Forwards IE Insp Rept 50-293/80-02 on 800117-18.No Noncompliance Noted
ML19309B930
Person / Time
Site: Pilgrim
Issue date: 02/05/1980
From: Galen Smith
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Andognini G
BOSTON EDISON CO.
Shared Package
ML19309B931 List:
References
NUDOCS 8004070354
Download: ML19309B930 (2)


See also: IR 05000293/1980002

Text

.

"

.*

yp

UNITE 3 5TATES

[pa stooq$

NUCLEAR REGULATORY COMMISslON

[

M EolON I

n

!!

g

s30 PARK AVENUE

f

KING OF PRUSSI A. PENNSYLVANIA 19408

%,,.....,/

Docket No. 50-293

FL1 3 UM

Boston Edison Company M/C Nuclear

ATTN: Mr. G. Carl Andognini, Manager

Nuclear Operations Department

800 Boylston Street

Boston, Massachusetts

02199

Gentlemen:

Subject:

Inspection No. 50-293/80-02

This refers to the inspection conducted by Mr. p. Clemons of this office on

January 17-18, 1980, at Plymouth, Massachusetts of activities authorized by NRC

License No. OPR-35 and to the discussions of our findings held by Mr. Clemons

with Mr. McGuire and other members of your staff at the conclusion of the

inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter.

Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, measurements made by the

inspector, and observations by the inspector.

'

Within the scope of this inspection, no items of noncompliance were observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any infomation that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such infonnation from public disclosure.

Any such

application must be accompanied by an affidavit executed by the owner of the

information, which identifies the document or part sought to be withheld, and

which contains a statement of reasons which addresses with specificity the items

which will be considered by the Commission as listed in subparagraph (b) (4) of

!

Section 2.790.

The information sought to be withheld shall be incorporated as

far as possible into a separate part of the affidavit.

If we do not hear from

you in this regard within the specified period, the report will be placed in

the Public Document Room.

R 0 04 07035j

,

__

_ _ _ _ _

-_-___

- - - - - _ - - - _

w

Boston Edison Company M/C Nuclear

2

FE3 5 UM

No reply to this letter is required; however, should you have any questions

concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

.

.,

'

'/c

iga, ,:

sw %

GeorgeI. Smith, Chief

Fuel Facility and Materials Safety

Branch

!

Enclosure:

Office of Inspection and Enforcement

!

Inspection Report No. 50-293/80-02