPORTING PI RIOD YR TO DATE TO D ATE 139.4 139.4 139.4 S.

HOURS REACTOR WAS CRITICAL.

N/A 6.

REACTOR RESERVE SHUTDOWN HOURS 71.3 71.3 71.3 7.

HOURS GENERATOR ON LINE.

8.

UNIT RESERVE SHUTDOWN HOURS N/A 9.

GROSS THERMAL ENERGY 61555 61555 61555 GENERATED (MWH)

' O.

GROSS ELECTRICAL. ENERGY 6768 6768 6768 GENER ATED (MWHi 11.

NET ELECTRICAL ENERGY GENERATED N/A (MWH)

N/A 12.

REACTOR AVAILABILITV F 4CTOR (1i

- N/A 13.

UNIT AVAILABILITY F ACTOR (2)

_N / A 14.

UNIT CAPACITY F ACTOR (3)

N/A 15.

UNIT FORCED OUTAGE RATE (4).

16.

SHUTDOWNS SCHEDULED TC, BEGIN IN NEXT 6 MONTFS (STATE TYPE.DATE. AND DUR ATION OF EACH u 17.

IF SHUT DOWN AT END OF REPORT PERIOD ESTIM ATED DATE 01 ST ARTUP.

18.

UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:

DATE LAST DkTE FORECAST ACHIEVED 9/5/74 INITIAL CRITICALITY INITIAL ELECTRICAL g77g774 POWER GENERATION COMMERCIAL OPERATION (1) REACTOR AVAILABILITY FACTOR =

X 100 X 100 (2) UNIT AVAILABILITY FACTOR

=

p NET Ell'CTRIC AL POwT R GE NE R ATFD

('3)

UNIT CAPACITY FACTOR

=

MAX. DLPENDABLt.CAPAt'IT) Mwe NET A HOUk5 IN REPOR flNG PERIOD (4) UNIT FORCED OUTAGE R ATE

=

OURS G1 R

R LINE + FORCt D O'. < 4GE HOURS 7912040 6 3 7-

.