05000324/LER-1980-038-03, /03L-0:on 800229,while Terminating Wire to Contact 3 on Relay 52AX,recirculation Pump M/G Set Tripped.Caused by de-energizing of Relay When Connection Was Made for Safety. Special Procedure Was Revised & Test Sucessfully Com

From kanterella
(Redirected from ML19309A841)
Jump to navigation Jump to search
/03L-0:on 800229,while Terminating Wire to Contact 3 on Relay 52AX,recirculation Pump M/G Set Tripped.Caused by de-energizing of Relay When Connection Was Made for Safety. Special Procedure Was Revised & Test Sucessfully Completed
ML19309A841
Person / Time
Site: Brunswick 
Issue date: 03/27/1980
From: Tollison A
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19309A833 List:
References
LER-80-038-03L, LER-80-38-3L, NUDOCS 8004010400
Download: ML19309A841 (2)


LER-1980-038, /03L-0:on 800229,while Terminating Wire to Contact 3 on Relay 52AX,recirculation Pump M/G Set Tripped.Caused by de-energizing of Relay When Connection Was Made for Safety. Special Procedure Was Revised & Test Sucessfully Completed
Event date:
Report date:
3241980038R03 - NRC Website

text

cnc eoRm as 17 77) f y a

LICENSEE EVENT REPORT v

CONTROL BLOCK: l

  • l l

l l

l l

(PLE ASE PRINT OR TYPE ALL REQUIRED INFORMATION)

I 6

l N l C l B l E lP l 2 l@l 0 l0 l -l 0l 0l 0l 0l 0l -l 0l 0l@l 4 l 1l 1l 1l 1l@l l

l@

o i I

8 9 LICENSEE CODE 14 15 UCEN5E NUMSER JS 26 LICENSE TYPE J0 SJ CAI bd CON'T QU l Ll@l Ol s l0 l-l0 l 3l 2l 4 l@l0 12 12 l 9l 8l Ol@l 013 l2 l7 l Al ol@

o i 7

8 60 68 DOCKET NUM9ER bd 69 EVENT DATE 74 FS REPORT D AT E 80 g

EVENT DESCRIPTION AND PROB ABLE CONSEQUENCES h 2 l While terminating a wire to contact 3 on relav 52AX In the 2A renctnr recircnineinn l

[ O j 3 l l pump trip breaker compartment P65, the recirculation pump M/G set trinned. The lend I

gwas being connected in preparation to perform Special Test 79-24, Reactor Recirculatiot1 o,

g g ump Trip Test.

l P

0 6 l

O 7 l l

Technical Specifications 3.4.1, 6.9.1.9b l

o ig i g 80 7

8 9 DE CODE SUSCO E COMPONENT CODE SUSCOD'E SU DE g

lC lB l@ g@ ]@ l C l K] T l B l K l R l@ y@ lZ l @

7 8

9 10 11 12 13 18 19 20 SE QUE NTI AL OCCUR R E NCE REPORT REVISION EVENT YE AR REPOR T NO.

COCE TYPE N O.

h "L E R 'Rol218l0l

[---J l0l3181 l/l lo la l (L_j l-l [q,j guy t

22 2J 24 26 27 28 29 30 Ji 32 K N ACT N ON PL NT MET HOURS S B IT FOR b S.

SUPPLIE MAN FACTURER (G_j@l Gl@

l B l@

l Z l@

l0l0l0l11

['f(j @

[,y_j@

lNl@

lCl0l8l0l@

3J 34 33 36 31 40 41 42 43 de 47 CAUSE DESCRIPTIOPI AN'O CORRECTIVE ACTIONS h g lThe wire was removed and the puro succest'ully restarted.

An investigatinn determined l l l3j lthat the relay, deenergi::cd when the connection was made for safetv. would have to be I genergized during this connection to avoid tripping the M/G set.

The special procedure I g lwas revised as such and the test was successfully completed.

l l

LL.L4_I I 80 7

8 9 ST US

% POWER OTHERSTATUS OtSCO RV OISCOVERY DESCRIPTION NA l W @l Special Test l

W@ l 0l 6 l 5 l@l i s

' CTiviTY COOTENT LOCATION OF RELE ASE @

A 35 Rett AsEO OP RELE ASE AMOUNT OF ACTivlTY A l l NA l

(.Z] @ l Zlgl i G 7

8 9 _

30 ii A4 4s 80 PERSONNEL EXPOSURES NUMBER TYPF @lOESCRtPTION Zl NA l

l0l0l0l@l i 7

,E R50~ ~ El'i~,UR, E S oESCn PnO~@

~ue.E R NA l

10l0l01@l i s 80 7

8 9 11 12 LOSS OF OH OAMAGE TO FACILITY TYPE DE SC RIP TION NA l

@ gl i 9 80 7

8 9 10 h, ED@ DESCRIPTION ISS l

NA l

lllllllllllll; 2 o e.

80..

son, h. 8 0 0 4 010 g

,0

,ggy,;

939 457_9521 2,

A.

o NAME OF PREPARER

i LER ATTACHMENT -- RO# 2-80-38 g Facility:

BSEP Unit i 2 Event Date 2-29-30 The circuit affected is part of the trip circuit for the 2A M/G set.

When the recirculation pump trip breaker opens, the 52AX relay is deenergized, thus trip-

~

ping the M/G set breaker. Power to the 52AX relay logic was off, for personnel safety, when the' relay was connected to the trip logic, thus giving a false indication that the pump trip breaker had. opened, and tripping the M/G set breaker.

A temporary revision to the special test procedure was incorporated so that the test could be completed. A permanent revision will be incorporated to ensure that the 52AX relay is energized for future testing.