Forwards IE Insp Rept 50-302/77-03 on 770222-25. Noncompliance Noted
ML19308D220
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 03/14/1977
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stewart W
FLORIDA POWER CORP.
Shared Package
ML19308D195 List:
References
NUDOCS 8002270681
Download: ML19308D220 (2)


See also: IR 05000302/1977003

Text

O

' *N&

O

,

'

'

  1. g8 M%g'o,,

UN6TED STARES

NUCLEAR REGULATORY COMMISSION

(-

r

230 PEACHTREE sTREE7, N.W. sulTE stb

e

p

,e

g

REGION ll

k

[

ArLANTA, CEORGI A 30303

'g p

"%.,,,,

MAR ? 41977

In Reply Refer To:

IE:II:FJ

50-302/77-3

Florida Power Corporation

Attn:

Mr. W. T. Stewart

Director of Power Production

3201

'.th Street, South

P. O. Box 14042

St. Petersburg, Florida

33733

Gentlemen:

This refers to the inspection conducted by Mr. Frank Jape of this office

on February 22-25, 1977, of activities authorized by NRC Operating

License No. DPR-72 for the Crystal River 3 facility, and to the discus-

sion of our findings held with Mr. G. P. Beatty, Jr. at the conclusion

of the inspection.

Areas examined during the inspection and our findings are discussed in

the enclosed inspectica report. Within these areas, che inspection

N

consisted of selective examination of procedures and representative

records, interviews with personnel, and observations by the inspector.

We have examined actions you have taken with regard to previously

,

reported unresolved items. These are identified in Section IV of the

summary of the enclosed report.

One new unresolved item resulted from this inspection and is identified

in Section III of the sunmary of the enclosed report. This item will be

examined on subsequent inspections.

During the inspection, it was found that certain activities under your

license appear to be in noncompliance with NRC requirements. This item

l

and references to pertinent requirements are listed in Section I of the

summary of the enclosed report.

This notice is sent to you pursuant to the provisions of Section 2.201

of the NRC's " Rules of Practice," Part 2. Title 10 Code of Federal

Regulations.

Section 2.201 requires you to submit to this office,

within 20 days of your receipt of this notice, a written statement

or explanation in reply including:

(1) corrective steps which have

been taken by you, and the results achieved; (2) corrective steps

'

'

which will be taken to avoid further noncompliance; and (3) the date

}

when full complianca will be achieved.

a

!

8002270 6 8/

- _ _ . _ _

,

. _ - _ .

_ _ .

_

_

__

,

~

>e

- MAR I 41977

-

T

-

.

Florida Power Corporation

-2-

,

_

In accordsnce with Sectior. 2.790 of the NRC's " Rules of Practice,"

Part 2 Title 10, Code of Federal Regulations, a copy of this letter

and the enclosed inspection report will be placed in the NRC's Public

Document Room.

If this report contains any information that you believe

to be proprietary, it is necessary that you submit a written application

to this office requesting that such information be withheld from public

disclosure.

If no proprietary information is identified, a written

statement to that effect should be submitted.

If an application is

submitted, it must fully identify the bases for which information is

claimed to be proprietary. The application should be prepared so that

infonnation sought to be withheld is incorporated in a separate paper

an/. referenced in the application since the application will be placed

in the Public Document Room. Your application, or written statement,

should be submitted to us within 20 days.

If we are not contacted as

specified, the enclosed report and this letter may then be placed in

'

the Public Document Room.

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Very truly yours,

'

%

4_

l

0 W

F. J. Long, Chief

Reactor Operations and

Nuclear Support Branch

Enclosure:

IE Inspection Report No.

50-302/77-3

cc:

Mr. C. P. Beatty, Jr.

Crystal River Unit 3 Plant Manager

Florida Power Corporation

P. O. Box 122o