ML19308D663

From kanterella
Jump to navigation Jump to search
Specs for Proof Testing of Chemically Consolidated Foundation Elements
ML19308D663
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 01/07/1970
From: Harris J
GILBERT/COMMONWEALTH, INC. (FORMERLY GILBERT ASSOCIAT
To:
References
SP-5785, NUDOCS 8003120724
Download: ML19308D663 (17)


Text

--

N 9'*

\

File Cy.

Regulatory r

I, Z i~'W 33-we vvrces f -

SPECIFICATIONS PROOF TESTING .

of CHEMICALLY CONSOLIDATED FOUNDATION EIEEUTS -

CRYSTAL RIVER - UNIT NO. 3 FLORIDA POWER CORPORAI' ION SP-5785 January 7, 1970 FPC-321-A3.6 idnh ~- l&0.a d.;t 7, /970 API bVED - DFPT. PROJECT EUGR. [/ DdTE TQ nGc 'Ak  %~ 7, M 7 o h

ISSUED FOR CRYSTAL RIVER - UNIT 3 DATE I

1 l

l 1

Gilbert Associates, Inc.

525 Lancaster Avenue Reading, Pennsylvania J.H.L.-M.L.L.

W.O. 4203-60 800312072 ,jg 1 - . __ _l

4

  • =

, y i

CCNTDPfS Section Title Pages I Instructions to Bidders I-l thru I-8

~

II General Conditions II-l thru II-8 III Technical Specifications III-l thru III-3 Attachcients .

Contract Form OD-17-A Contractor's Affidavit OD-28-C Certificate of Insurance OD-lT-C 3

4 4

4 4

I e

g_  :._. .,

~. . ._. -

r. , , ,

1

.r' SECTION I

, INSTRUCTIONS TO BIDDERS' INDEX Item Title M 1:01 Invitation I-l 1:02 Submission of Proposals I-l 1:03 Evaluation of Proposals I-3 1:04 Insurance Requirements I-3 1:05 Performance and Payment Bond I-3 1:06 Contract Forms and Certificates I-3 1:07 Acceptance of Proposals Ih 1:08 Awards to Bidders and Paymer.t IL 1:09 Shipping Information Ih I

  • m.

'gegwwdav j iT** "

N'"-

6"-S"W"*=P""'W__W'__ M% ) *_[,-/' 7 W %*'

1:01 Invitation Proposals are requested by the Florida Power Corporation for the equipment , materials, and related WORK, set forth in the attached Specification, which will be incorporated in the Crystal River Plant Unit 3, located approximately five miles northwest of Crystal River, -

Florida.

1:02 Submiscion of Proposals 1:02.1 Original and five copies of the Proposal shall be submitted in quad-ruplicate and shall be transmitted to:

Florida Power Corporation P. O. Box lh0h2 St. Petersburg, Florida 33733 Attent ion : Mr. C. H. Thompscn Purchasing Agent 1:02.2 Proposals must be received by Florida Power Corporation or post marked prior to twelve noon .

1:02.3 Bidders shall furnish with their Proposals all drawings, catalog data, and other supplementary information necessary to describe thoroughly

,, the materials and equipment covered by their Proposal.

1:02.h Each Bidder shall submit with his Proposal the name of the manufacturer and the type or model of each principal item of the equipment or material he proposes to furnish. He shall also submit drawings and descriptive matter which vill show general arrangement and dimensions, appearance, principle of operation, and extent of factory assembly.

1:02 5 If the equipment cannot be shipped completely factory assembled, Bidders shall include with their Proposal the number, dimensions, and weight of each shipping unit and the amount of field work required to assemble the equipment completely.

1:02.6 The successful bidder may be required to furnish a service represent-ative to work with Florida Power Corporation's personnel during the initial operation of the equipment. The services of this represent-ative shall be outlined in the Proposal and the per diem charges stated separately.

1:02.7 One copy of provisional recommendations for spare parts shall be furnished with each Proposal.

s Y

I-l

1:02.8 Each Bidder shall includa in his Proposal the cost of furnishing _s one complete set of all special tools, suitab'y packed and all in -

- first class condition, which may be required for maintenance of the equipment covered by the Proposal.

1:02.9 The price stated in the Proposal shall include all taxes and licenses which might lawfully be assessed, on the date of the Proposal, against Florida Power Corporation or the Bidder in connection with the proposed WORK. Exception:

1. If the price stated in the Proposal is for the furnishing of materials and/or equipment only and does not include field labor for erecticn and/or installation, do not include Florida State Sales Tax in the bid. Florida Power Corpora-tion will pay such tax direct to the State of Florida.
2. If the price includes erection and/or installation labor to be performed at the job site, the Florida State Sales and -

Use Tax must be paid by the Bidder on the cost of the materials and supplies furnished. The Bidder awarded the Contract for this WORK shall be responsible for the payment of this tax to the State of Florida and should take this into account in his bid price.

1:02.10 The Bidders shall state in their Proposals that the materials and/or equipment will meet the Specifications as set forth herein.

Any exceptions to the Specifications set forth herein shall be w stated clearly in the Bidders' Proposals. /

1:02.11 Bidders shall state in their Proposals the complete terms of their warranty applicable to the materials and/or equipment they propose to furnish under this Specification, and the terms of extension of the warranty in the event of repair or replacement being required.

1:02.12 Bidders shall also state in their Proposals the extent of their guarantees for the performance of the equipment offered and for correction of items which fail to meet the warranty.

1:02.13 Royalties and fees for patents covering materials, articles, apparatus, devices or equinment used in the WORK shall be included in the Contract price.

1:n2.lh The Bidders shall not include in their Proposals the costs of insurance for equipment subsequent to receipt by the OWNER on the job site.

