Text
3004800
h
.
.
,
[
UNITED STATES
8%
NUCLEAR REGULATORY COMMISSION
,
i Md( h[i
REGION 11
o,, Y
101 M A Rf ETTA ST
N.W., SUIT E 3100
p (/
- /
ATLANTA, GEORCIA 30303
FEB 131980
In I;eply Refer To:
RII:EHG
50-395/79-35
South Carolina Electric and Gas Company
ATTN:
M. C. Johnson, Vice President
Special Services and Purchasing
P. O. Box 764
Columbia, S C 29218
d
Gentlemen:
This refers to the investigation conducted by R. J. ifarsh of this office on
September 10 - December 19, 1979, of activities authorized by NRC Construction
Permit No. CPPR-94 for the Virgil C. Summer facility, and to the discussion of
our preliminary findings held with D. A. Nauman on December 19, 1979.
Areas examined during the investigation and our findings are discussed in the
enclosed investigation report. Within these areas, the investigation consisted
of seiective examinations of procedures and representative records, interviews
with persennel, and observations by the investigators.
Twelve new unresolved items resulted from this investigation and are discussed
-
in the enclosed report. These items will be examined during subsequent inspec-
tions.
During the investigation, it was found that certain activities under your license
appear to be in noncompliance with NRC requirements. These items and references
to pertinent requirements are listed in the Notice of Violation enclosed herewith
as Appendix A.
This notice is sent to you pursuant to the provisions of Section
2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regula-
tions. Section 2.201 requires you to submit to this office, within 20 days of
your receipt of this notice, a written statement or explanation in reply including:
,
(1) corrective steps which have been taken by you and the results achieved; (2)
corrective steps which will be taken to avoid further noncompliance; and (3) the
date when full compliance will be achieved.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
,
investigation report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold such information from public disclosure. Any such
application must include a full statement of the reasons on the basis of which
-
it is claimed that the information is proprietary, and should be prepared so
'
that proprietary information identified in the application is contained in a
'
separate part of the document.
If we do not hear from you in this regard within
',
the specified period, the report will be placed in the Public Document Room.
6
'
,
.
)
- 5
-
<
._
o
.
.
South Carolina Electric and Gas
-2-
IEE 12193C
Company
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
4.f/^ +
$ James P. ' ' eT
Director
!nclosures:
Appendix A, Notice of Violation
Investigation Report No. 50-395/79-35
.
. w/ enc 1:
. B. Conners, Jr.
Conners, Moore and Corber
1747 Pennsylvania Avenue, N. W.
Washington, D C 20006
A. A. Smith
Quality Assurance
,
P. O. Box 8
Jenkinsville, S C 29065
O. S. Bradham, Manager
Nuclear Operations
P. O. Box 8
Jenkinsville, S C 29065
l
..