IE Insp Repts 50-491/80-03,50-492/80-03 & 50-493/80-03 on 800303-05.No Noncompliance Noted.Major Areas Inspected: Structural Concrete & Steel QA & Qc;Settlement Monitoring Program
ML19309E812
Person / Time
Site: Cherokee  Duke Energy icon.png
Issue date: 03/19/1980
From: Conlon T, Lenahan J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML19309E807 List:
References
50-491-80-03, 50-491-80-3, 50-492-80-03, 50-492-80-3, 50-493-80-03, NUDOCS 8004240434
Download: ML19309E812 (5)


Text

'

'

UNITED STATES

'l k

E NUCLEAR REGULATORY COMMISSION J'

REGION 11

\\

k

[

_

101 MARIETTA ST., N.W., sulTE 3100 ATLANTA, GEORGIA 30303

Report Nos. 50-491/80-03, 50-492/80-03 and 50-493/80-03

.

Licensee: Duke Power Company 422 South Church Street Charlotte, NC 28242 Facility Name:

Cherokee Nuclear Station Docket Nos. 50-491, 50-492, 50-493 License Nos. CPPR-167, CPPR-168 and CPPR-169 Inspection at Cherokee site near Gaffney, South Carolina Inspector:

f d

3////fo J. f.0Lenahan Date Signed Approved

M 8] -/7- [O T. E.'Conlon! Section Chief, RCES Branch

~Date Signed SUMMARY Inspection on March 3-5, 1980 Areas Inspected This routine, unannounced inspection involved 14 inspector-hours on site in the areas of structural concrete QA/QC controls, structural steel and supports QA/QC controls and quality records, settlement monitoring program for safety-related structures, and licensee action on previous inspection findings.

Results Of the four areas inspected, no items of noncompliance or deviations were identified.

._

__

8004240

'

.

\\

DETAILS

...

1.

Persons Contacted Licensee Employees

  • C. B. Aycock, Project Engineer
  • J. W. Willis, Senior QA Engineer A. R. Hollins, Senior QC Engineer B. R. Justice, QA Engineer W. H. Linsey, Geotechnical Engineer
  • K. W. Schmidt, QA Engineer
  • G. Williams, Layout Supervisor
  • Attended exit interview

!

2.

Exit Interview The inspection scope and findings were summarized on March 5, 1980 with those persons indicated in Paragraph I above.

3.

Licensee Action on Previous Inspection Findings (Closed) Noncompliance 491/79-14-01, 492/79-14-01, and 493/79-14-01:

a.

Improper curing of concrete cylinders in the concrete laboratory. The inspector examined the curing room in the concrete laboratory. Addition-al fog spray nozzles have been installed to insure that all areas of

.

'

the curing room are kept moist.

In addition, laboratory personnel check the spray nozzles daily to verify they are functioning properly.

The inspector reviewed the results of unconfined compression tests performed on cylinders from pour numbers 691 through 696 (this non-compliance was issued for failure to properly cure these cylinders).

The test results met the design requirements. This item is closed.

b.

(Closed) Noncompliance 491/79-20-01, 492/79-20-01, and 493/79-20-01:

Sampling and testing of concrete aggregate. The inspector reviewed

'

NCI 1119 which was written by the licensee to document and resolve the i

missing tests. This NCI was closed out after test results from aggre-i gate sampled on November 28, 1979 complied with the specification requirement. The inspector examined the computerized " Tickler" system which will notify QA/QC personnel when periodic testing of concrete materials is required. This item is closed.

4.

Unresolved Items Unresolved items are matters about which more information is required to determine whether they are acceptable or may involve noncompliance or deviations. New unresolved items identified during this inspection are discussed in paragraph 5.

.

.

-

(

-

.

.

\\

-2-5.

Independent Inspection Effort

..

The inspector examined the following areas:

a.

Construction status

!

b.

Soils and concrete laboratory and currentness of calibration of

'

laboratory equipment L

QC inspection records for hanger number 1-A-RN-4015 c.

d.

Specification CKS-1196.02-00-0001, RO, " Specification for Design of Concrete Expansion Anchors", specification CKS-1196-02-00-0002, R1,

" Specification for the Installation and Inspection of Concrete Expansion Anchors", procedure number CKB-51, R1, " Concrete Expansion Anchor Installation", and procedure number M-52, " Concrete Expansion Anchor Installation Inspection" Calibration records of moisture tellers for months of November, 1979 e.

through February, 1980, and of the Universal testing machine for the year 1979 f.

