ML19312C108
| ML19312C108 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 10/10/1974 |
| From: | DUKE POWER CO. |
| To: | |
| Shared Package | |
| ML19312C102 | List: |
| References | |
| NUDOCS 7912040535 | |
| Download: ML19312C108 (1) | |
Text
.
/-,
Ocones Unit 2 UNIT October 10, 1974 DATE h'
DOCKET NO.
OPERATING STATUS September 1, 1974 TilROUGH September 30. 1974 1.
REPORTING PERIOD; HOURS IN REPORTING PERIOD: 720 2.
CURRENTLY AUTHORIZED POWER LEVEL ntWm.2568 MAX. DLPENDABLE CAI ACITY (M%e NET.
None 3.
LOWEST POWER LEVEL TO WHICH SPECIFIC ALL) RESTRICTED (11 ANY (MWc. NET) 4.
REASONS FOR RLSTRICTION (IF ANY):
THIS CUMULATIVE REPORTING PI RIOD YRTO DATE TO D ATE 49.0 1765.6 2423.0 5.
I!OURS REACTOR WAS CRITICAL.
6.
REACTOR RESERVE SHLTDOWN HOL RS N/3-441.4 1579.5 2092.0 7.
HOURS GENERATOR ON LINE.
8.
UNIT RESERVE SHUTDOWN HOURS..
N/A 9.
GROSS THERMAL ENERGY 941305 2817637 3420608 GENERATED (MWH) 10.
GROSS ELECTRICAL ENERGY 319752 965110 1141420 GENER ATED (MWH) 11.
NET ELECTRICAL ENERGY GENER ATED N/A (MWH)
N/A 12.
REACTOP. AVAILABILITY F ACTOR (1i N/A 13.
UNIT AVAILABILITY t ACTOR (2)
N/A 14.
UNIT CAPACITY F ACTOR (3)
N/A 15.
UNIT FORCED OUTAGE RATE (4) 16.
SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE.DATE. AND DUR ATION OF EACHr 17.
IF SHUT DOWN AT END OF REPORT PERIOD. ESTIMATED DATE 01 STARTUP:
18.
UNITS IN TEST STATUS (PRIOR TO COMMERCI AL OPERATION) REPORT THE FOLLOwlNG:
DATE LAST DkTE FORECAST ACH'IEVED 11/11/73 INITIAL CRITICALITY INITIAL ELECTRICA.
12/5/73 POWER GENERATION COMMERCIAL OPLRATION
^
(1) REACTOR AVAILABILITY FACTOR =
X 100 X 100 (2) UNIT AVAILABILITY F ACTOR HOURS IN REPORTING PI RIOD
=
('3)
(N TCAPACITY FACTOR MAX. DLPENDABLL CAPACIT) IM%c NLTD X HOURh IN RLPOR flM, PERIOD
=
(4) UNIT FORCED OUTAGE RATE HOURS G
'R TR LINE + FORCE D OUTAGE HOURS '
7912040 h w
p