See also: IR 05000302/1977021
Text
. ' '
.
.,
. . - . . . - . .
-
1
i
!
/ *'49
UN4TED STATES
'
U
jo,
NUCLEAR REGULATORY COMMISSION
g
' c / f ,g
lEfiLE COPY
REGION II
..
f
g
230 PEACH TnEE STREET. N.W. SUITE 1217
o,
h
S
ATLANTA, GEORGIA 30303
,
%, % p
....*
2 1977
In Reply Refer To:
RII:RIiW
50-302/77-21
1
Oi
0
Florida Power Corporation
s Q
Attn:
Mr. W. T. Stewart, Director
'
ni.
,g9 }
Power Production
1
0
P. O. Box 14042, Mail Stop C-4
~;hJ
3
~
,"L
St. Petersburg, Florida
33733
Centlemen:
This refers to the inspection conducted by Mr. R. H. Wessman of this
office on November 8-10, 1977, of activities authorized by NRC Operating
License No. DPR-72 for the Crystal River 3 facility, and to the discussion
of our findings held with Mr. G. P. Beatty, Jr. at the conclusion of the
inspection.
g
\\
/
Areas examined daring the inspection and our findings are discussed
in the enclosed inspection report. Within these areas, the inspection
consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspectors.
We have examined actions you have taken with regard to previously identi-
.
fled enforcement matters and unresolved items.
The status of these items
is discussed in the enc.osed report.
One new unresolved item resulted from this inspection and is discussed
in the enclosed report. This item will be examined during subsequent
inspections.
During the inspection, it was found that certain activities under your
license appear to be in noncompliance with NRC requirements.
This
item and references to pertinent requirements are listed in the Notice
of Violation enclosed herewith as Appendix A.
This notice is sent to
you pursuant to the provisions of Section 2.201 of the NRC's " Rules of
Practice," Part 2, Title 10. Code of Federal Regulations.
Section 2.201
requires you to submit to this office, within 20 days of your roccipt of
this notice, a written statement or explanation in reply including:
(1)
corrective steps which have been taken by pu and the results achieved;
(2) corrective steps which will be taken to avoid further noncompliance;
i
and (3) the date when full compliance will be achieved.
b
8002 280 [g
-
.
_
__
,
.
.
-.. .
'
.
m
.
Q(3
- -
DF.u
uti
.
Florida Power Corporation
-2-
In accordance with Section 2.790 of the NRC's " Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, a copy of this letter
and the enclosed inspection report will be placed in the NRC's Public
Document Room.
If this report contains any information that you (or
your contractor) believe to be proprietary, it is necessary that you
make a written application within 20 days to this office to withhold
such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is
claimed that the information is proprietary, and should be prepared
so that proprietary information identified in the application is con-
tained in a separate part of the document.
If we do not hear from you
in this regard within the specified period, the repart will be placed
in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
l
+Y
F. J. Long, Chief
Reactor Operations and
Nuclear Support Branch
Enclosures:
1. Appendix A, Notice of Violation
2. Inspection Report No. 50-302/77-21
cc:
Mr. Mr. G. P. Beatty, Jr.
Nuclear Plant Superintendent
P. O. Box 1228
0 h T9
Crystal River, Florida
32629
0
vii,,n
n
@ "O
~
@ n 7:
p
.1 L 4 6
w
,
J
'
.-.