Discusses IE Insp Rept 50-302/73-11 on 731024-26 Re Review of Const Procedures & QA Program.No Noncompliance Noted
ML19308D683
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 11/05/1973
From: Beratan L
US ATOMIC ENERGY COMMISSION (AEC)
To: Keinmuth G
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML19308D679 List:
References
NUDOCS 8003120796
Download: ML19308D683 (2)


Text

m

- m O

~

s,

\\

\\

s

.M*

,.g4 5

~

I^O D

D

&hQ S?<f-V V

t G. W. Reinanth, Chief, Technical Assistance Branch, m T?'OI';?: I:iSP1:OtIO" - W)HDA N.Et C0'J02iTION - C2TSTAL RIVUA III D'3C.C :10..i.:- 'm Cn Cc:o;ar 2/. 2.:. l'?!3 I :te: c- >nnied U. ?. :. ran en en !".wni $n to Le C-/n t r '_ r;'-r :-

t*~ h "n.

3 facility.

.'::au:: cf : a sttilat**~

4-

'd-ef t t c. tr:-1:n int.: c: C_j f ul '.iv ar 1 ci 2.:rso Mtic Island, I van rue;u.:r;.ai to rm.r.1 cne cor:- uction ;.r..cacar:s a w t..2 QA proar:rn for tite co atruct.ica of t.;2 m;; girl.:r.

T.ac cajactive of tac insmetion was to co. firm thnt cppropri:ita construction pr:ctices vare used to preve.it th:. Icr nti:2 Of 7: ids.in c.

c..crata in cri.ci.11 are a cf the ring ;-ircer, i.:... Sc;inc t!.a hearir.s plates sne ia ether arcio cc ':ested by a large.==her of rainforcin; bars.

The rin.: 31rder 1: 17'-6" hi -h :nd is being poured in cix lif ts and v}

in ci :t, d: Tac scy:. uts.

t.: 6: ti. a of tSc ir. p accios, tua three botton lift! had bcca pour.a.d (the battuu tcn fcat). Preparation for the fourth li::t ;c3 undotvay durin;- cl.a i.::ccrion. To face.12.tnte the placina, of cencretc in the enusrrictac anacca of tte ring afrder, a crecial concretc =t:t was being used. The ua:cinum anaregate size was li'..itad to 1/2 inch c d the cencreto alu-o to four iaches.

Picni;: lass vindows ' arc incert:.d in the sucel forts at the location of the bearing pistes to alicu the quality Control (CO) 'copla to observe ths pincer:ent of the concretc in critical arecs.

Tae Quality Assurance (RA) records for the first t*u ce lifts were audited and the fo11:: vin 3 itc=s vore noted as being cuts sadf:ta:

1.

The specifiestions requires that arc ey 5.2 placad on the curf 02 of the oldar c ncrete 5efore a lif t of fre3h concrets is nIa. ei upon it.

T.'c r.a sired ?.3 drr stre :ath of the con: rate' '.: 3 0" ' a i and the cubc =trcnP,th of the epo:cy is required to be 8000pni. The QA records re n.a1 that it was n.fficult to attain the 600^791 specified in the specificisticas. Most of the taat result;. sera in the ran:;a of 7350 psi. A racolution of this problem was colayin?,

tha pouring of additonal concreta.

~

2 l* -

l fm\\

d

Ns/

6 y

,3 a

8003120,f

WIH MH

~

~

o NOBOLL Y

G. ii. Rainmuth.

'la vera informed that an engineering disposition of this ornbic.

' tad boca made by Gilbert Associatas.

The disposition was re cruce to ;,ny t.ast the cpoxy was not recuired to ha any strue.er taan cae concreto.

Suppcrting docurentation vill be a ra11able for-tha inspector to review at the next regular inspection of this facility.

2.

Ic was Ecuad t':st UC.it 511 dated Septand2cr 13,1973 has not been clocad cuc.

It :::s c1M =ed by tite Q.L nerso: mal at tite site that an en?ina. :rir.3 Emeniti:r. had

  • a ~. -i.
  • a.

t.

nCa rioce::.cn: t. ion hc.i no; y.::

nu rae.:.1w.

Ihia 2.ta:a all be r.mc red at cite l

r.m re ular ins; ection of this facility.

If t*.; cara and control e=ercised by the licensee in the. pourin-of ena first :arca lifts of the ring girder continues no construction anc....11cs nLould be esperienced.

) M). U *

/ 14 1 L. L. Borstan Sanier Structural Eri w Technical Assistance 3 ranch, RO l

i e

o i

i 1

I o

RO:TAS i

9

/1 LL3eratan:arj 11/5/73

~