ML19308D203
| ML19308D203 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 11/20/1972 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Henderson J US ATOMIC ENERGY COMMISSION (AEC) |
| Shared Package | |
| ML19308D165 | List: |
| References | |
| NUDOCS 8002270667 | |
| Download: ML19308D203 (1) | |
See also: IR 05000302/1972004
Text
{{#Wiki_filter:. , \\ eM"' "4 UNITED STATES ~ \\ (d [[ hon t ATOW ENERGY COMMISSION L. T.D . 4 (13DOGOG000GOGGEDet
' REC lO N li - SUIT E 818 Q*
4 / p 230 PE AC r R EE ST AEET, NC AT HWEST
- * " " ' '
- fJtts 6%
A T L A >4T A, G E ORG A 30303 D7P'- NRATE OF REGULATORY OPERATIONS NOV 2 01972 J. B. Henderson, Chief, Reactor Construction Branch Directorate of Regulatory Operations, Headquarters FIORIDA POWER CORPORATION (CRYSTAL RIVER 3), LICENSE NO. CPPR-51, DOCKET NO. 50-302 Attached is the report of a special inspection conducted on September 25, 1972, at Crystal River 3 This inspection was to review the progress made by FPC in removing the defective concrete placement located below the equipment hatch opening. FPC's procedures and repair efforts will be reviewed during future inspections. ) 'v C. E. A g Chief , RO:II:CEM Reactor Test and Startup Branch Enclosure: RO Rpt. No. 50-302/72-4 cc w/ enc 1: j RO:HQ(5) DR Central Files i Regulatory Standards (3) l Directorate of Licensing (13) ' cc enc 1. caly* I
- PDR
- Local PDR
- NSIC
- DEIE, OR
~ -
- -*-
"To be dispatched at a later date. . . . - . .. __ V. - ' R. C ~; . . . . 8002270 6 6 7 , . . _-. }}