1:02.15 The labor rates of this 'wCRK shall be executed under the working conditions and wage rates established by the applicable collective bargaining group having jurisdiction over the area, and shall be performed in accordance with-the safety regulations of the Florida Industrial Commission.

'i

_ _ /

I-2 l

l t

l . , . -

. , -m,

? .-

- 1:02.16 Bidders are advised that, due to the scope of this construction project, certain materials and equipment are required, of necessity, to be delivered considerably in advance of the cetual commercial operation of the' equipment. It is presently anticipated that actual commercial use, other than preliminary testing, of the material or equipment will not commence until September 1972. Bidders are requested to take this into consideration in setting forth their warranty and quarantee terms, 1:02.17 Bidders shall set forth in their Proposals the terms of payment normal to their company or industry, including cash and/or trade discounts allowed, if any. Transportation charges shall be included from shipping point with full freight allowed to destination.

1:03 Evaluation of Proposals .

1:0~5.1 Bidders' ability to satisfy the OWNER of their capability to perform the WORK within the scheduled dates set forth herein vill be a basic consideration in evaluating the Proposals.

1:03 2 It shall be understood that the evaluation of Proposals received in accordance with these Instructions to Bidders and the attached Specification vill be conducted solely by Florida Power Corporation.

1:0h Insurance Requirements Florida Power Corporation Contract insurance requirements are set forth in paragraphs 5 and 6 of Contract Form OD-17-A (copy attached).

The successful bidder shall comply with these requirements prior to performing any WORK specified herein.

1:05 Performance and Payment Bond Bidders are advised that a Performance and Payment Bond may be required from the successful bidder. The cost of such Performance and Payment Bond is to be set forth as a separate item in the Proposal.

In the event Florida Power Corporation elects not to require a Performance and Payment Bond,10 percent of each progress payment, if any, vill be withheld until completion and acceptance of all WORK and receipt of CONTRACTOR'S Affidavit (copy attached) properly executed in duplicate.

1:06 Contract Forms and Certificates 1:06.1 The -following documents vill be incorporated into or referenced by the Contract awarded to the successful bidder:

1. Contract Form - OD-17-A.

I-3

O

2. Contractor's Affidavit - OD-28-A, B, or C.

3 Insurance Certificate - OD-17-C.

1:06.2 Copies of these documents are attaened herewith; and Bidders shall thoroughly familiarize themselves with all of the terms, conditions and instructions contained therein prior to submitting their Proposal.

1:07 Acceptance of Proposals Florida Pever Corporation reserves the right to accept or reject any or all Proposals.

1:08 Awards to Bidders and Payment Florida Power Corporation vill issue all purchase orders and make payment for the materials and/or equipment purchased.

1:09 Shipping Information Bidders are advised that the shipments may be made to the plant site

. by the following carriers. All shipments shall be consigned to Florida Power Corporation, Crystal River Plant Unit No. 3:

,, Via Railroad: Seaboard Coast Line (SCL) delivering carrier: Carload shipments only -

destination station Red Level Junction, Florida. L.C.L. Shipments - destination station Crystal River, Florida.

Via Truck Lines: Commercial Carriers - destination Red Ievel, Florida.

Water Transportatior : A 15 foot deep barge channel has been dredged from the Gulf of Mexico to the plant site. Contact Florida Power Corporation for particulars if barge delivery is contemplated.

Parcel Post: P. O. Box 276, Crystal River, Flcrida 32629

's

=, s_/

Ik

SECTION II GENERAL CONDITIONS INDEX Item Title M 2:01 Scope II-l 2:02 Definitions II-l 2:03 Equipment and Materials to be Supplied by the Contractor II-l 2:0h Codes and Standards II-2 2:05 Laws and Regulations II-2 2:06 Engineering Data, Shop and Erection Drawings II-2 2:07 Instruction Manuals II-3 i 2:08 Recommended Spare Parts II h

- 2:09 Design and Manufacturing Program II b 2:10 Manufacturing Errors II h 2:11 Bill of Material II-h 2:12 Manufacture and Inspection of Equipnent II-5 2:13 Shipment of Completed Work II-6 2:lh Special Tools II-6 2:15 Protection During Shipment and Storage II-6 2:16 Shipping Notices II-7 2:17 Patents

  • II-8 2:18 Conflicts II-8 W

" " ' s e ~~rss--n.. s, ~ , . , . . . . ,

2:01 Scope These General Conditions are applicable to equipment , materials and related WORK which will be incorporated in the new addition to Florida Power Corporation's Crystal River Plant.

2:02 Definitions ,

~

It shall be understood that the following terms as used in the Specifications shall have the meaning herein given:

1. "0WNE" shall mean the FLORIDA POWER CORPORATION.
2. " ENGINEER" shall mean GILBERT ASSOCIATES, INC. , Consulting Engineers.
3. " CONTRACTOR" shall mean the successful bidder for the WORK who will undertake the performance of the WORK required by the Contract.

~

h. " WORK" shall mean labor, services, materials and equipment as set forth in the CONTRACT DOCUMENTS.

5 " CONTRACT DOCUMENTS" shall mean all Drawings, Specifications and Addenda thereto as prepared and issued by the OWNER, the Invitation to Bid, the CONTRACTOR'S Proposal, and Manufacturer's Drawings as approved by the ENGINEER, all of which are part of the CONTRACTOR'S Contract with the OWNER. These CONTRACT DOCUMENTS are complementary and what is called for by any one of them shall be as binding as if called for by all. Any conflicts in the CONTRACT DOCUMENTS shall be resolved by the OWNER.

6. " EQUAL" shall mean equal as approved by the OWNER or the ENGINEER.

