Forwards IE Insp Rept 50-483/79-16 on 791203-21 & Notice of Violation
ML19309B341
Person / Time
Site: Callaway Ameren icon.png
Issue date: 02/12/1980
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Bryan J
UNION ELECTRIC CO.
Shared Package
ML19309B342 List:
References
NUDOCS 8004040060
Download: ML19309B341 (2)


See also: IR 05000483/1979016

Text

  1. f

'o

UNITED STATES

TIQ

'8

NUCLEAR REGULATORY COMMISSION

o

M

E

REGION 111

h,

[

700 ROOSEVELT ROAD

g

,o

GLEN ELLYN. ILUNOIS 60W

f

  • ....

FEB 121980

Docket No. 50-483

Union Electric Company

ATTN:

Mr. John K. Bryan

Vice President - Nuclear

Post Office Box 149

St. Louis, MO 63166

Gentlemen:

This refers to the inspection conducted by Mr. W. A. llansen of this office

during the period of December 3-21, 1979, of activities at the Callaway,

Unit 1, construction site authorized by NRC Constructin Permit No. CPPR-139

and to the discussion of our findings with Mr. Weber and others of the

Callaway staf f at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection consisted of a

selective examination of procedures and representative records, observa-

tions, and interviews with personnel.

During this inspection, certain of your activities appeared to be in non-

compliance with NRC requirements, as described in the enclosed Appendix A.

The inspection showed that action had been taken to correct the identified

noncompliance and to prevent recurrence.

Consequently, no reply to this

noncompliance is required and we have no further questions regarding this

matter at this time.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room, except as follows.

If this report contains information that you me

your contractors believe to be proprietary, you must apply in writing to

this office, within twenty days of your receipt of this letter, to with-

hold such information from public disclosure. The application must in-

clude a full statement of the reasons for which the information is con-

sidered proprietary, and should be prepared so that proprietary informa-

tion identified in the application is contained in an enclosure to the

application.

I

800404o060

f.

.

f

Union Electric Company

-2-

,

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

A

G. Fiorelli, Chief

Reactor Construction and

Engineering Support Branch

Enclosures:

1.

Appendix A, Notice of

Violation

2.

IE Inspection Report

No. 50-483/79-16

(

cc w/encls:

Mr. W. H. Weber, Manager

Nuclear Construction

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

Regions I & iv

Ms. K. Drey

Mr. Ronald Fluegge, Utility

Division, Missouri Public

Service Commission

.

.

1

l