Responds to NRC Re Deviation Noted in IE Insp Rept 50-302/77-08.Corrective Actions:Drum Roller Mixer to Be Purchased,Fsar Change to Be Requested & Cost/Benefit Analysis Completed Indicating Sys Not cost-beneficial
ML19308D188
Person / Time
Site: Crystal River 
Issue date: 06/15/1977
From: Stewart W
FLORIDA POWER CORP.
To: Moseley N
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19308D172 List:
References
CS-77-109, NUDOCS 8002270655
Download: ML19308D188 (2)


Text

-. __

i m

'O

)-

p-()

ee M

15 June 1977 g

CS-77-109 ca.........

3-0-3-a-2 Mr. Norman C. Moseley, Director Docket No. 50-302 Office of Inspection & Enforcement License No. DPR-72 U.S. Nuclear Regulatory Commission Ref: IE:II:GLT 230 Peachtree St., N.W., Suite 818 50-302/77-8 Atlanta, Georgia 30303

Dear Mr. Moseley:

We offer the following in response to the apparent item of Noncompliance noted in the referenced Inspection Report.

" Deviation-Radioactive Solid Waste Packaging System Contrary to FSAR Section 11.2.5, the radioactive solid wasta packaging system is not functional and is not capable of pro-cessing evaporator concentrates for off-site shipment in accordance wirn applicable regulations."

Corrective steps that are being/have been/will be/taken are as follows:

- A drum roller mixar will be purchased to make our present system operable.

- We are requesting a change be incorporated in the FSAR, Section 11.2.5.1, paragraph 2, to reflect the use of the drum roller mixer.

- We have completed a Cost Benefit Analysis on the use of the con-crate solidification system and at present, indications point out that our present system is not cost beneficial to operate, and does not conform to the ALARA philosophy.

- As long as it is available and economically feasible, we are going to utiliza an outside vendor to perform the solidification process for the Radwaste Program.

- We will establish an operating plan for the utilization of our in-plant solidification system to support our Radwaste management program as required.

8 8002270

,m q

Norman C. Moseley, Director Ref.: IE:II:GLT 50-302/77-8 Page 2 Full compliance is expected to be achieved by 1 October 1977.

4 We find no proprietary information in the Referenced Inspection Report.

Should you have any questions concerning this subject, we will be glad to discuss them with you.

Yours truly, La.?$-wa W. P. Stewart Director, Power Production DWP/rc

. leb W S

/v/NuclearPlantManager i