2:03 Equipment and Materials to be Supplied by the Contractor All equipment and materials furnished under these Specifications shall be manufactured within the continental limits of the United States of America.

N

%.a II-l

-- . . - . . - ~ . -

~

.Q 2:0h Codes and Standards Unless specified otherwise herein, equipnent and materials shall comply with all governing regulations and with the applicable stand-ard specifications and codes of USAS, ASTM, ASME, IPCEA, NEMA, EEI, IEEE, UL, and other such regular published and accepted standards.

The regulation, specification or code applied in each case shall be the latest version of such regulation or standard adopted and published-at the date of taking bids. Any conflict between standards shall be referred to the OWNER vho will determine which standard shall govern.

2:05 Laws and Regulations All equipment and WORK shall be in accordance with the laws of the State of Florida and the Rules of the Florida Industrial Commission. .

2:06 Engineering Data, Shop and Erection Drawings 2:06.1 Upon Award of a Contract, engineering data covering all equipment and fabricated materials to be furnished shall be subnitted promptly by the CONTRACTOR for approval.

2:06.2 The CONTRACTOR chall submit 2 sepia copies and 2 prints of preliminary drawings and necessary data for approval, to the ENGINEER, at the 3 address below: j Gilbert Associates, Inc.

Consulting Engineers 525 Lancaster Avenue Reading, Pennsylvania 19603 Attention: Mr. E. R. Hottenstein Project Manager 2:06.3 These drawings shall be sufficient and complete for system design purposes and for use in designing associated systems.

2:06.h For final approval, the CONTRACTOR shall submit 2 sepia copies and 2 prints of drawings and necessary data for approval to the ENGINEER.

2:06.5 On each drawing submission (original, revisions, and final) the CONTRACTOR shall send one copy of each drawing and data direct to:

Florida Power Corporation P. O. Box lh0b2 St. Petersburg, Florida 33733 Attention: Mr. W. O. May Manager - Power Engineering o )

II-2 L m .y m - , m e,.~ .s y m e -

l 2:06.6 These drawings shall be sufficient and ccmplete for adequate erection, operation, and maintenance of the equipment. The engineering data shall include drawings and descriptive information in sufficient detail to show the kind, size, arrangement, and operation of component materials and devices; the external connections, anchorages , and supports required; performance characteristics; and dimensions needed for installation and ' correlation with other materials and equipment. Data submitted shall include all required piping arrangement drawings, design calcu-lations, pneumatic control system schematic diagrams, detailed drawings and data for structural systems, and complete power and control circuit logic diagrams, schematics, and viring diagrams.

2:06.7 Nc1 WORK shall be performed in connection with the fabrication or .

manufacture of materials and equipment , nor shall any accessory or appurtenance be purchased until the drawings and data therefore have been approved, except at the CONTRACTOR'S own risk and responsibility.

2:06.8 Exceptions to item 2:06.7 shall be by agreement with the OWNER.

2:07 Instruction Manuals 2:07.1 The CONTRACTOR shall furnish eleven complete and final copies of i instruction manuals not later than 60 days prior to shipment of the equipment. Ten copies shall be sent to:

Florida Power Corporation P. O. Box 1h0h2 St. Petersburg, Florida 33733 Attention: Mr. W. O. May Manager - Power Engineering One copy shall be sent to:

Gilbert Associates, Inc.

Consulting Engineers 525 Lancaster Avenue Reading, Pennsylvania 19603 Attention: Mr. E. R. Hottenstein Project Manager 2:07 2 The instruction manuals shall cover complete installation, operating and maintenance instructions, drawings, and parts lists for each item of equipment furnished.

E '

II-3 1

,- .= ~ n ,

2:07.3 The instruction manuals shall be bound with covers suitable for rough usage. The front covers shall be stamped with lettering indicating the-0WNER'S name,, unit number, name of power plant, location of power plant, name of equipnent, basic capacity rating of equipment, and name of manufacturer.

2:08 Recommended Spare Parts The list of recommended spare parts, with the price of each such item, and a schedule of required lubricants, as recommended by the manufacturer of each item of equipment, shall be included in the instruction manuals.

2:09 Design and Manufacturing Program 2:09 1 The manuf acturer's design engineer shall be prepared to visit the office of the OWNER or the ENGINEER for design conference at such times as are required to expedite the handling of engineering matters.

2:09.2 The Contract program will be controlled by CPM diagrams, and the CONTRACTOR shall provide all necessary information requested by the OWNER or the ENGINEER for compilation of these. In general, infor-mation required will include drawing schedules, purchasing schedules for major equipment items, and delivery dates. 5 2:10 Manufacturing Errors Equipment and materials shall be complete in all respects within the limits herein outlined. All manufacturing errors or omissions re-quired to be corrected in the field shall be performed by the CONTRACTOR at his expense; or if done by the OWNER, the cost of same shall be borne by the CONTRACTOR.

2:11 Bill of Material 2:11.1 The CONTRACTOR shall prepare a Bill of Material covering all material and equipment furnished under this Specification. The Bill of Material shall be submitted in a preliminary form with the preliminary drawing submission and be finalized approximately two weeks before the scheduled arrival time of the first shipment. The Bill of Material shall be itemized in sufficient detail to permit an accurate determination of the completion of shipment of the material and equipment furnished under these Specifications.

t W W II h M* * * ' " " ' ' ' " ' ' ' " a ,4 _

3 2:11.2 The mailing address for the finalized Bill of Material is:

Florida Power Corporation Crystal River Plant Unit No. 3 P. O. Box 276 Crystal River, Florida 32629 Attention: Mr. H. L. Bennett Construction Manager 2:11.3 All items of equipment delivered to site shall be marked adequately to allow identification from the Bill of Material.

