Text
.
,
.
.
-
-
-
- ,
,0
g n arg *
UNITED STATES
,
g#o
NUCLEAR REGULATORY COMMISSION
.
g
[
o
REGloN il
$
230 PEACHTREE STREET. N.W. SUITE 818
-
3
k
8
ATLANTA. GEORGIA 30303
% ,,,,,
DEC 2,11976
IEm OOR
In Reply Refer To:
IE:II:FJ
50-302/76-22
,
Florida Power Corporation
Attn:
Mr. W. T. Ste. cart
Director of Power Production
I
320134th Street, South
P. O. Box 14042
'
St. Petersburg, Florida 33733
l
i
Gentlemen:
This refera to the inspection conducted by R. F. Rogers on November 3-6,
j
G. L. Troup on Ncvember 9-10, S. D. Ebneter en November 10-12 and
F. Jape on November 15-19, 1976 of this office, of activities authorized
by NRC Construction Permit No. CPPR-51 for the Crystal River 3 facility,
b
and to the discussion of our findings held with J. Alberdi at the con-
\\
clusion of the inspection.
Areas examined during the inspection and our findings are discussed in
the enclosed inspection report. Within these areas, the inspection
consisted of selective examination of procedures and representative
records, interviews with personnel, and observ .tions. by the inspector.
We have examined actions you have taken with regard to previously
reported unresolved items.
'"cese are identified in Section IV of the
summary of the enclosed report.
During the inspection, it was found that certain activities under your
license appear to be in noncompliance with NRC requirements. This
item and references to pertinent reciuirements are listed in Section I
of the summary of the enclosed report.
This notice is sent to you pursuant to the provisions of Section 2.201
of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal
Regulations. Section 2.201 requires you to submit to this office,
lithin 20 days of your receipt of this notice, a written statement or
explanation in reply including:
(1) corrective steps which have been
taken by you, and the results achieved; (2) corrective steps which will
be taken to avoid further noncompliance; and (3) the date when full
compliance will be achieved.
O)
'
tNJ
,
-
80022ro 7q3
.
_
..
'
Uht, , , sJl0
,
S
.
'
1
Florida Power Corporation
-2-
.
In accordance with Section 2.790 of the NRC's " Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, a copy of this letter
i
and the enclosed inspection report will be placed in the NRC's Public
Document Room. If this report contains any information that you believe
)
to be proprietary, it is necessary that you submit a written application
i
to this office requesting that such information be withheld from public
)
disclosure. If no proprietary information is identified, a written
l
statement to that effect should be submitted.
If an application is
submitted, it must fully identify the bases for which information is
claimed to be proprietary.
The application should be prepared so that
informacion sought to be withheld is incorporated in a separate paper
and referenced in the application since the application will be placed
in the Public Document Room. Your application, or written statement,
should be submitted to us within 20 days.
If we are not contacted as
specified, the enclosed report and this letter may then be placed in the
Public Document Room.
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Very truly yours,
d'
ims ff
%
'
]
F!J.Long', Chief
'
/# . Reactor Operations and Nuclear
Support Branch
Enclosure:
IE Inspection Report No.
50-302/76-22
cc: Florida Power Corporation
,
G. P. Beatty, Jr.
P. O. Box 1228
Crystal River, Florida 32629
,
f
(v)
.
.
t