ML19308D481

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-302/72-01 on 720201-04.No Noncompliance Noted
ML19308D481
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 04/05/1972
From: Moseley N
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Henderson J
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML19308D482 List:
References
NUDOCS 8002280790
Download: ML19308D481 (1)


See also: IR 05000302/1972001

Text

,.

.

t

.

g

UNITED STATES

ATOMIC ENERGY COMMISSION

l el

e

!

DIVISION OF COMPLIANCE

REGloN ll - SulTE 818

230 PEACHT REE ST REET. NORT HWEST

7 ,Lc,,,,cn

,,,,,,,,,,,,,

AT L ANT A. GEORGl A 30303

April 5, 1972

J. B. Henderson, Chief, Reactor Construction Branch

Division of Compliance

FLORIDA POWER CORPORATION (CRYSTAL RIVER 3), LICENSE NO. CPPR-51, DOCKET

NO.30-302

-

The attached report of a routine unannounced inspection of the subject

facility on February 1-h,1972, is forwarded for information.

No items

of nonc.ompliance or nonconformance were found.

It is difficult to explain how a functioning quality program can allow

misplacement or loss of a pressurizer safety valve and a relief valve.

This matter and its implications will be pursued in future inspections.

(N

Our inspectors do not believe that significant deficiencies exist in the

t

areas of visual inspection of joint preparation of containment liner

,

plates and lack of defined procedures for routine veld repairs on the

liner plate. The applicable code does not establish specific requirements

in these areas.

N. C. Moccley

CO:II:NCM

Senior Reactor Inspector

Enclosure:

CO Rpt. No. 50-302/72-1

(Warnick)

cc w/ encl:

E. G. Case, DRS (3)

,

R. S. Boyd, DRL (2)

)

R. C. DeYoung, DRL (2)

i

D. J. Skovholt, DRL (3)

H. R. Denton, DRL (2)

L. Kornblith, Jr., C0

R. H. Engelken, CO

J. P. O 'Reilly, CO:I

( ])

f

B. H. Grier, C0:III

J. W. Flora, C0:IV

Nd

R. W. Smith, CO:V

C0 Files

8002280 270

DR Central Files

P

.