2:11.4 If the equipment is to be shipped in sections , with accessories or appurtenances detached, or otherwise not completely factory assembled, .

the extent of assembly shall be in accordance with the information submitted with the Proposal regarding the number, dimensions and weight of each section, accessory or appurtenance, and the amount of field WORK required to completely assemble the equipment.

2:11.5 Suitable labels shall be affixed to all pre-assembled / pre-fabricated parts.

2:12 Manufacture and Inspection of Equipment 2:12.1 The CONTRACTOR shall advise the OWNER of all his major subcontractors before orders are placed, and he shall not place orders with any subcontractor until approval of the OWNER has been obtained. The CONTRACTOR shall indicate where the equipment will be fabricated, and the OWNER and/or its representative shall have the right to inspect all manufacturing facilities before approving the subcon-tractor.

2:12.2 The CWNER and/or its representative reserves the right to inspect fully all phases of manufacture of the equipment included in the Contract. Any -item found to be unsatisfactory shall be replaced or repaired at no cost to the OWNER. Any inspection by the OWNER and/or its representative shall not relieve the CONTRACTOR of his responsibility for conforming to the stated conditions and shall not be considered a waiver of warranty or other rights. No repairs or changes in excess of original Specifications or applicable codes, if requested by the inspector, shall be made without the approval of the OWNER.

2:12.3 All shop tests required for certification and proof that the equip-ment conforms to all applicable codes and standards shall be made at the expense of the CONTRACTOR. Any additional tests required by the OWNER and/or its representative shall be at OWNER'S expense with price to be negotiated for each individual case.

2:12.h All parts of the equipment shall be protected against damage or corrosion during and fc loving any tests.

w II-5

. ~

7 2:12.5 The OWNER and the ENGINEER chall have the right of representation at all shop tests, and they shall be notified at least one (1) week in advance of all shop t sts and inspection.

2:12.6 One (1) properly identified copy of the CONTRACTOR'S welding procedures, and other special fabrication data for the equipment, shall be sub-mitted to the ENGINEER for review and approval, and three (3) copies shall be sent to the OWNER.

2:12 7 One (1) certified copy of all shop test data for the equipment, prop-erly identified, shall be forwarded to the ENGINEER for acceptance, and three (3) copies shall be sent to the OWNER.

2:13 Shipment of Completed Work All equipment -)sll be shipped completely factory assembled, except when the physical size, arrangement or configuration of the equipment or shipping and handling limitations make the shipment of completely assembled equipment impracticshle.

2:lh Special Tools 2:lk.1 The CONTRACTOR shall furnish one complete set of all special tools, 3-

'~

all in first class condition, which will be required for maintenance j of the equipment covered by the Contract. Identification of all tools by name and number shall be provided, and this number shall appear on drawings and instructions to indicate the application of the tools furnished and to permit ordering replacements.

2:lk.2 The tools shall be shipped in a separate, heavily constructed, wooden box or boxes provided with hinged covers and padlock clasps. The boxes shall be marked with a large painted legend as follows :

Florida Power Corp. - Crystal River Unit No. 3 Maintenance Tools - (Name of equipment )

2:15 Protection During Shipment and Storage 2:15.1 Except as specified otherwise herein, exposed iron and steel surfaces of all equipment shall be given one coat of primer paint before ship-ment of the equipment to the job site. Before application of paint, all surfaces shall be free of rust, scale, lubricants, moisture, and other substances. Surfaces prepared for field welding shall be left unpainted for a distance of two inches from the veld. These surfaces shal] be given a protective film of oil or other easily removed ma-terial to prevent rusting before erection.

~

A II-6

5

~,

2:15.2 The CONTRACTOR will be advised of the acceptable prime paint for

- exposed carbon steel surfaces of equipment and material to be' in-stalled inside the reactor building.

2:15 3 All exposed carton steel surfaces of all other equipment shall be painted with zine chromate pigment , rust inhibitive, metal primer paint reccmmended by the paint manufacturer for the service intended, and for application to metals prepared for painting by wire brushing.

Paint sh C be applied in accordance with the paint. manufacturer's reccanendations.

2:15.h Machined surfaces such as shafts, pins, bushings, shaft couplings, and-other similar parts whose operation would be impaired by painting shall not be painted. These surfaces shall be protected by application of an easily removable rust preventative compound.

15.5 Plastics, corrosion-resistant metals such as aluminum, brass, bronze, or stainless stee:, and chrome plate or galvanized surfaces shall not be painted.

2:15.6 Each piece of equipmer. enall be cleaned thoroughly and dried prior to shipment. Equipment mau of ca cbon steel shall contain adequate bags of silica-gel or approved equivalent desiccant to maintain a dew point of 40 F. Desiccant bags shall be securely anchored within the equipment.

All openings of all equipment shall be closed prior to shipment with an

\

easy to remove plug of suitable material.

~

2:15 7 All equipment and accessory items shall be suitably boxed, crated, wrapped, or covered to the extent practicable, to prevent entrance of dirt or moisture and to prevent accidental damage during shipment to the job site and during outdoor storage at the job site. Where necessarv, a desiccant shall be included within the packing enclosure of items sensitive to changes in humidity.

2:15.8 All accessory items shall be shipped with the equipment. Boxes and crates containing accessory items shall be marked so that they are iden-tified with the main equipment. The contents of the boxes and crates shall also be indicated.

2:16 Shipping Notices 2:16.1 The CONTRACTOR shall provide two copies of a shipping notice describ-ing each saipment of material or equipment. The shipping notice shall be mailed on a schedule so that the notice will arrive approximately three days ahead of the estimated arrival time of the shipment.

