Forwards IE Insp Repts 50-245/79-25 & 50-336/79-27 on 791105-09 & Notice of Violation
ML19309B820
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 01/11/1980
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Counsil W
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML19309B813 List:
References
NUDOCS 8004070223
Download: ML19309B820 (2)


See also: IR 05000245/1979025

Text

..

--

s.

_g

.

. * -

UNITE 3 STATES

.

Lag _

s !

[

-

4{

'

NUCLEAR REGULATORY COMMISslON

.\\

REGION I

I. y ~

-l

'*

.

631 PARK AVENUE

f

KING OF PRUSSIA. PENN5YLVANIA 19406

^

.l.

.....

JM 111980

Docket Nos. 50-245

50-336

Northeast Nuclear Energy Company

ATTN:

Mr. W. G. Counsil

Vice' President - Nuclear

Engineering and Operations

P. O. Box 270

. Hartford, Connecticut 06101

Gentlemen:

Subject:

Combined Inspection 50-245/79-25 and 50-336/79-27

This refers to the inspection conducted by Mr. P. Koltay of this office

on November 5-9, 1979 at Millstone Nuclear Power Station Units 1 and 2

Waterford, Connecticut of activities authorized by NRC License No. DPR-

21 and DPR-65 and to the discussions of our findings held by Mr. P.

Koltay with Messrs. J. Opeka, R. Herbert, E. Farrel and other members of

your. staff at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of

Inspection and Enforcement Inspection Report which is enclosed with this

letter. Within these areas, the inspection consisted of selective

examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Based on the resuits of this inspection, it appears that one of your

activities was not conducted in full compliance with NRC requirements,

as set forth in the Notice of Violation, enclosed herewith as Appendix

A.

This item of noncompliance has been categorized into the levels as

described.in our correspondence to you dated December 31, 1974.

This

notice is sent to you pursuant- to the provistor,s of Section 2.201 of the

NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.

Section 2.201 requires you to submit to this office, within twenty (20)

days of your receipt of this notice, a written statement or explanation

in reply including:

(1) corrective steps which have been taken by you

and the results achieved; (2) corrective steps which will be taken to

avoid further items -af noncompliance; and (3) the date when full compliance

will be achieved.

l

80040707&3

.

.

_

. . .

. _ .

- _ _ .

_ _ _

-

-.

- _ _ - _ _ - .

. _ _ _ _ _ _

_ - _ _

_ - _ _ _ _ _ _

- _ _ _ _ _ _ _ _ _

-

r

.c

. Northeast Nuclear. EnergyL Company _

2

In accordance with Section 2.790 of-the NRC's " Rules of Practice," Part

2. Title 10, Code of Federal Regulations, a copy of this letter and the

enclosures will be placed in the NRC's Public Document Room.

If this

-report contains any information that you (or your contractor) believe to

be proprietary, it is necessary that you make a written application

within 20 days to this office to. withhold such information from public

disclosure. Any such application must be accompanied by an affidavit

executed by the owner of the information, which identifies the document

or part sought to be withheld, and which contains a statement of reasons

which addresses with specificity the items which will be considered by

the Comission as listed in subparagraph (b) (4) of Section 2.790. The

information sought to be withheld shall be incorporated as far as possible

into a separate part of the affidavit.

If we do not hear from you in

~

this regard within the specified period, the report will be placed in

the Public Document Room.

Should you have any questions concerning this inspection, we will be

pleased to discuss them with you.

Sincerely,

g

-

..

-

,

Robert T. Carlson, Chief

Reactor Construction and Engineering

Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Office of Inspection and Enforcement Inspection

Report Numbers 50-245/79-25; 50-336/79-27

cc w/encls:

J. F.'Opeka, Station Superintendent

D. G. Diedrick, Manager of Quality Assurance

J. F. Himelwright, Licensing Safeguards Engineer