Settlement survey monitoring program for safety related structures.

Examination of the settlement survey program disclosed the following unre-solved item: PSAR commitments require the licensee to perform settlement monitoring of safety-related structures by use of precise survey methods throughout and following construction. The inspector reviewed field books containing the results of settlement surveys performed on the NSW pump structure and the NSW intake structure. The inspector interviewed the layout personnel performing the surveys concerning survey techniques, type survey equipment used for the surveys, and errors of closure in the survey loops. These interviews and review of the field books disclosed that the records of the survey loop closures are not being maintained by the licensee as quality records though the records may be available in personnel notebooks kept by the layout personnel performing the surveys. The survey loop closure records provide verification that precise survey methods were employed in the settlement survey.

In addition, discussions with responsible engineers disclosed that settlement surveys have not been initiated on the reactor and auxiliary buidlings. The licensee's intent is to install settlement monuments on these structures when construction is up to yard grade elevation. These apparent conflicts with PSAR commitments were identified to the licensee as Unresolved Item 491/80-03-01, 492/80-03-01, and 493/80-03-01, " Settlement monitoring program", pending further evaluation by NRC.

No deviations or items of noncompliance were identified, l

_

- _ - -

(

.

.

\\

-3-6.

Containment (Structural Concrete) - Review of Quality Assurance Implementing Procedures - Units 1, 2 and 3

'

The inspector performed a follow-up inspection of QA-QC controls for contain-ment structural concrete. The following procedure were examined to determine if work activities and quality control and quality assurance functions were provided for as stipulated in NRC requirements and PSAR Section 3.8.1.6:

Specification number P81S-1109.00-00-0001, Revision (R) 11, a.

" Specification for Concrete for Category I Structures" b.

Specification number CKS-1162.00-00-0001, R4, " Reinforcing Steel" Procedure CKB-57, R1, " Batching, Mixing, Sampling and Testing Concrete c.

Containing Helment Admixture" d.

Procedure CKB-26, R3, " Honeycomb Repair" Procedure CKB-28, R1, " Cold Joint Repair" e.

f.

Procedure CKB-53, R1 " Core Drilling in Design and Fill Concrete" g.

Procedure CKB-64, R0, " Cold Weather Concrete Practices" h.

Procedure CKK-10, R0, " Calibration of the Universal Testing Machine" No deviations or items of noncompliance were identified.

7.

Safety-Related Structures (Structural Steel and Supports) - Review of Quality Assurance Implementing Procedures - Units 1, 2 and 3 The inspector performed a follow-up inspection of QA/QC controls for struc-tural steel erection. The following procedures and specifications were examined to determine if work activities and quality control and quality assurance functions were provided for as stipulated in NRC requirements and PSAR Section 3.8.1.6:

I

,

Specification number P81S-1121.00-00-0001, Revision (R) 0, " Specification a.

for Field Fabrication of Miscellaneous Steel for Category 1 Structures"

,

l b.

Procedure M-18, R5, " Inspection of Structural Steel Erection" c.

Procedure M-30, R7, " Documentation of Miscellaneous NDE" d.

Procedure M-33, R0, " Inspection of Mechanical and Physical Testing of Metal for Conformance to Purchase Specifications" i

N

_

_ _ _ _ _ _ _ _ _ _ _ _

?

-

.

-4-

,t Procedure CKD-15, R2, "T)rque Requirements for Bolted Mechanie:a1 e.

Joints"

  • .

f.

Procedure CKK-29, R1, " Calibration of Torque Wrenches" No deviations or items of noncompliance were identified.

8.

Safety-Related Structures (Structural Steel & Supports) - Review of Quality Records Units 1, 2 and 3 The inspector examined quality records relating to erection of structrual steel supports for the elevation 565.0 and elevation 583.0 grating floors in NSW pump structures A and B Records examined were as follows:

l Structural steel erection inspection reports a.

b.

Nonconforming item report number NCI 699 Training records of the structural steel QC inspector who performed c.

the QC inspection l

d.

Calibration record of torque wrench number CKTW 006 The inspector also examined certified material test reports for W12 x 65 shapes, heat numbers 170 C981 and 173 C146, and W8 x 67 shapes, heat number 182 C933.

Acceptance criteria examined by the inspector are those procedures listed in paragraph 7 and drawing numbers CK 0352-02, CK 0352 05, and CK 0352-10.

No deviations or items of noncompliance were identified.

'

.

.