II-7

.~.,.m,.-,,._-- .- <-~.a- .

_p

, .my . - ~ , s .wr-1.. --

2.'6.2 The shipping notice shall be identified with the OWNER'S name, purchase order number, and name of the item of equipment or material.

2 :16. 3 -: The mailing addres.s for the shipping notice is:

Florida Power Corporation Crystal River Plant Unit No. 3 P. O. Box 276 Crystal River, Florida 32629 Attention: Mr. H. L. Bennett Construction Manager 2:17 Patents The CONTRACTOR shall satisfy all demands that may be made at any time for royalties and fees, and he shall be liable for any damages or claims for patent infringements. The CONTRACTOR shall, at his own expense, defend all suits or proceedings that may be instituted against the OWNER for infringement or alleged in-fringement of any patents involved in the WORK, and, in the case of an award of damages , the CONTRACTOR shall pay such award.

2:18 Conf 14ets

- In the event of discrepancies between the detailed requirements of -

this Specification and those of the General Conditions, the de-tailed requirements shall prevail.

v II-8

~ - ~ .-.- - , - _

SP-5785

, 1-7-70 s

SECTION III DETAILED SPECIFICATIONS INDEX Item Title _ Page 1

3:01 Scope III-1 3:02 Equipment and Materials III-l 3:03 Exploration Drilling and Sampling III-l 3:04 Penetration nesistance Testihg III-2 i 3:05 Permeability Tests III-2 3:06 Data Evaluation III-3 I

I e

e 4

l l

o

- ....7_.., . _ , _ , , _ . , , _ _ _ _ , _ , , , ,

(-

SP-5735 1-7-70

^

3:01 Scope These specifications shall be applicable to the exploratory drilling, sampling and testing of foundation materials which have been con-solidated uith chemical grout. Testing shall include the performance of Standard Penetration Resistance (SPR), Cone Penetration Resistance (CPR) and Permeability tests as specified herein.

3:02 Equiment and Materials 3:02.1 The CONTPACTOR shall be responsible for furnishing all labor, drilling rics, rods, cere barrels, split spoon samplers, core boxes, sample jars, scaling waxes, packers, packer pipe and other equipment and materials necessary foi the satisfactory and efficient execution of the exploration program.

3:02.2 The CO:: TRACTOR vin not be responsible for testing of core camples, -

nor for providing testing equipment or materiale except as provided above.

3:03 Exploration Drilling and Sacoling 3:03 1 Test locations shall be determined by the ENGINEER except that there shall not be less than one SFR and/or CPR test location per 400 square feet of chemically stabilized foundation area. At least one permeability

, test shall be conducted per 800 square feet except that there shall not be less than 5 locations within the chemically stabilized foundation area.

3:03 2 The CONTRACTOR shall conduct, in exploratory borings, such rock core drilling and soil sa=pling as may be required by the ENGINEER to determine the condition cf the foundation materials and the effec-tiveness of the grouting operations.

3:03 3 Exploratory drilling shall be conducted with suitably powered rotary drilling equipment fixed with hydraulic feed capable of a stroke of at least 18 inches.

3:03.h Borings shall be advanced using a bentonitic drilling fluid or EQUAL or flush joint easing of an adequate diameter to accommodate the various sampling tools specified by the ENGINEER.

l 3:03 5 Core drilling chall be performed with an IDC size "M" series or an approved swivel type double-tube core-barrel and diamond bit. An approved Denison barrel sampler shall be used for recovery of samples having a minimu= diameter of 2-3/8 inches as directed by the ENGIIM.

3:03.6 All drilling, sampling and testing shall be performed in a workmanlike manner by competent and experienced drillers. Special care shall be exercised to obtain and caintain samples and cores in as good condition as possible.

III-1

_ _ . , _ _ _ . _ _ _ . ~ _ __, . _ . . . . . _ . , _ _ _ . _ _

SP-578s 1-7-70 3:03 7 Wooden core boxes chall be furniched by the COUTRACTOR. The 3 CONTRACTOR chall place the cores in the boxes in correct sequence '

and ceparated accurately bf labeled wooden blocks according to the ceacured dictaneca in the holes. No box chall contain corco from more than one hole. . Designating narks, hole numbers and elevations chall be placed on the boxes and along the line of cores ac cctsblished by the EUGIITEER. The covers shall be factoned ccevrcly to the core boxes and the boxes shall be delivered to the ENGINEER at his designated point of delivery at the Plant Site.

3:03 8 The C07tr. ACTOR shall furnish 8 ounce jars to retain soil campics.

The jar lidc shall be fixed with cashots or shall be sealed with wax to prevent moisture loss. The Boring Number, Sample Humber, depth and SPR value shall be noted on each cample jar. Denison tube sa=ples chall be retained in the samplin6 tube and the ends trimmed and scaled with vax. The wax shall be Mobil Wax Ho. 2305 .

produced by the Mobil Oil Company, or EQUAL.

3:03 9 Core samples selected by the EIR3INEER shall be tightly wrapped in aluminum foil and dipped in wax immediately upon recovery. The wax shall be Mobil Wax No. 2305 or equal.

3:04 Penetration Resistance Testing 3:ck.1 Standard Penetration Resistance Tests shall be conducted in designated borings and samples retained in accordance with AS24 Test Designation D-1586. An accurate record of the blows necessary ~

to advance the sampler for each 6 inches of an 18 inch penetration chall be maintained, except that sampler penetration any be terminated and recorded where the SPR becomes creater than 50 blows per 6 inches.

