Forwards IE Insp Rept 50-302/73-11 on 731024-26.No Noncompliance Noted
ML19308D680
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 11/16/1973
From: Moseley N
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Rodgers J
FLORIDA POWER CORP.
Shared Package
ML19308D679 List:
References
NUDOCS 8003120785
Download: ML19308D680 (2)


See also: IR 05000302/1973011

Text

.

.

O

'r

--

L ,/

3

UNITED STATES

W

o

ATOMIC ENERGY COMMISSION

I

.' <- [ o~ I '

DIRECTORATE OF REGULATORY OPERATICUS

-

\\q

,

,[

"

REGlo N 11 - S u t T E 818

%-'\\/%rgs 0* /

230 PE AC HT R E E ST R E ET , NOR T HWEST

AT 1. A N T A, GEORGI A 30333

NOV 161973

In Reply Refer To:

PD:II:EJV

50-302/73-11

Florida Power Corporation

-

Attn:

Mr. J. T. Rodgers

Assistant Vice President

Generation Engineering

3201 34th Street, South

P. O. Box 14042

St. Petersburg, Florida

33733

Gentlemen:

This refers to the inspection conducted by Messrs. W. B. Swan of this

office and L. L. Beratan of the Headquarters Technical Assistance Branch

on October 24-26, 1973, of activities authorized by AEC Construction

Permit No. CPPR-51 for the Crystal River 3 facility, and to the dis-

(N

cussion of our findings held by Messrs. Swan and Beratan with Mr. Bennett

(

)

and others of your staff at the conclusion of the inspection.

q;

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted

of selective examination of procedures and representative records,

interviews with personnel, and observations by the inspectors.

Within the scope of this inspection, no violations were disclosed.

We hav. examined actions you have taken with regard to previously reported

unresolved items. These are identified in Section IV of the summary of the

enclosed report.

One new unresolved item resulted from this inspection and is identified

in Section III of the summary of the enclosed report. This item will

be examined on subsequent inspections.

In accordance with Section 2.790 of the AEC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the AEC's Public Document

Room.

If this report contains any information that you believe to be

proprietary, it is necessary that you submit a written application to

G

0%220~2hf

. y3

\\

--.

. .

-

.

.

._

.

.

{

N

.

'

Florida Power Corporation

-2-

NOV 1 G 1973

.

l

this office . requesting that such information be withheld from public

'

disclosure.

If no proprietary information is identified, a written

i

statement to that effect should be submitted.

If an application is

submitted, it must fully identify the bases for which information is

claimed to be proprietary. The application should be prepared so that

information sought to be withheld is incorporated in a separate paper

and referenced in the application since the application will be placed

3

in the Public Document Room. Your application, or written statement,

should be submitted to us within 20 days.

If we are not contacted as

specified, the enclosed report and this letter may then be placed in the

Public Docunant Room.

Shoold you have any questions concerning this letter, we will be glad

to discuss them with you.

i

Very truly yours,

,

i

/

.

.-

,.

,

., idn

' -

Norman C. Moseley

Director

Enclosure:

a

RO Inspection Report No.

50-302/73-11

,