Responds to NRC Re Deviation Noted in IE Insp Rept 50-302/77-08,supplementing 770615 Response.Util Unable to Meet 771001 Compliance Date Re Solid Radwaste Packaging Sys.Compliance Scheduled for 790101
ML19308D177
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 09/22/1977
From: Stewart W
FLORIDA POWER CORP.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19308D172 List:
References
CS-77-107, NUDOCS 8002270647
Download: ML19308D177 (2)


Text

.h-m

)

i

.P..o..w..e...r

"^ia*A"A%"Ja" September 22, 1977 CS-77-107 3-0-3-a-2 Mr. J.P. O'Reilly, Director Office of Inspection & Enforcement U.S. Nuclear Regulatory Comission 230 Peachtree Street, N.W., Suite 818 Atlanta, GA 30303 Docket No. 50-302 License No. OPR-72

Reference:

IE: II:GLT 50-302/77-8

Dear Mr. O'Reilly:

Regarding our response of June 15, 1977, to the apparent item of non-compliance noted in the referenced inspection report:

" Deviation-Radioactive Solid Waste Packaging System 1

Contrary to FSAR Section 11.2.5, the radioactive solid waste packaging system is not functional and is not capable of processing evaporator concentrates for off-site shipment in accordance with

)

applicable regulations."

In our response we identified corrective steps and a comitment of October 1,1977, to achieve full compliance. We are unable to meet the comitment date d6 e to the following:

A drum roller mixer nas just been received and is scheduled for installation and functional testing by October 10, 1977. Operating, surveillance, and test procedures are being developed and are scheduled for completion by October 10, 1977.

A detailed testing program will have to be completed to determine parameters for operation of the system.

This will include the varying parameters in the celidification process such as boric acid content, activity, pH, and solidification agents using cement and sodium silicate.

i O

by7 8002270

v.

3 Mr. J.P. O'Reilly Page 2 September 22, 1977 It is still our intent to update the Crystal River Unit 3 FSAR, Section 11.2.5.1, Paragraph 2, to include the modification. This will be included in the next FSAR amendeant.

Full compliance is expected to be achieved by January 1, 1979.

Should you have any questions concerning this subject, we will be glad to discuss them with you.

Very truly yours, F

W.P. Stewart PYD/WPS/js 4/10 Ib l