3:04.2 CPR tests may be conducted in designated borings using an approved 1.4 inch diameter (10 square centimeters), 60 degree cono advanced at a uniform rate of approxicately h feet per minute (2 centimeters persecond). The cone penetration resistance test shall be conducted so as to be free of any significant rod friction effects.

3:05 rerncability Tests Constant head permeability tests shall be performed using " pump-in" techniques in the followin6 manner:

1. An Ux doubic seating packer shall be incerted te the elevation designated by the ENGINEER.
2. The heeder shall be attached to the collar of the hole and a constant pressure not to exceed ;0 psi shal1~be applied to the hole.

3 The rate of water consumption shall be recorded at an appropriate time interval for a sufficient period of time to obtain meaningful permeability data as required by the ENGINEER. #

III-2 ,

- ~

~~-b

SP-5185 1-7-70

h. The data received during the test shall be recorded on Gilbert Ascociatec, Inc. form: PRESSURE TESTING AND GROUT LOG - Crystal River No. 3 or EQUAL.

5 Alternatively, should the hole tend to " cave", permeability tests shall be conducted by the "puinp-in" technique using an open-end cacinc holding a constant pressure at the bottom of the hole below a single seating NX packer.

6. Selered exploration holes within the chemically consolidated cntcir W shall be tested for permeability in intervals not to en- . feet.

3:06 Data Eve _ ,

' All data shall be recorded on fo.-ms acceptabic to the EI!GINEER and '

presented to the EI!GINEER on a dai.1,y basis. The ENGINEER shall evaluate the data to determine th? acceptability of the grouting according to Specification SP-5763, chemical Grouting. In arcas where exploration reveals substandard conditions, the EUGINEER shall determine what further exploration, analysis or remedial measures, if any, are required.

4 I

\

I

.. _ _ _ _ _ _ . . _. . _ _ ____,,__ _ m- _.. _ _, ._ _ ._ m

-# # m sw w .e.m.wm, w. . h * .+e.p+es- a.w FLORIDA POWER CORPORATION CONTRACT FORM TO BE USED FOR, BUT NOT LDUTED TO, ALL LINE CONSTRUCTION AND MALNTENANCE, BOTH OVERHEAD AND UNDERGROUND, TREE TRIMMING, RIGHT.OF-WAY CLEARING AND POWER PLANT AND SUBSTATION CONSTRUCTION.

Date (Name of Firm)

Our Requisition No (Strees Address)

... Purchase Order No (City and State)

We hereby employ you as an Independent Contractor to perform the following work and labor:

1 l

, in accordance with the specifications contained in the following enumerated letters, proposals, documents, drawings, plans, exhibits and/or schedules which by this reference are incorporated as a part of this contract:

subjxt to and upon the following terms and conditions:

1. Time is of the essence of this contract and the foregoing work and labor are to be completed by

i l

I

2. As compensation in full for the foregoing work and labor, we shall pay you.

-Dollars ($ ), payable as follows:

We understand that the foregoing compensation includes $ for materials upon which a Florida sales or use tax is payable and that you have or will have paid $ of such tax.

3. The foregoing work and labor are part of a common enterprise under our general supervision and you are employed to perform said work and labor as an Independent Contractor subject only to our gen-Form OP.17.A i

-_.e -.. - - . - . -.-. . -.- . . . , . , - - . . _ . . . - _ .

?r.1 :npervision to see thit tha fin.1 results cf such w:rk r_nd libor comply with tha tbova ine:rportted specificcti:ns. As such Independent Contractor, you will employ as your own and pay such workers as j you may require to perform said work and labor, use your own equipment unless and to the extent i otherwise permitted by said specifications, follow your own working methods in complying with said i

specifications, and superintend said work and labor personally; and, in the event any of said work or ,m labor shall be performed by subcontractors, you will coordinate the work and labor of such subcon- l

' tractors and the same shall constitute part of the common enterprise.

1

4. You shall be held fuily accountable, and subject to inspection and audi' + any time, for. materials issued by us to be used by you in connection with work to be performed here u,sr. You shall pay us the cost of any material not used or not returned to us, except that reasonabie allowances will be made by us for normal loss and breakage ine: dent to the type of construction involved.

! 5. You will assume full responsibility for the foregoing work and labor and will defend us and hold

us harmless against and indemnify us for any and all accidents or damages or claims or costs whatso-j ever arising within the scope thereof or in carrying out this contract, irrespective of negligence actual I j or claimed on our part. If any member of the public, or any employee or agent of yours, or any em-
ployee or agent of a subcontractor is injured or killed, or if any property including ours or the publics

! is damaged in the course of work being performed under the provisions of this contract, you will notify j

our company personnel who is inspecting the work or in his absence, our company supervisor who orig- l i inated the contract with you. Such notification will be made immediately in person or by telephone and i promptly confirmed in writing, and will include all pertinent data such as name of injured party, loca- .

j tion of cecident, description of accident, nature of injuries, names of witnesses, disposition of injured I j or deceased person.

l j 6. As a safeguard in respect of paragraph 5 above, you will carry Workmen's Compensation Insurance j in the maximum amounts required by statute and will also carry policies of insurance acceptable to us i l with respect to (a) General Liability with Bodily Injury limits not less than $200,000 each person and j j $500,000 each occurrence and with Property Damage limits not less than $50,000 each occurrence and i

$100,000 aggregate, and (b) Automobile Liability with Bodily Injury limits not less than $200,000 each 1 person and $500,000 each occurrence and with Property Damage limits not less than $50,000 each occur-rence. You will have the insurance policies mentioned in (a) and (b) above, respectively, endorsed by your insurance carrier to provide blanket contractual coverage, expressly with respect to paragraph 5 above, to the fulllimits of and for the liabilities insured under said policies; and, prior to the commencement of any work hereunder, you will furnish us with a certificate,in duplicate, on our form OD-17-C, completed j by your insurance carrier showing that you carry the requisite insurance and that the specified policies m insure the liability assumed by you under paragraph 5 above.

