RO-77-66:on 770620,SP-344 for Nuclear Svcs Closed Cycle Cooling Sys Operability Not Performed within Required Time Frame.Caused by Schedule Change.New Surveillance Schedule Written
ML19308D331
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 07/13/1977
From: Stewart W
FLORIDA POWER CORP.
To:
Shared Package
ML19308D330 List:
References
NUDOCS 8002270784
Download: ML19308D331 (2)


Text

I CONTROL DLOCK:( l' l

l l

l l

~

[PLEATE PR'NT ALL ntOUIRtD INF0nt.1/m I

0

' f, LCENSEE LCENSE EYENT NAME LCENSE NUMcEA TYPE TYPE

! g.l vp. l cl a l e l 3 l lo lo l-lo l o l o l o l o l-l o l o l l4l1l1l1Ili l0l3l J

'D 14 15 25 26 30 31 32 V

"N [$N cock'ET NuMcEn EVENT OATE REPoAT cATE CATEcony T

o 1 CONT l - l - l W W lo ls lo l-l0 l3lo12 l l0 l6 l2 !0 -l7 l7l l 0 l 7 l1 l3 l7 l 7 0 67 b6 59 60 01 60 GD 74 75 EVENT DESCRIPTION gp l In the process of reviewing completed surveillance procedtires, it was discovered 7 09 03 l that SP-344, Nuclear Services Cooling System operability had not been performed within 7 09 04 l the time frame' required by Tech Specs 4.7.3.1 & 4.3.3.5.

Redundancy NA.

First time 7 89 05 l occurrence.

SP.M4 was completed as scheduled by new surveillance schedule nmandad 7 09 0C l to meet ASME Section YT (LER 77-66) 7 09 pwg system cAUSE COMPONENT COMPCNENT CCCE CQCE CCMPONENT CoCE

. SUPPMA MAhufACTUACA VOLATON c

,lW l B l lDl l Z l Z l Z l Z l Z l Z'l lZl l Zl 9 l 9 l 9 l lN l 7 00 to 11 12 17 43 44 47 40 CAUSE DESCRIPTION 9

lThe schedule of surveillance procedures was changed to comply with the new ASME Section XI-ag 7 89 ag l requirements causing a shif t in scheduling dates.

This should preclude recurrence of 7 89 lthis event.

FACLrry MEYw00 oF status

% PoWEA cTHER STATUS CE;3VEAy cGCovERY CISCA@ TON lEl l 1l 0l o j l

NA l

lZl l Reviewing completed surveillance proce.

70 9

10 12 13 44 a5 46 ures A E5 of

(_Z,j

(,Z_jASE l l

l AM3UNT oF ACTMTY LCCATCN oF RELEASE 12 NA m

7 8 9

10 11 44 45 PERSONNEL EXPOSURES NuMOTA TvPE DESCA:PTCN 13 l0 l0 l 0 l Wl NA 7 89 11 12 13 PERSONNEL INJun1ES NUMBEA DESCAiPTON l0lnlnl l

NA 14 7 89 11,12 OFFSITE CONSEQUENCES NA j

13 l l

7 00 l

LOSS OR DAMAGE TO FACILITY l

TYPE CESCA:PTON i

h b l_

NA l

7 8D 10 l

PUDLICITY

@l NA 7 89 8002 MO 2 7

[

)ADOITIONAL FACTORS

{ /l See attached St.pplementary Information 7 00 7

7 09

/

W. P. Stewart k (813) 866-4159 NAME:

Pi1ONE:

Supplamentcry Information

~1.

Report No.:

50-302/77-58 G.

Facility:

Crystal River Unit #3 3.

Report Date:

13 July 1977 4.

Occurrence Date:

20 June 1977 5.

Identification of occurrence:

Failure to demonstrate the operability of the nuclear services closed cycle cooling system within the time frame required by Technical Specification 4.7.3.1 and 4.3.3.5.

6.

Conditions Prior to Occurrence:

Mode 1 pcwer operatton 7.

Descriptica of Occurrence:

At 1530 w' tile reviewing completed surveillance procedures, it was discovered that the surve.illance procedure for nuclear services cooling system operability (SP-344) had last been performed on 10 May 1977. A change to the surveillance schedule had been effected in order to comply with the ASME Section XI and SP-344 was scheduled and comp.!eted on 24 June 1977.

'Ihe new surveillance schedule will insure Tech Specs frequency requirements are met.

8.

Designation of. Apparcr.t Cause:

\\

j The schedule of surveillance procedures was changed to comply with the new ASME

~

Section XI requirmnen'.s causing a shift in scheduling dates.

9.

Analysis of Occurrence:

There were no safety implications as the cooling system was in operation during this period except for plant outage period.

10.

Corrective Action:

The new surveillance schedule will preclude recurrence of this event.

11.

Failure Data:

There have been no previous occurrences of this event from this cause.