Monthly Operating Rept for Sept 1974
ML19312C108
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 10/10/1974
From:
DUKE POWER CO.
To:
Shared Package
ML19312C102 List:
References
NUDOCS 7912040535
Download: ML19312C108 (1)


Text

.

/-,

Ocones Unit 2 UNIT October 10, 1974 DATE h'

DOCKET NO.

OPERATING STATUS September 1, 1974 TilROUGH September 30. 1974 1.

REPORTING PERIOD; HOURS IN REPORTING PERIOD: 720 2.

CURRENTLY AUTHORIZED POWER LEVEL ntWm.2568 MAX. DLPENDABLE CAI ACITY (M%e NET.

None 3.

LOWEST POWER LEVEL TO WHICH SPECIFIC ALL) RESTRICTED (11 ANY (MWc. NET) 4.

REASONS FOR RLSTRICTION (IF ANY):

THIS CUMULATIVE REPORTING PI RIOD YRTO DATE TO D ATE 49.0 1765.6 2423.0 5.

I!OURS REACTOR WAS CRITICAL.

6.

REACTOR RESERVE SHLTDOWN HOL RS N/3-441.4 1579.5 2092.0 7.

HOURS GENERATOR ON LINE.

8.

UNIT RESERVE SHUTDOWN HOURS..

N/A 9.

GROSS THERMAL ENERGY 941305 2817637 3420608 GENERATED (MWH) 10.

GROSS ELECTRICAL ENERGY 319752 965110 1141420 GENER ATED (MWH) 11.

NET ELECTRICAL ENERGY GENER ATED N/A (MWH)

N/A 12.

REACTOP. AVAILABILITY F ACTOR (1i N/A 13.

UNIT AVAILABILITY t ACTOR (2)

N/A 14.

UNIT CAPACITY F ACTOR (3)

N/A 15.

UNIT FORCED OUTAGE RATE (4) 16.

SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE.DATE. AND DUR ATION OF EACHr 17.

IF SHUT DOWN AT END OF REPORT PERIOD. ESTIMATED DATE 01 STARTUP:

18.

UNITS IN TEST STATUS (PRIOR TO COMMERCI AL OPERATION) REPORT THE FOLLOwlNG:

DATE LAST DkTE FORECAST ACH'IEVED 11/11/73 INITIAL CRITICALITY INITIAL ELECTRICA.

12/5/73 POWER GENERATION COMMERCIAL OPLRATION

^

(1) REACTOR AVAILABILITY FACTOR =

X 100 X 100 (2) UNIT AVAILABILITY F ACTOR HOURS IN REPORTING PI RIOD

=

('3)

(N TCAPACITY FACTOR MAX. DLPENDABLL CAPACIT) IM%c NLTD X HOURh IN RLPOR flM, PERIOD

=

(4) UNIT FORCED OUTAGE RATE HOURS G

'R TR LINE + FORCE D OUTAGE HOURS '

7912040 h w

p