)

l 7. You are hereby advised that the generation, transmission and/or distribution of electrical energy J

i involves the handling of a natural force which, when uncontrolled, is inherently hazardous to life and i voperty. You are further hereby advised that, due to the nature of the work to be performed here.

I under, other hazardous or dangerous conditions (not necessarily related to the inherent danger of elec-tricity) may also be involved in the work. Accordingly, prior to the commencement of the work, you l shall inspect the job site specifically to ascertain the actual and potential existence and extent of any 1 harmious or dangerous conditions, and instruct your employees with respect to said conditions and the i sa fety ineasures to be taken in connection therewith; and, during the course of the work, you shall take

! all r m measures as may be deemed necessary or advisable to protect and safeguard the person and i property of your employees and of the general public against all hazardous or dangerous conditions as i the same arise.

l' You and your duly' authorized agents and employees shall, before climbing poles or structures, make certain that they are strong enough to safely sustain workmen's weight in the performance of the re-2 quired work on the poles or structures. All work designated in any Letter Agreement or in any Author-ization or Purchase Order given to you under this Agreement to be performed at or near or involving energized electrical conductors shall be performed under the conditions and at the place as stated, but 1 only with the specific understanding that if you in your sole discretion regard the place where such j work is to be performed, or where such work is being performed, as an unsafe place to wock, either j because the said conductors or other equipment are so energized, or because it is deemed unsafe for any j other reason or condition or conditions then and there existing, you shall request us for a clearance to i de-energite the said conductors or other equipment, or to make tuch other change or changes as may i be necessary or desirable in your sole discretion, to render the place of performance at the job site a safe i

place to work for your employees. In the absence of any request by you to us it shall be conclusively j p*esumed that the place where the work is to be performed is a safe place to work withopt the de-energization of such conductors or rther equipment, and without making any changes whatsoever at the i job site.

I i

' In the event that we have knowledge of any latent hazardous or dangerous conditions that exist within the job site, Appendix A will be attached hereto to warn you thereof. Any such notice shall not in any- 1 wise or manner diminish or release you from your responsibilities set forth in this paragraph 7 above. V

8. We shall provide all easements, trimming and clearing rights, and no work on land clearing or line construction shall be started by you until specifically authorized by us in writing.

1 l Form OD 17 A 1

i n ... - -

y

If you are primarily a tree trimming contractor, ysu will obtain permimmian from property owners before trimming trees, and will perform the work in such a manner as to avoid complaints from property owners, members of the community, and city or county officials. You will obtain clearance to wire = in their pres-ent position, or the position in which slack wires are to be pulled, in accordance with PWstions fur-nished with this contc -t, or a satisfactory explanation for failure to obtain such clearance must be made by you.

9. The foregoing work and labor shall be performed under the applicable buiMing trade wages and conditions; and you will comply with the requirements of and the regulations promulgated under the Fair Labor Standards Act of 1938 and the Social Security Act, including State and Federal Unemploy-ment Compensation, and will file all reports and pay all taxes required thereunder.
10. All work to be performed by you hereunder shall be delivered to us free and clear of all labor, material and mechanics' liens, and any other encumbrances whatsoever, which might be occasioned by

, or permitted to be created by you. Such delivery shall be on our applicable contractor's affidavit (Form OD-28-A; OD-28-B; or OD-28-C). ,

11. Should you becorne insolvent, or refuse or neglect to supply a sufficiency of properly skilled work-men or equipment, or fall to make reasonable progress with the prosecution of the work, or otherwise fall in the performance of any obligation under this contract, then, in any such event, we shall have the right to terminate this contract upon forty-eight (48) hours' written notice served upon or delivered t1 you or your duly authorized representative. . i
12. This contract constitutes the full, complete and only agreement as of the date hereof between the parties hereto with respect to the foregoing work and labor; and, anything contained in the above in-corporated specifications to the contrary notwithstanding, whenever there shall be any conflict, latent or otherwise, between the provisions therein set forth and the provisims set forth on this form, the latter shall prevail.

FLORIDA POWER CORPORATION Byr Title. .. l I hereby undertake to perform the work and labor outlined in the foregoing in accordance with the terms thereof a of the date above stated. My Employer's Account Number under Federal Social Security is

, and under State Unemployment Compensation is .

Date Accepted- .19 Name of Firm- .-

By-Title _ ., ..

Form OD.17.A

CORPORATION FORht CON l'R AGl'OR'S AFFil)AVIT To FI,ORII)A POWER COR POR ATION STATF. OF FLORIDA '

COUNTY ')F ..

.[

  • On this day before me, the undersigned authinisy duly authorised to take oath, personally appeared . . . . .

who, being by me first duly sworn, on oath deposes and says that:

1. Affiant is the duly cicetcd and av sing Vie e Pectidens of .

(Company)

(herein ralled " Contractor"). a Corporation, which performed the (State) hereinafter descril.'ed contrare for Florida Power Corporation (hcrein ralled " Owner"), with full authority to make this affidavit for said corporation.

2. Contractor heretofore entered into a contract. dated .. .. . . . 19 (herein called "Contrart"), with Owner to furnish materiah. machinery and eqiiipment and/or to perform labor necessary for the construction of huildings and/or repair or alteration of buildm, gs, structures or machinery and equipment and/or construction or installation of facilities, on the Owner's land and property, all as more specific-ally described in the Contrart, or in the Purchase and/or Work Order attached to the Contract, and the descriptions therein contained are hereby incorporated herein by this reference thereto.

t

3. In connection with the request of the Contractor for final payment, under the Contract, it is hereby certified that all work, laimr, services, materials, machinery and equipment furnished by the Contractor have been fully paid for by the Contractor and that there are no amounts unpaid in favor .I any subcontractor or any other person furnish.

