ML19308D316

From kanterella
Jump to navigation Jump to search
Forwards RO-77-22
Date released: 11/18/2019 Download: ML19308D316


RO-77-22:on 770308,main Steam Relief Valve MSV-35 Opened at 985 Psig While Operating at 40% Power.Caused by Relief Valve Lifting Due to Setpoint Drift.Main Steam Relief Valve Calibr to Correct Lift Setpoint
ML19308D319
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 03/15/1977
From: Stewart W
FLORIDA POWER CORP.
To:
References
Download: ML19308D319 (2)
Forwards RO-77-22
ML19308D315
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 03/14/1977
From: Stewart W
FLORIDA POWER CORP.
To: MOSELEY N C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
Download: ML19308D315 (1)