- f
'o
UNITED STATES
TIQ
'8
NUCLEAR REGULATORY COMMISSION
o
M
E
REGION 111
h,
[
700 ROOSEVELT ROAD
g
,o
GLEN ELLYN. ILUNOIS 60W
f
- ....
FEB 121980
Docket No. 50-483
Union Electric Company
ATTN:
Mr. John K. Bryan
Vice President - Nuclear
Post Office Box 149
St. Louis, MO 63166
Gentlemen:
This refers to the inspection conducted by Mr. W. A. llansen of this office
during the period of December 3-21, 1979, of activities at the Callaway,
Unit 1, construction site authorized by NRC Constructin Permit No. CPPR-139
and to the discussion of our findings with Mr. Weber and others of the
Callaway staf f at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined
during the inspection. Within these areas, the inspection consisted of a
selective examination of procedures and representative records, observa-
tions, and interviews with personnel.
During this inspection, certain of your activities appeared to be in non-
compliance with NRC requirements, as described in the enclosed Appendix A.
The inspection showed that action had been taken to correct the identified
noncompliance and to prevent recurrence.
Consequently, no reply to this
noncompliance is required and we have no further questions regarding this
matter at this time.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part
2, Title 10, Code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the NRC's Public Document
Room, except as follows.
If this report contains information that you me
your contractors believe to be proprietary, you must apply in writing to
this office, within twenty days of your receipt of this letter, to with-
hold such information from public disclosure. The application must in-
clude a full statement of the reasons for which the information is con-
sidered proprietary, and should be prepared so that proprietary informa-
tion identified in the application is contained in an enclosure to the
application.
I
800404o060
f.
.
f
Union Electric Company
-2-
,
We will gladly discuss any questions you have concerning this
inspection.
Sincerely,
A
G. Fiorelli, Chief
Reactor Construction and
Engineering Support Branch
Enclosures:
1.
Appendix A, Notice of
Violation
2.
IE Inspection Report
No. 50-483/79-16
(
cc w/encls:
Mr. W. H. Weber, Manager
Nuclear Construction
Central Files
Reproduction Unit NRC 20b
Local PDR
Regions I & iv
Ms. K. Drey
Mr. Ronald Fluegge, Utility
Division, Missouri Public
Service Commission
.
.
1
l