Ing labor and materials to the Contractor and utilized in the perforn ance of the obligations of the Contractor under the Contract on the basis of which any tien (commonly called a mechanic's or materialman's lien) has been or can be filed and/or perfected under the laws of Florida for work done or materials, machinery, or equipment furnished to said land, building, structures, machinery, equipment, property or facilities or any pas. thereof of the Owner, except as set forth in Item 8 hereinafter.

4. The Contractor does hereby agree to indemnify and hold harmless the Owner against any loss, cost or damage arising out of the Contract by reason of the placing or filing or perfecting and foreclosure of liens, against said real estan c4 the structures thereon by subcontractors or by Inhorers or materialmen of the Contrutor or of any sobcontrac.ar of tha Contractor.
5. It is further certified that all federal taxes required to be withheld from employees of the Contractor have been withheld in the manner provided by law.
6. All vouchers, receipts and other evidence of payment with respect to claims of third persons against the Contractor, srising out of, connected with or resulting from performame of the Contractor of his obligations under the Contract are in the possession of the undersigned and cover all claims of every description, kind or nature forming the basis for a mechanic's or materialman's lien against said property of Owner up to and including the date of this affidavit.
7. Receipt by the Contractor of the final payment under the Contract, or payments made in accordance with Item 8, shall constitute a full release and discharge of the Owner by the Contractor from any and all claims of the Con.

tractor against the Owner, arising out of, connected with or resulting from performance of the obligations of the

\

Contractor pursuant to the Contract.

OD.28-C

  1. - .__-..m - -- -- -s- . s , . - . .
8. Unpsid elaims and liens which (:ontraont ennsenes an Owner psying Irnm smount due under Contraet tre: (Atta.h separate schedule, il necessary).

Nature of Labor, Services or Material Amount Furnished Due Name of Sulwontractor. -N

_ Lalmrer or Materialman

- 3-- .

1 3 . . . . . . . . . . . . , .

9. Contractor is making this affidavit for the purpose of inducing Owner to make final payment of $ . . ,

(less amounts set forth in item 8,if any) to Contractor under the Contract and Chapter 84, Florida Statutes.

l (Contractor)

By ~ --- - - - _.

Vice. President Sworn to and subscribed before me this day of I9 .

Notary Public/ State of Florida, at Large.

My Commission Empires: _.

l INSTRUCTIONS FOA COMPLETING THIS AFFIDAVIT

l. Insert name of County where affidavit is signed.
2. The name of person in the second line of the affidavit should be the first name, middle initial and last name of the Individual signing this affidavit.

S. Ii affidavit is signed by the President, .:rike the word "Vice" in the first line of Item I and under the "By" line in the signature spaces.

4. In "Com a y" space of Item I, insert tull name of the corporation: and in " State" space, insert the name of the State ofI ncorporation.

l

5. On first line of Item 2. In the case of a specific job Contract, insert date shown in the upper right hand corner  !

of the Form Purchase OrderOD.17 covering(A theor B) job for which fim.1 payment is requested. Contract, and, in the case

6. If no claim or lien unpaid, wthe None in Iten 8.
7. Insert arnount of final payment in Item 9, less amounts set forth in Item 8, if any. -

l

8. In the signature spaces the name on the " Contractor" line should be the same as the n .ne of the " Company" in item I and the signature on the "By" line should be the same as that appearingin tree second line of the eff?d. vit.
9. Have Notary Public fill in, sign and seal where indicated.

~

FLCRIDA POWER CGRPCRATISN CERTIFICATE OF INSURANCE

(' ' THIS IS TO CERTIFY THAT THE. INSURANCE COMPANY of. - has hoved policies of insomnce, as described below and identified by a policy number, to the insured named below; and to certify that such policies are in full force and effect at this time. It is agreed that none of these policies will be cancelled or changed so as to affect this Certificate until twenty (20) days after written notice of such cancellation or change has been delivered to the Florida Power Corporation.

1. Insured.
2. Address..
3. Status of Insuod Corpomtion O Partnership O Individual O
4. Location of Operations insured - State of Florida O Limited to the following specific lob location (s)

INSURANCE POLICIES IN FORCE FORM OF COVERAGE POUCY NUMBER EXPIRATION DATE S. WORKMEN'S COMPENSATION

6. MANUFACTURERS' OR CONTRACTORS' LIABILITY
7. CONTRACTUAL LIABILITY (Uability Assumed by Insured)
8. AUTOMOBILE UABILITY  ! l Policy (ies) includes Coverage For: Yes No (5) Liability under the United States Longshoremen's and Harbor Workers' Compensation Act. O O (6) Damage caused by blasting, collapse or structural injury, or damage to underground utilities. O O (7) Liability assumed in construction agreements and other types of contracts or agreements in effect in connection with the insured operations being performed for the Florida Power Corporation. O O (8) All owned, hired, or non-owned automotive equipment used in connection with the insured operations. O O FORM OF COVERAGE LIMITS OF LIABILITY sooitY INJURY PROPERTY DAMAGE
9. WORKMEN'S COMPENSATION STATUTORY XXXXX l 10. LIABILITY OTHER THAN AUTOMOBILE f f, ],,c, g E

Ag ego C

11. LIABILITY- AUTOMOBILE f $ Each Occurrence Date..

INSUEANCE COMPANY I 's issued at-AUTHORIZED REPRESENTATIVE Form 00174.

--