ML19308D203

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-302/72-04 on 720925.No Noncompliance Noted
ML19308D203
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 11/20/1972
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Henderson J
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML19308D165 List:
References
NUDOCS 8002270667
Download: ML19308D203 (1)


See also: IR 05000302/1972004

Text

{{#Wiki_filter:. , \\ eM"' "4 UNITED STATES ~ \\ (d [[ hon t ATOW ENERGY COMMISSION L. T.D . 4 (13DOGOG000GOGGEDet

' REC lO N li - SUIT E 818 Q*

4 / p 230 PE AC r R EE ST AEET, NC AT HWEST

  • * " " ' '
  1. fJtts 6%

A T L A >4T A, G E ORG A 30303 D7P'- NRATE OF REGULATORY OPERATIONS NOV 2 01972 J. B. Henderson, Chief, Reactor Construction Branch Directorate of Regulatory Operations, Headquarters FIORIDA POWER CORPORATION (CRYSTAL RIVER 3), LICENSE NO. CPPR-51, DOCKET NO. 50-302 Attached is the report of a special inspection conducted on September 25, 1972, at Crystal River 3 This inspection was to review the progress made by FPC in removing the defective concrete placement located below the equipment hatch opening. FPC's procedures and repair efforts will be reviewed during future inspections. ) 'v C. E. A g Chief , RO:II:CEM Reactor Test and Startup Branch Enclosure: RO Rpt. No. 50-302/72-4 cc w/ enc 1: j RO:HQ(5) DR Central Files i Regulatory Standards (3) l Directorate of Licensing (13) ' cc enc 1. caly* I

  • PDR
  • Local PDR
  • NSIC
  • DEIE, OR

~ -

  1. -*-

"To be dispatched at a later date. . . . - . .. __ V. - ' R. C ~; . . . . 8002270 6 6 7 , . . _-. }}