ML19309H815
| ML19309H815 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 05/08/1980 |
| From: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Hines E DETROIT EDISON CO. |
| References | |
| NUDOCS 8005190751 | |
| Download: ML19309H815 (1) | |
Text
80os28075 8
'g UNITED STATES
'n NUCLEAR REGULATORY COMMISSION EO 5.3., ' '; 8E REGION 111
^"
0,'.A 799 ROOSEVELT ROAD E
b" o
GLEN ELLYN,ILLINOls 60137
- ..+
Docket No. 50-341 0
The Detroit Edison Company ATTN:
Mr. Edward Hines, Assistant Vice President and Manager Quality Assurance 2000 Second Avenue Detroit, MI 48226 Gentlemen:
Tbc enclosed Information Notice provides early notification of an event that may have safety significance. Accordingly, you should review the Information Notice for possible applicability to your facility.
No specific action or response is requested at this time; however, con-tingent upon the results of further staff evaluation, a Bulletin or Circular recommending or requesting specific licensee actions may be issued.
If you have questions regarding this matter, please contact me.
Sincerely, fub James G. Ke'ppYef Director
Enclosure:
IE Information Notice No. 80-20 cc w/ encl:
Central Files Director, NRR/DPM Director, NRR/ DOR PDR Local PDR NSIC TIC Ronald Callen, Michigan Public Service Commission Eugene B. Thomas, Jr.,
Attorney
SSINS No.:
6870 UNITED STATES Accession No.:
NUCLEAR REGULATORY COMMISSION 8002280671 0FFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D. C. 20555 May 8, 1980 IE Information Notice 80-20 LOSS OF DECAY HEAT REMOVAL CAPABILITY AT DAVIS-BESSE UNIT 1 WHILE IN A REFUELING MODE Description of Circumstances:
On April 19, 1980, decay heat removal capability was lost at Davis-Besse Unit 1 for approximately two and one-half hours.
At the time of the event, the unit was in a refueling mode (e.g., RCS temperature was 90F; decay heat was being removed by Decay Heat Loop No. 2; the vessel head was detensioned with bolts in place; the reactor coolant level was slightly below the vessel head flanges; and the manway covers on top of the once through steam generators were removed).
(See Enclosure A, Status of Davis-Besse 1 Prior to Loss of Power to Busses E-2 and F-2 for additional details regarding this event.)
Since the plant was in a refueling mode, many systems or components were out of service for maintenance or testing purposes.
In addition, other systems and components were deactivated to preclude their inadvertent actuation while in a refueling mode.
Systems and components that were not in service or deactivated included:
Containment Spray System; High Pressure Injection System; Source Range Channel 2; j
Decay Heat Loop No. 1; Station Battery IP and 1N; Emergency Diesel-Generator No. 1; 4.16 KV Essential Switchgear Bus C1; and 13.8 KV Switchgear Bus A (this bus was energized but not aligned).
In brief, the event was due to the tripping of a non-safeguards feeder breaker in 13.8 KV Switchgear Bus B. Because of the extensive maintenance and testing activities being conducted at the time, Channels 1 and 3 of the Reactor Protec-tion System (RPS) and Safety Features Actuation System (SFAS) were being ener-gized from only one source, the source emanating from the tripped breaker.
Since the SFAS logic used at Davis-Besse is a two-out-of-four input scheme in which the loss (or actuation) of any t,:o input signals results in the actuation of all four output channels (i.e., Channels 1 and 3, and Channels loss of power to Channels 1 and 3 Channels 2 and 4.
The actuation Decay Heat Loop No. 2, the operat DUPLICATE DOCUMENT Since the initiating event was a Entire document previously were actuated (i.e., Level 1 - Hi entered into system under:
tion; Level 3 - Low Pressure Injec ANO M
A No. of pages:
/
-* +