840 43 WO
f,
'
'
1
.
230
/
o
UNITED STATES
8
/g
NUCLEAR REGULATORY COMMISSION
.
o
$g- '
[
101 MARIETTA ST
N.W., SUITE 3100
E
j
REGION 11
o,, g
%*****p'*
ATLANTA, G EORGIA 30303
FEB 0 61930
In Reply Refer To:
RII:DRQ
50-269/79-37
50-270/79-34
50-287/79-37
Duke Power Company
ATTN:
W. O. Parker, Jr.
Vice President, Steam Production
P. O. Box 2178
Charlotte, NC 28242
Gentlemen:
This refers to the inspection conducted by D. R. Quick of this office on November 11,
15, and 16, 1979, of activities authorized by NRC Operating License Nos. DPR-38,
DPR-47 and DPR-55 for the Oconee Nuclear Station facility, and to the discussion
o
of our findings held with T. B. Owen at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
During the inspection, it was found that certain activities under your license
appear to be in noncompliance with NRC requirements. These items and references
to pertinent requirements are listed in the Notice of Violation enclosed herewith
as Appendix A.
This notice is sent to you pursuant to the provisions of Section
2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regula-
tions. Section 2.201 requires you to submit to this office, within 20 days of
your receipt of this notice, a written statement or explanation in reply including:
(1) corrective steps which have been taken by you and the results achieved; (2)
corrective steps which will be taken to avoid further noncompliance; and (3) the
date when full compliance will be achieved.
l
During the inspection it was found that certain activities under your license *
appear to deviate from commitments to the Commission and have safety significance.
This item is identified in the Notice of Deviation enclosed herewith as Appendix B.
Please provide us in writing within 20 days of your receipt of this letter your
comments including a description of corrective actions that have been or will be
taken, corrective actions which will be taken to avoid further deviations, and
the date corrective actions were or will be completed.
In accordance with Section 2.790 of the NRC's " Rules of Praci. ice," Part 2, Title
!
10, Code of Federal Regulations, a copy.of this letter
report will be placed in the NRC's Public Document Mo, and the enclosed inspection
L
om. If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure. Any such application must
- .
include a full statement of the reasons on the basis of which it is claimed that
1
-
4-
f'.
-
-
-
.
t
.
FEB o e 1953
Duke Power Company
-2-
.
the information is proprietary, and should be prepared so that proprietary infor-
mation identified in the application is contained in a separate part of the
docur4ent. If we do not hear from you in this regard within the specified period,
the report will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
[r *
R. C. Lewis, Acting Chief
Reactor Operations and Nuclear
Support Branch
Enclosures:
'
1.
Appendix A, Notice of Violation
2.
Appendix B, Notice of Deviation
3.
Inspection Report Nos. 50-269/79-37,
50-270/79-34 and 50-287/79-37
cc w/ enc 1:
J. E. Smith, Station Manager
P. O. Box 1175
Seneca, SC 29678
./-
,
.
.%
,
._
l
!
I
e