ML19309B930
| ML19309B930 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 02/05/1980 |
| From: | Galen Smith NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Andognini G BOSTON EDISON CO. |
| Shared Package | |
| ML19309B931 | List: |
| References | |
| NUDOCS 8004070354 | |
| Download: ML19309B930 (2) | |
See also: IR 05000293/1980002
Text
.
"
.*
yp
UNITE 3 5TATES
[pa stooq$
NUCLEAR REGULATORY COMMISslON
[
M EolON I
n
!!
g
s30 PARK AVENUE
f
KING OF PRUSSI A. PENNSYLVANIA 19408
%,,.....,/
Docket No. 50-293
FL1 3 UM
Boston Edison Company M/C Nuclear
ATTN: Mr. G. Carl Andognini, Manager
Nuclear Operations Department
800 Boylston Street
Boston, Massachusetts
02199
Gentlemen:
Subject:
Inspection No. 50-293/80-02
This refers to the inspection conducted by Mr. p. Clemons of this office on
January 17-18, 1980, at Plymouth, Massachusetts of activities authorized by NRC
License No. OPR-35 and to the discussions of our findings held by Mr. Clemons
with Mr. McGuire and other members of your staff at the conclusion of the
inspection.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, measurements made by the
inspector, and observations by the inspector.
'
Within the scope of this inspection, no items of noncompliance were observed.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any infomation that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold such infonnation from public disclosure.
Any such
application must be accompanied by an affidavit executed by the owner of the
information, which identifies the document or part sought to be withheld, and
which contains a statement of reasons which addresses with specificity the items
which will be considered by the Commission as listed in subparagraph (b) (4) of
!
Section 2.790.
The information sought to be withheld shall be incorporated as
far as possible into a separate part of the affidavit.
If we do not hear from
you in this regard within the specified period, the report will be placed in
the Public Document Room.
R 0 04 07035j
,
__
_ _ _ _ _
-_-___
- - - - - _ - - - _
w
Boston Edison Company M/C Nuclear
2
FE3 5 UM
No reply to this letter is required; however, should you have any questions
concerning this inspection, we will be pleased to discuss them with you.
Sincerely,
.
.,
'
'/c
iga, ,:
- sw %
GeorgeI. Smith, Chief
Fuel Facility and Materials Safety
Branch
!
Enclosure:
Office of Inspection and Enforcement
!
Inspection Report No. 50-293/80-02
I
cc w/ enc 1:
P. J. McGuire, Pilgrim Station Manager
l
i
. , - - ,