Forwards IE Insp Rept 50-302/78-02 on 780109-13 & Notice of Violation
ML19308D476
Person / Time
Site: Crystal River 
Issue date: 02/02/1978
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stewart W
FLORIDA POWER CORP.
Shared Package
ML19308D468 List:
References
NUDOCS 8002280785
Download: ML19308D476 (2)


See also: IR 05000302/1978002

Text

.

%

,.

-

p nee

j

ug#o,

UNITED STATES

'

NUCf. EAR REGULATORY COMMISSION

,

3

o

REGION 11

2

$

230 PEACHTRE E STREET, N.W. CJITE 818

'

~s.,

/

ATLANTA, GEORGIA 303%1

.....

FEB

2 1978

In Reply Refer To:

gh

RII:RHW

50-302/78-2

Op

,

Florida Power Corporation

Attn:

Mr. W. P. Stewart, Director

Power Production

P. O. Box 14042, Mail Stop C-4

St. Petersburg, Florida

33733

Gentlemen:

This refers to the inspection conducted by Mr. R. H. Wessman of this

office on January 9-13, 1978, of activities authorized by NRC Operating

License No. DPR-72 for the Crystal River 3 facility, and to the discussion

of our findings held with Mr. G. P. Beatty, Jr. at the conclusion of the

inspection.

\\

{

(%

Areas examined during the inspection and our findings are discussed in

- \\

the enclosed inspection report. Within these areas, the inspection

consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

We have examined actions you have taken with regard to previously

reported unresolved items. The status of these items is discussed in

the enclosed report.

One new unresolved item resulted from this inspection and is discussed

in the enclosed report. This item will be examined during subsequent

inspections.

During the inspection, it was found that certain activities under your

l

license appear to be in noncompliance with NRC requirements. This

item and references to pertinent requirements are listed in the Notice

of Violation enclosed herewith as Appendix A.

This notice is sent to

you pursuant to the provisions of Section 2.201 of the NRC's " Rules of

'

Practice," Part 2, Title 10, Code of Federal Regulations.

Section 2.201

requires you to submit to this office, within 20 days of your receipt of

this notice, a written statement or explanation in reply including:

(1)

corrective steps which have been taken by you and the results achieved;

(2) corrective steps which will be taken to avoid further noncompliance;

and (3) the date when full compliance will be achieved.

8002280 [

l

,

. , -

_.

s

-

O

..

FEB

? 1978

..

.

,

),

Florida Power Corporation

-2-

-

In accordance with Section 2.790 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter

j

and the enclosed inspection report will be placed in the NRC's Public

Document Room. If this report contains any information that you (or

your contractor) believe to be proprietary, it is necessary that you

-

make a written application within 20 days to this office to withhold

such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is

i

claimed that the information is proprietary, and should be prepared so

l

that proprietary information identified in the application is contained

in a separate part of the document. If we do not hear from you in this

regard within the specified period, the rcport will be placed in the

Public Document Room.

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely.

-

0

F. J. Long, Chief

l

Reactor Operations and Nuclear

,

Support Branch

Enclosures:

1.

Appendix A, Notice

of Violation

2.

RII Inspection Report No.

50-302/78-2

cc w/ enc 1:

Mr. G. P. Beatty, Jr.

Nuclear Plant Superintendent

P. O. Box 1228

Crystal River, Florida 32629