ML19308D319
| ML19308D319 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 03/15/1977 |
| From: | Stewart W FLORIDA POWER CORP. |
| To: | |
| Shared Package | |
| ML19308D316 | List: |
| References | |
| NUDOCS 8002270762 | |
| Download: ML19308D319 (2) | |
Text
" ' " ~ ~ ~~
~~~
' " ~ ~
~ ~
4.^.s v 4.~n7G3 C.a.
L. i, 6 4 r
- I n L.8 T.J i l l l,
CONTROL ULOCn:l l
l l
l l
jtCAsS pntNT fLL RESUIRED INFOlis.1AT;"JJJ 1
6
- UCENSEE (CENSE EVENT NAME LCENSE NUM0 Ell TYPC TYPC FlLlCfRlPl3l lO!0l~lO!O!O!0lnl-lO!0l l4l1 l1 l 1l 1l l0l1l 7
9 4
14 1b 25 26 30 31 32 UN CATEGOilf f
OOCxET NUMUER EVENT OATE REPORT DATE ECON 41 - I -J LL_J LLJ 1015101-101310 l2 l 10I,10 la 17 l7 1 1013111s1717 i 7 8 57 50 59 GO 61 68 69 74 75 00 EVENT DESCalPTION
$l Miile operatinn at 40 eercent power. steadv state. Main Steam Relief Valve MSV-35 l
7 89 UO E l opened at 985 osic. This is below Technical Snecification value of 1090 esic.
Thero l
7 89 00 hl were redundant systems operable and available. A sicillar occurrence of this type l
7 89 80 h!
occurred on 25 February lo77.
As soon as cl ane enndf rions ne mi-end. Php 14ft spe-l
/U9 80 oin I point of 1050 psig was re-established.
(77-22) l 7 89 pnug 60 svertu CAust COuvumeNT couPONtNT CODE COCE COMPONENT CODE SUPREA MANUFAC1URER VOLATON O
lC lC l lEl lVlAlLlVlElXl
.W lD l 214 l 3 j lN l 7 89 10 11 12 17 43 44 47 48 CAUSE DESCRIPTION
]*
5.
hl MSV-35 Relief Valve lif ted due to reasons that are unknown at this time as the balance l
/ 89 60
@l of the Relief Valves did not open.
l
/ 09 80 FI I
FacsLify METHOO OF
]-
Status
% POWER OTHER STATUS OrSCOVEnY OCCOVEnY CESCR'PfCN lEl l 0l 4l 0l l N/A l @
~ l-N/A l
/ U 9
10 12 13 44 45 46 CO ac w Tv CONTENT AE'.EACCD OFftELEASEl AMOUNT OF ACTMTV LOCATON OF AELEASE
'h W
l, Z)
N/A l
l N/A l
8 9
10 11 44 45 80 PERSONNEL EXPOSunES NUMBER TYPE OLSCRipf0N
@ l0l0)0l l Zl' I N/A l
89 11 12 13 00 PERSONNEL INJURIES NUMOE88 OESCnIPTON 3 l0l0l0l l
N/A l
89 11 12 CD OFFSITE CONSEQUENCES hl 00 LO LOSS On OAMAGE TO FAC:UTY TYPE GECCJ1tPf0N 3dl
'N/A u9 to l'O PllWUCITY
]l N/A
_ _ _l u9 UU 8Q02 270 M2 MOITIONAL FACTOn3 See the attached Supplementary Information.
~
l
.s, lb.l,.
b
/
n g
ti.
- NArat, z P. Stewart r u otar (813)._Hfi6 4159._
e
(-
Supplementary Information 1.
Report No:
50-302/77-22 2.
Facility:
Crystal RLver Unit 3 3.
Report Date:
8 March 1977 4.
Occurrence Date: 15 March 1977 5.
Identification of Occurrence:
Main Steam Relief Valve MSV-35 lifted at a pressure of 985 psig. The required setpoint is 1050 psig i 12.
6.
Conditions Prior to Occurrence:
On 8 March 1977, Crystal River Unit 3 was in Mode 1 condition at 40% power.
7.
Description of Occurrence:
5-During Mode 1, steady state, the Main Steam Relief Valve MSV-35 opened below the required setpoint. No other MSV's opened at this time. There was no safety significance as the overpower trip setpoint was set at 50%.
The balance of the MSV's were operable and redundancy was maintained.
When plant conditions permitted, the setpoint was checked and reset.
8.
Designation of Apparent Cause of Occurrence:
The cause of this occurrence was determined to be a normal setpoint drift.
9.
Analysis of Occurrence:
This was the second occurrence of this type of event, but the first involving MSV-35.
The setpoint was calibrated as soon as conditions permitted.
10.
Corrective Action:
Main Steam Relief Valve MSV-35 was calibrated to the correct lift setpoint j
of 1050 psig i 1%.
11.
Failure Data:
There has been one other occurrence of this event involving MSV-36 on 25 February 1977.