Monthly Operating Rept for Sept 1974
ML19312C105
Person / Time
Site: Oconee 
Issue date: 10/10/1974
From:
DUKE POWER CO.
To:
Shared Package
ML19312C102 List:
References
NUDOCS 7912040532
Download: ML19312C105 (3)


Text

-

Oconee Unit 1

t. NIT

.h DATE Octeter 10. 1974 50-269 DOCKET NO.

OPERATING STATUS 1.

REPORTING PERIOD:

Senterber 1, 1974 TilROUGH Seotember 30. 1974 HOURS IN REPORTING PERIOD: 720 2.

CURRENTLY AUTHORIZED POWER LEV EL(M4mi 2568 MAL DLPENDABLE C AI ACITY tM%e NET

  1. 71 None 3.

LOWEST POWER LEVELTO WHICH 5PLCIFICALLi RESTRICTED (if ANY6(MWc-NETr 4.

REASONS FOR RESTRICTION (IF ANYr THIS CL MULATIVE REPORTING P1 RIOD YR TO D ATE TO 3 ATE 720 5063.5 9417.4 5.

HOURS REACTOR W AS CRITICAL.

6.

REACTOR RESERVE SHUTDOWN HO'JRS 0

0 0

720 4924.7 7913.8 7.

HOURS GENERATOR ON LINE..

8.

UNIT RESERVE SHUTDOWN HOURS..

0 0

0 9.

GROSS THERMAL ENERGY 1549867 11535935 17546816 GENERATED (MWH) 10.

GROSS ELECTRICAL ENERGY 532752 4002640 6091228 GENER ATED (MWHi 11.

LET ELECTRICAL LNERGY GENER ATED 4!y529 3701119 SN147 (MWH) 100.0 77.3 88.8 12.

KLACTOR AVAILABILIII E ACTOR ti 100.O 75.2 74.6 13.

UNIT AVAILABILITY F ACTOR C) 62.2 14.

UNIT CAPACITY F ACTOR (3) 0 5.98 7.1 15.

UNIT FORCED OUTAGE RATE (4).

16.

SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE.DATE. AND DURATION OF EACHn Refueling outane. October. 1974 1 month 17.

IF SHUT DOWN AT END OF REPORT PERIOD.ESTIMATLD DATE 01 STARTUP; 18.

UNITS IN TEST STATLS (PRIOR TO COMMERCI AL OPERATION) REPORT THE FOLLOwlNG:

DATE LAST D4TE FORECAST ACH'IEVED INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION HOURS RF. ACTOR WAS CRITICAL (1) REACTOR AVAILABILITY FACTOR HOURS th REPORTISG P1 RIOD (2)

UNIT AVAILABILITY FACTOR OR S P RTING i D

NFT Ell:CTRIC AL POWFR GF NF R ATFD (3). UNIT CAPACITY FACTOR

=

MAX.DLPENDAbLt.UAPACIT) eMwe SLTI A HOUR 5 tN REPORTING PERIOD (4)

UNIT FORCED gl]AGl'. R ATE

' HOURS GI NLR T R N LINE + FORLF D OUT AGE HOURS D

D D "T Y

~

3912040 9 2 A

.ww w

=

~

50-269 DOCKET NO.

Oconee Unit 1 UNIT October 10._1974 DATE AVERAGE DAILY UNIT POWER LEVEL MONTH september, 1974 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net)

DAY (MWe-net) 834 17 73 9 1

828 18 743 2

829 19

, g 3

709 79' 20 4

632 599 21 5

801 22 359 6

620 735 23 7

701 735 24 8

696 753 25 g

'736 26 703 10 696 702 27 11 698 28 668 12 703 29 512 13 14

. 650 30 766 382 31 15 638 16 DAILY UNTT POWER LEVEL FORM INSTRUCTIONS On 'his form, list the average daily unit power level in MWe-net for each day in the reporting month Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that by using maximu dependable capacity for the net electrical rating of the unit. there may be occasions when average power level exceeds the IUO7c line (or the restricted power level line). In such cases, average daily unit power output sheet should be footnoted to explain the apparent anomaly.

_~.

i -

=

D CKET NO. 50-269 Ocon n Unit i UNIT SHUTDOWNS UNIT N AMii 937;; october 10, 1974 REPORT MONTil September, 1974 TYPE METHOD OF F-FORCED DURATION SiluTTING 00WN NO.

DATE S SCllEDULED (HOURS)

REASON (1)

THE REACTOR (2)

CORRECTIVE ACTIONS / COMMENTS

\\

No shtitdowns during the awnth of Sei tember, 1974.

d (1) REASON (1) METilOD A-EQlllPMENT FAILURE IEXPLAIN) 1-MANUAL B-M AINT OR TEST.

2-MANUAL C-ItEl UELING SCRAM D-REGULAlORY RESTRICTION 3 - AUTOM ATIC E. OPFItATOR TRAINING AND SCRAM l

L;! LNSE EX AMINATION F-ADMINIST R AllVI.

G-OPI 11 AllON Al I RROR ll XPl.AIN)

Il-Ollli R ILXPl.AIN)

SUMMARY

f

---