ML19309E809

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-491/80-03,50-492/80-03 & 50-493/80-03 on 800303-05.No Noncompliance Noted
ML19309E809
Person / Time
Site: Cherokee  Duke Energy icon.png
Issue date: 03/20/1980
From: Bryant J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Dail L
DUKE POWER CO.
Shared Package
ML19309E807 List:
References
NUDOCS 8004240430
Download: ML19309E809 (2)


See also: IR 05000491/1980003

Text

=

.

o

O

  1. '%>

" " ' ' " ' ' ^ ' ' '

p

J';,

NUCLEAR REGULATORY COMMISSION

i

I

<

o

REGION 11

101 MARIETTA ST., N.W., SUITE 3100

j

ATLANTA, GEORGIA 30303

" * * *

MAR 2 01980

In Reply Refer To:

.

.

RII:JJL

50-491/80-03

50-492/80-03

50-493/80-03

-

Duke Power Company

ATTN:

L. C. Dail, Vice President

Design Engineering

'

P. O. Box 33189

Charlotte, NC 28242

Gentlemen:

This refers to the inspection conducted by J. J. Lenahan of this office on

i

March 3-5, 1980 of activities authorized by NRC Construction Permit Nos. CPPR-167,

t

CPPR-168, and CPPR-169 for the Cherokee Nuclear Station facility, and to the

discussion of our findings held with C. B. Aycock at the conclusion of the

inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

i

Within the scope of this inspection, no items of noncompliance were disclosed. '

We have examined actions you have taken with regard to previously identified

enforcement matters. These are discussed in the enclosed inspection report.

One new unresolved item resulted from this inspection and is discussed in the

enclosed report. This item will be examined during subsequent inspections.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

'

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary infor-

nation identified in the application is contained in a separate part of the

document.

If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

8004249

Yk

(

.

'

MAR 2 01980

g

Duke Power Company

-2-

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

.

.

Sincerely,

-m

r J. C. fryan't,' Acting Chief

'

Reactor Construction and Engineering

Support Branch

Enclosure:

Inspection Report Nos. 50-491/80-03

50-492/80-03 and 50-493/80-03

cc w/ encl:

J. T. Moore, Project Manager

P. O. Box 422

Gaffney, SC 29340

.?

1

I

'

.

l

,

1

.