ML19308D337
| ML19308D337 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 09/17/1976 |
| From: | Rodgers J FLORIDA POWER CORP. |
| To: | Long F NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML19308D335 | List: |
| References | |
| NUDOCS 8002270793 | |
| Download: ML19308D337 (1) | |
Text
,.U s; J D-h
.,n -n m ru., _,,;,')Cg I.. f bkb'
-cocoa Florida Power
~
Septeder 17, 1976' Mr. F. J. Img, Chief Reactor Operations and Nuclear Support Branch U. S. Nuclear Regulatory Comission Region II 230 Peachtree Street NW, Suite 818 Atlanta, Georgia 30303 Stbject: IE:II:FJ 50-302/76-11
Dear Mr. Long:
We wish to amend our letter to you of August 9 regarding our response to the deficiency addressed in your report of Visit 76-11. Our responses concerning the corrective action noted as No.1, No. 2 and No. 3 are amended as follows:
1.
FPC Quality Manual Procedure QP 14.11 is being revised to delete reference to permanently installed instrumentation and controls.
H is revision has completed the in-house review cycle and will be issued by September 24, 1976.
2.
Interoffice memo of Deceder 19,1975, MGT-505, was in error regard-ing calibration stickers on safety-related instruments. These are i
now void and are to be disregarded.
j He subsequent paragraphs of ote August 9 letter remain as written.
We hope this amendnent clarifies the manner with which we have addressed this problem.
If you have any further questions, please advise.
Yours very tIuly, J.
. Rodgers Assistant Vice President JTR/pb 8002270 7 [ 3
m,