ML19308D741
| ML19308D741 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 07/07/1972 |
| From: | Rodgers J FLORIDA POWER CORP. |
| To: | Jennifer Davis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML19308D738 | List: |
| References | |
| NUDOCS 8003120907 | |
| Download: ML19308D741 (2) | |
Text
,
(Y 5FA
,n.6. A. e.. e..
F L O It I :lt - P O W E lr T C o ll P 0 H AT I
.i
\\f L14.EE. R sr.me,soyoo7.2gymo,ox
_ AN TA. G A.
A 8 08 kVl(
July 7, 1972 United States Atomic Energy Commission Directe ate of Regulatory Operations Region II 230 Peacatree Street, N.W.
Atlanta, Georgia 30?J3 2
Attention:
Mr. John G. Davis Director
Subject:
AEC Communication RO:II:JGD 50-302 June 28, 1972 4
Dear Mr. Davis:
In response to your letter regarding the effect of the recent flooding conditions, we wish to advise you that there was no damage of any de-gree to any safety related structures, systems, components or materials s,
at the Crystal River Plant Site. In addition, none of the design bases used in our safety evaluation were exceeded.
To the best of our knowledge none of the equipment, components or materials to be. used at the Crystal River Site, presently located at vendors' facilities, were subject to significant damage.
I hope that this information is sufficient to provide you with the data you need.
Very truly yours, J. T. Rodgers Asst. Vice President JTR:mg e
O d
~
8003120 fC p
'^_'
T*
v c,
p
m U'
Ltr fm Florida Power Corporation re flooding conditions, dtd 7/7/72 DISTRIBUTION:
J. G. Keppler, RO J. B. Henderson, RO RO Office of Operations Evaluation RO AD for Procedures RO AD for Inspection & Enforcement L, DD for ea
Lj
- m me
-mem,
-