ML19308D330

From kanterella
Jump to navigation Jump to search
Forwards RO-77-66
Date released: 11/18/2019 Download: ML19308D330


RO-77-66:on 770620,SP-344 for Nuclear Svcs Closed Cycle Cooling Sys Operability Not Performed within Required Time Frame.Caused by Schedule Change.New Surveillance Schedule Written
ML19308D331
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 07/13/1977
From: Stewart W
FLORIDA POWER CORP.
To:
References
Download: ML19308D331 (2)
Forwards RO-77-66
ML19308D329
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 07/13/1977
From: Stewart W
FLORIDA POWER CORP.
To: MOSELEY N C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19308D329 (1)