Forwards IE Insp Rept 50-293/80-07 on 800220-22.No Noncompliance Noted
ML19309F761
Person / Time
Site: Pilgrim
Issue date: 03/17/1980
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Andognini G
BOSTON EDISON CO.
Shared Package
ML19309F762 List:
References
NUDOCS 8004300602
Download: ML19309F761 (2)


See also: IR 05000293/1980007

Text

-

.

Yh

e

/

'o

UNITED STATES

43y,youy3

8

g

NUCLEAR REGULATORY COMMISSION

gL

o

[8k $ #

n

j

REGION I

Q

631 PARK AVENUE

  • * * * * ,o#c

b

KING OF PRUSSIA, PENNSYLVANIA 19406

Wa !? %

Docket No. 50-293

,

.

Boston Edison Company M/C Nuclear

ATTN:

Mr. G. Carl Andognini, Manager

Nuclear Operations Department

800 Boylston Street

Boston, Massachusetts 02199

Gentlemen:

Subject:

Inspection No. 50-293/80-07

This refers to the inspection concheted by Mr. G. Walton of this office on

February 20-22, 1980, at Pilgrim Nuclear Power Station, Plymouth, Massachusetts

of activities authorized by NRC License No. DPR-35 and to the discussions of our

findings held by Mr. G. Walton with Mr. B. Machon of your staff at the conclu-

sion of the inspection, and to a subsequent telephone discussion between Mr. R.

Machon and Mr. G. Walton on February 25, 1980.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter.

Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations by the

inspector.

Within the scope of this inspection, no items of noncompliance were observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Ccde of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure.

Any such

application must be accompanied by an affidavit executed by the owner of the

information, which identifies the document or part sought to be withheld, and

which contains a statement of reasons which addresses with specificity the items

which will be considered by the Commission as listed in subparagraph (b) (4) of

I

Section 2.790.

The information sought to be withheld shall be incorporated as

!

far as possible into a separate part of the affidavit.

If we do not hear from

you in this regard within the specified period, the report will be placed in the

l

Public Document Room.

!

-

.-.

.

-

-

.

.

.

(

Boston Edison Company M/C Nuclear

2

i

i

.

No reply to this letter is required; however, should you have any questions

concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

!4=

.

Robert T. Carlson, Chief

~

Reactor Construction and Engineering

Support Branch

^

Enclosure:

Office of Inspection and Enforcement

Inspection Report No. 50-293/80-07

cc w/ encl:

P. J. McGuire, Pilgrim Station Manager