Forwards IE Insp Rept 50-302/77-25 on 771212-16.No Noncompliance Noted
ML19308D535
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 01/09/1978
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stewart W
FLORIDA POWER CORP.
Shared Package
ML19308D536 List:
References
NUDOCS 8002280971
Download: ML19308D535 (2)


See also: IR 05000302/1977025

Text

.

.-._

- .- -.

__

_

.

.

,

~.

.

8 88%g#

4

UNITED STATES

o,,

NUCLEAR REGULATORY COMMISSION

,

(

.-

r*

REGloN li

g*

L E

230 PEACHTREE STREET, N.W. SUITE 1217

'#

o,

ATLANTACEoRGN5

0303

+

.....,/

JAN

9

g

In Reply Refer To:

RII:RHW

50-302/77-25

Florida Power Corporation

i

Attn:

Mr. W. P. Stewart

Power Production

P. O. Box 14042, Mail Stop C-4

St. Petersburg, Florida 33733

Gentlemen:

This refers to the inspection conducted by Mr. R. H. Wessman of this

office on December 12-16, 1977, of activities authorized by NRC Operating

License No. DPR-72 for the Crystal River 3 facility, and to the discussion

of our findings held with Mr. G. P. Beatty, Jr. at the conclusion of the

inspection.

'

Areas examined during the inspection and our findings are discussed in

'

the enclosed inspection report. Within these areas, the inspection

consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspectors.

Within the scope of this inspection, no items of noncompliance were

disclosed.

We have examined actions you have taken with regard to' previously reported

unresolved items. The status of these items is discussed in the enclosed-

report.

In accordance with Section 2.790 of the NRC's " Rules of Practice",

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and

the enclosed inspection report will be placed in the NRC's Public

Document Room.

If this report contains any information that you (or

your contractor) believe to be proprietary, it is necessary that you

make a written application within 20 days to this office to withhold

such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is

claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained

in a separate part of the document.

If we do not hear from you in this

regard within the specified period, the report will be placed in the

Public Document Room.

8002280 9 7 /

. - . . - .

-.. - -

-.

..

--

-

-

-

_-,.w.

-_y. , . .

,.m-,.---..

_.

n ,_-,-

.,,wy

,

u

2

.

~

4

.

JAN

g 1978

.

'

.

Florida Power Corporation

-2-

4

-

t

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

,

Sincerely,

9

u

F. J. Long, Chief

Reactor Operations and

-

Nuclear Support Branch

Enclosure: RII Inspection Rpt.

No. 50-302/77-25

cc w/ enc 1:

Mr. G. P. Beatty, Jr.

Nuclear Plant Superintendent

,

l

P. O. Box 1228

'

Crystal River, Florida 32629

'

)

'

i

I

!'

l

,

.

,

!

~

)

.

l

l

!

l

...

4.

.-

--

_,.

_. . . - _ . . _ _ _ . , _ _ _ _ _ . _ .

_

,_ . _ . - , _ ,

_ .- , ._

.

. .

. -

. . . _ .

. _ . _ . , . _ _ , _ _ . _ .

-